Building Information Modeling applied to electrical designs

an infrastructure cost analysis

Authors

DOI:

https://doi.org/10.46421/entac.v21i1.8940

Keywords:

BIM, Electrical design, Quantity take off, Cost Estimation

Abstract

In the traditional process of preparing engineering and architectural designs, one of the steps that can be exhausting is the quantitative take off through 2D drawings. As it is manual work, this activity is subject to errors that impact the budget and the cost estimation of the project. In this context, the literature points out that Building Information Modeling has a great advantage in the process of automatic quantitative extraction. The goal of this study is to analyze the cost of infrastructure, correlating the development in BIM compared to the traditional method for the case of an electrical project of a public building. The method includes comparative analysis of costs for the most relevant categories, considering the bills of materials both for the traditional 2D case and using the BIM model. As a result of the case study, it is demonstrated that the BIM approach provides greater precision in the cost estimation process when compared to the traditional method, indicating a reduction of approximately 5.60% in the total cost of the project of the items analyzed, with the category of conduits and curves being the one that presented the greatest divergence.

Author Biographies

  • Michelle Massessini Faria Freitas, Federal University of Minas Gerais

    Graduada em Engenharia Elétrica pela Universidade Federal de Minas Gerais. Mestranda em Construção Civil pela Universidade Federal de Minas Gerais. (Belo Horizonte - MG, Brasil)

  • Sidnea Eliane Campos Ribeiro, Federal University of Minas Gerais

    Doutora em Engenharia de Estruturas pela Universidade Federal de Minas Gerais. Professora Associada da Universidade Federal de Minas Gerais. (Belo Horizonte - MG, Brasil)

References

CBIC - CÂMARA BRASILEIRA DA INDÚSTRIA DA CONSTRUÇÃO. 10 Motivos para evoluir com o BIM. CBIC. – Brasília, DF: CBIC, 2016, Vol. 1.

BRASIL, Decreto n. 10.306, de 02 de Abril de 2020. Brasília, DF: Presidência da República, 2020.

BRASIL, Decreto n. 11.888, de 22 de Janeiro de 2024. Brasília, DF: Presidência da República, 2024.

SABOL, Louise. Challenges in cost estimating with Building Information Modeling. Design + Construction Strategies, v. 1, p. 1-16, 2008.

CBIC - CÂMARA BRASILEIRA DA INDÚSTRIA DA CONSTRUÇÃO. Coletânea: Implementação do BIM para Construtoras e Incorporadoras: Volume 01 - Fundamentos BIM. CBIC. – Brasília, DF: CBIC, 2016, Vol. 1, p. 31-32.

SACKS, Rafael, EASTMAN, Charles, GHANG, Lee, TEICHOLZ, Paul. BIM handbook: A guide to building information modeling for owners, designers, engineers, contractors, and facility managers. John Wiley & Sons, 2018, p. 24.

OLIVEIRA, Giulia Curi; SANTOS, João Felipe dos; MACIEL, Ana Carolina Fernandes; COSTA, Bruno Barzellay Ferreira da. Aplicação da modelagem BIM para fins de orçamentação em uma edificação residencial multifamiliar no Brasil. Brazilian Journal of Production Engineering, São Mateus, Espírito Santo, Brazil, v. 10, n. 5, p. 103–114, 2024. DOI: 10.5585/gep.v13i3.22337

SANTOS, Adriana de Paula Lacerda; ANTUNES, Cristiano Eduardo; BALBINOT, Guilherme Bastos. Levantamento de quantitativos de obras: comparação entre o método tradicional e experimentos em tecnologia BIM. Iberoamerican Journal of Industrial Engineering, v. 6, n. 12, p. 134-155, 2014. ISSN 2175-8018. Disponível em: https://periodicos.ufsc.br/index.php/IJIE/article/view/104516.

WAHAB, Abdul; WANG, Jun. Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, v. 29, n. 2, p. 702-715, 2021. DOI: 10.1108/ecam-10-2020-0823.

MIRANDA, Gustavo Macedo et al. Análise comparativa do maior impacto no orçamento extraído pelo método convencional e pela tecnologia BIM. Conjecturas, v. 22, n. 1, p. 1245-1259, 2022. ISSN: 1657-5830. Disponível em: https://www.researchgate.net/publication/367804144_Analise_comparativa_do_maior_impacto_no_orcamento_extraido_pelo_metodo_convencional_e_pela_tecnologia_BIM.

CARNEIRO, Vanessa Lima; CAMPOS, Ana Rita Sulz de Almeida; BORJA, Luis Claudio Alves. Extração de quantitativos utilizando o BIM: estudo de caso em um projeto de edifício educacional. In: SIMPÓSIO BRASILEIRO DE TECNOLOGIA DA INFORMAÇÃO E COMUNICAÇÃO NA CONSTRUÇÃO, 4., 2023. Anais [...]. Porto Alegre: ANTAC, 2023. p. 1–15. DOI: 10.46421/sbtic.v4i00.2665

GIL, Antônio Carlos. Como Elaborar Projetos de Pesquisa. 4ª edição. São Paulo: Editora Atlas S.A., 2002.

FREITAS, Michelle M. F.; RIBEIRO, Sidnea E. C. Comparative study of compatibility and bill of materials in electrical design between the classic 2d cad method and Building Information Modeling. REMUNOM, v. 13, n. 11, p. 1–27, 2026. DOI: 10.66104/30g2k869.

LUKKA, Kari. The constructive approach. In: Ojala, Lauri; Hilmola, olli-Pekka (ed.). Case study research in logistics. Turku: Publications of the Turku School of Economics and Business Administration, 2003, Series B-1, p. 83-101. ISBN 951-564-102-0. Disponível em: https://www.researchgate.net/publication/247817908.

JAFFARIAN, Richard. Electrical estimating techniques. Florida: Electrical Resources, Inc., 2018, p. 33.

Published

2026-09-13

How to Cite

FREITAS, M. M. F.; RIBEIRO, S. E. C. Building Information Modeling applied to electrical designs: an infrastructure cost analysis. NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, v. 21, n. 1, 13 Sept.2026.

Similar Articles

1-10 of 50

You may also start an advanced similarity search for this article.