Value Stream Mapping (VSM), Project management, Public works, lean management, lean office

Abstract

The development of public works is frequently compromised by flaws in the design phase, resulting in contractual amendments for time and cost. In this study, Value Stream Mapping (VSM) was applied to the development process of the Works and Engineering projects team in a municipality in Ceará, to identify waste and propose improvements. A case study was conducted with the sector's technical team, which assisted in mapping the information flow, drafting the Current State VSM, proposing the Future State VSM, and structuring a Kaizen Plan.The Current State VSM revealed a push-based and unstructured process, generating technical incompatibilities that trigger amendments during the execution of the works. A Lead Time of 373 days was observed, of which 301 days were simply waiting time, culminating in a value-added time ratio of 19.35%. With the Future State VSM and the Kaizen Plan, a reduction in Lead Time to 219 days (-41.29%) and in waiting times to 174 days (-42.19%) was projected, raising the value-added efficiency index to 22.35%.

Author Biographies

  • Luiz Felipe Alves Carvalho, Federal University of Ceará

    Mestrando em Arquitetura, Urbanista e Design pela Universidade Federal do Ceará (Fortaleza - CE, Brasil).

  • Clarissa Notariano Biotto, Federal University of Ceará

    Professora adjunta do Instituto de Arquitetura e Urbanismo e Design (IAUD) da Universidade Federal do Ceará (Fortaleza - CE, Brasil).

References

[1] CASOTTE, A. G. Z. Gestão de obras públicas: análise dos aditivos financeiros e temporais nos contratos de obras da Universidade Federal do Espírito Santo no período de 2009 a 2015. 2016. 127 f. Dissertação (Mestrado Profissional em Gestão Pública) - Universidade Federal do Espírito Santo. Vitória. 2016.

[2] SILVA, R. V. S. da. Obras públicas: um estudo de caso em duas instituições federais de ensino de Goiás e Tocantins. 2014. 113 f. Dissertação (Mestrado em Engenharia de Produção e Sistemas). Programa de Pós-Graduação em Engenharia de Produção e Sistemas Pontífica Universidade Católica de Goiás. 2014.

[3] BRASIL. Lei no 14.133, de 1o de abril de 2021: Lei de Licitações e contratos administrativos. Brasília, DF. 2021.

[4] CORRÊA, B. dos S.; SHIH, H. H. O. M. Gestão da obra pública: uma análise comparativa dos aditivos de valor e de prazo entre duas instituições federais de ensino. Revista Gestão Universitária na América Latina - GUAL, Florianópolis, v.12, n. 3, p. 130-150, set. 2019.

[5] RADNOR, Z.; WALLEY, P.; STEPHENS, A., BUCCI, G., EVALUATION OF THE LEAN APPROACH TO BUSINESS MANAGEMENT AND ITS USE IN THE PUBLIC SECTOR, Relatório de Pesquisa, Scottish Executive, Edimburgo: 2006.

[6] RADNOR, Z.; WALLEY, P. LEARNING TO WALK BEFORE WE TRY TO RUN: adapting lean for the public sector, public and money management, v. 28, n.1, pp.13-20, fev. 2008.

[7] TAPPING, D.; SHUKER, T. LEAN OFFICE: gerenciamento do fluxo de valor para áreas administrativas -8 passos para planejar, mapear e sustentar melhorias Lean nas áreas administrativas. 1ed. São Paulo: Leopardo Editora, 2010. 186p.

[8] ROTHER, M.; SHOOK, J. Aprendendo a Enxergar. Tradução de: José Roberto Ferro e Telma Rodriguez. São Paulo: Lean Institute Brasil, 2000.

[9] CARDOSO, G. N.; BIOTTO, C. N. Mapeamento do Fluxo de Valor em um Escritório de Arquitetura. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, 14., 2025. Anais [...]. Porto Alegre: ANTAC, 2025.

[10] OHNO, T. O Sistema Toyota de Produção: além da produção em larga escala. Tradução: Cristina Schumacher. Porto Alegre: Bookman, 1997.

[11] Koskela, L.. (2004). Making-Do — the Eighth Category of Waste. In Bertelsen, S., & Formoso, C. T. (Eds.), 12th Annual Conference of the International Group for Lean Construction.

[12] Buchanan, R. Wicked Problems Thinking in Design. Design Issues. Massachussets: The MIT Press (1992).

[13] XIA, W. SUN, J. Simulation guided value stream mapping and lean improvement: A case study of a tubular machining facility. Journal of Industrial Engineering and Management.p. 456-476, 2013.

Published

2026-08-28

How to Cite

CARVALHO, L. F. A.; NOTARIANO BIOTTO, C. Value Stream Mapping applied to the analysis and improvement of the design process: a case study in a public agency in a medium-sized city in the interior of Ceará. NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, v. 21, n. 1, 28 Aug.2026.

Similar Articles

1-10 of 50

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)