Planning the layout of a precast concrete production unit: a case study
DOI:
https://doi.org/10.46421/entac.v21i1.8497Keywords:
Industrial layout, Precast concrete elements, Systematic Layout Planning, Material flowAbstract
This study proposes the layout of a precast concrete production unit in Abelardo Luz (SC), based on the Systematic Layout Planning (SLP) method. Its relevance is linked to the industrialization of construction and the need to reduce waste, optimize flows, and improve productivity. PQRST charts, material flow analysis, and an activity relationship diagram were developed to define space planning units and proximity priorities. Results show that reorganizing critical sectors (such as the batching plant, reinforcement, and molding areas) reduces internal movements, avoids flow crossings, and enhances operational continuity. The longitudinal arrangement of production lines and the integration of production and support areas improve efficiency. The SLP method proved effective, resulting in a layout aligned with operational conditions and technical criteria.
References
[1] LIANG, J. et al. Digital twin-driven intelligent construction: A review. Automation in Construction, v. 157, p. 105151, 2024.
[2] MONTEIRO, M. M.; PALIARI, J. C. Industrialização da construção civil: desafios e oportunidades. Ambiente Construído, Porto Alegre, v. 24, n. 1, p. 1-15, jan./mar. 2024.
[3] CAMPOS, A. L. S.; SILVA, A. P. L. Proposta de layout para uma indústria de produtos domissanitários utilizando o método SLP. Revista Produção Online, Florianópolis, v. 20, n. 3, p. 1007-1030, jul./set. 2020.
[4] ABNT. NBR 9062: Projeto e execução de estruturas de concreto pré-moldado. Rio de Janeiro, 2017.
[5] BRASIL. Ministério do Desenvolvimento Regional. Manual de pré-fabricados de concreto. Brasília, DF, 2024.
[6] TORTORELLA, M. L.; FOGLIATTO, F. S. Gestão da produção e operações. Porto Alegre: Bookman, 2008.
[7] GAITHER, N.; FRAZIER, G. Administração da produção e operações. 8. ed. São Paulo: Cengage Learning, 2008.
[8] ROSA, A. A. et al. Análise e proposição de melhorias no layout de uma empresa de pré-moldados de concreto. Revista Gestão Industrial, Ponta Grossa, v. 10, n. 3, p. 1-15, jul./set. 2014.
[9] SLACK, N.; CHAMBERS, S.; JOHNSTON, R. Administração da produção. 3. ed. São Paulo: Atlas, 2009.
[10] MUTHER, R. Systematic Layout Planning. 2. ed. Boston: Cahners Books, 1973.
[11] JANILCE, et al. Planejamento de layout de uma fábrica de pré-moldados de concreto. Revista de Engenharia e Tecnologia, v. 11, n. 1, p. 1-10, 2019.
[12] MARQUES, A. C.; SALGADO, E. G. Planejamento e controle da produção. 2. ed. Rio de Janeiro: LTC, 2021.
[13] OLIVEIRA, F. L.; FRANCA, S. L. Otimização do layout de uma fábrica de pré-moldados de concreto utilizando o método SLP. Congresso Brasileiro de Engenharia de Produção, v. 32, n. 1, p. 1-12, 2012.
[14] SANTOS, L. M.; GOHR, C. F.; LAITANO, F. C. Aplicação do Systematic Layout Planning (SLP) em uma clínica médica. Revista de Administração e Inovação, São Paulo, v. 9, n. 3, p. 1-15, jul./set. 2012.
[15] MUTHER, R.; WHEELER, J. D. Layout Planning Techniques. Kansas City: Management & Industrial Research Publications, 2000.