Smart View: Gamified Construction Management Simulator
DOI:
https://doi.org/10.46421/entac.v21i1.8650Keywords:
Design Science Research, Computational Artifact, Project Management, Monte Carlo Simulation, Artificial IntelligenceAbstract
Decisions in construction management frequently occur under high uncertainty, which demands tools capable of simulating scenarios and supporting human judgment [1]. Thus, this study presents Smart View, a human-in-the-loop computational system designed to support construction management in uncertain environments. The system integrates stochastic techniques (Monte Carlo simulation), explainable artificial intelligence, and gamification with deterministic methods (EVM, CPM, and S-curve) to overcome the limitations of existing tools. Based on Design Science Research, Smart View was implemented in TypeScript, with a React-based interface and packaged using Electron. The system was tested and evaluated through a construction project case study. The results indicate several benefits: the system enables the simultaneous automation of multiple scenarios, supports probabilistic risk identification and estimation, and fosters a data-driven decision-making process with assistance of explainable AI. It also seeks to enhance team engagement through gamification. The contribution is twofold: theoretical, by proposing an integrated framework; and practical, by providing a functional system with explainable AI and gamification for the construction sector.
References
KWAK, Y. H.; INGALL, L. Exploring Monte Carlo simulation applications for project management. Risk Management, v. 9, n. 1, p. 44-57, 2007.
MICROSOFT. Microsoft Project: project management software. 2023. Disponível em: <https://www.microsoft.com/en-us/microsoft-365/project/project-management-software>. Acesso em: 11 fev. 2026.
ORACLE. Primavera P6 Enterprise Project Portfolio Management. 2022. Disponível em: <https://www.oracle.com/industries/construction-engineering/primavera-p6>. Acesso em: 11 fev. 2026.
FLYVBJERG, B. What you should know about megaprojects and why: an overview. Project Management Journal, v. 45, n. 2, p. 6-19, 2014.
BALLARD, G.; HOWELL, G. Shielding production: essential step in production control. Journal of Construction Engineering and Management, v. 124, n. 1, p. 11-17, 1998.
PROJECT MANAGEMENT INSTITUTE. A guide to the project management body of knowledge (PMBOK Guide). 6. ed. Newtown Square: Project Management Institute, 2017.
FLEMING, Q. W.; KOPPELMAN, J. M. Earned value project management. 4. ed. Newtown Square: Project Management Institute, 2010.
KERZNER, H. Project management: a systems approach to planning, scheduling, and controlling. 12. ed. Hoboken: Wiley, 2017.
FENG, C. W.; LIU, L.; BURNS, S. A. Using genetic algorithms to solve construction time-cost trade-off problems. Journal of Computing in Civil Engineering, v. 11, n. 3, p. 184-189, 1997.
ABIOYE, S. O. et al. A review of LLMs and their applications in the architecture, engineering and construction industry. Artificial Intelligence Review, v. 58, n. 1, 2025.
MA, L. et al. Adopting large language models in the construction industry: drivers, barriers, and strategic implications from China. Buildings, v. 15, n. 23, p. 4296, 2025.
ADADI, A.; BERRADA, M. Peeking inside the black-box: a survey on explainable artificial intelligence (XAI). IEEE Access, v. 6, p. 52138-52160, 2018.
DETERDING, S. et al. From game design elements to gamefulness: defining gamification. In: INTERNATIONAL ACADEMIC MINDTREK CONFERENCE, 15., 2011, Tampere. Proceedings [...]. Tampere: ACM, 2011. p. 9-15.
HAMARI, J.; KOIVISTO, J.; SARSA, H. Does gamification work? A literature review of empirical studies on gamification. In: HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES, 47., 2014, Waikoloa. Proceedings [...]. Waikoloa: IEEE, 2014. p. 3025-3034.
SEABORN, K.; FELS, D. I. Gamification in theory and action: a survey. International Journal of Human-Computer Studies, v. 74, p. 14-31, 2015.
ORACLE. Oracle Primavera Risk Analysis. 2022. Disponível em: <https://www.oracle.com/construction-engineering/primavera-risk-analysis/>. Acesso em: 11 fev. 2026.
HEVNER, A. R. et al. Design science in information systems research. MIS Quarterly, v. 28, n. 1, p. 75-105, 2004.
MARCH, S. T.; SMITH, G. F. Design and natural science research on information technology. Decision Support Systems, v. 15, n. 4, p. 251-266, 1995.
PEFFERS, K. et al. A design science research methodology for information systems research. Journal of Management Information Systems, v. 24, n. 3, p. 45-77, 2007.
TOURAN, A. Probabilistic model for cost contingency. Journal of Construction Engineering and Management, v. 129, n. 3, p. 280-284, 2003.
VENABLE, J.; PRIES-HEJE, J.; BASKERVILLE, R. FEDS: a framework for evaluation in design science research. European Journal of Information Systems, v. 25, n. 1, p. 77-89, 2016.