Artificial Intelligence in the preliminary estimation of civil works costs
a systematic review of methods, variables and gaps.
DOI:
https://doi.org/10.46421/entac.v21i1.8669Keywords:
Artificial Intelligence, Construction Budgeting, Cost Management, Cost Forecasting, Predictive ModelsAbstract
This paper aims to identify the variables and Artificial Intelligence (AI) methods applied to the preliminary cost analysis of construction works, as well as to identify the main limitations associated with their use. The methodology was based on a systematic literature review conducted in the Scopus and Web of Science databases, using the PRISMA protocol to select studies published from 2015 onward. The results indicate the predominance of Artificial Neural Networks, Support Vector Machines, Deep Learning, and ensemble models, mainly applied to physical project variables, economic indicators, time series, and physical-financial performance metrics. It was observed that the choice of the AI model is related to the availability, nature, and quality of the data. As a scientific contribution, the study systematizes the literature by proposing a comparative analysis between predictive methods and types of variables used in cost prediction, while also highlighting limitations and research gaps related to the need for more structured databases, model validation in different contexts, and the development of explainable approaches for preliminary cost estimation.
References
[1] HASHEMI, S. T.; EBADATI, O. M.; KAUR, H. Cost estimation and prediction in construction projects: a systematic review on machine learning techniques. SN Applied Sciences, v. 2, n. 1703, 2020. DOI: https://doi.org/10.1007/s42452-020-03497-1
[2] SADIKOGLU, E.; DEMIRKESEN, S. Mapping the state-of-the-art: bibliometric and systematic analysis of machine learning and AI-based cost and time prediction in construction. Journal of Asian Architecture and Building Engineering, p. 1-28, 2026. DOI: https://doi.org/10.1080/13467581.2026.2641274
[3] WU, Z.; LIU, M.; MA, G.; JIANG, S. A hybrid forecasting model to improve cost prediction accuracy in green building projects with machine learning. Engineering, Construction and Architectural Management, v. 33, n. 4, p. 3375, 2026. DOI: https://doi.org/10.1108/ECAM-09-2024-1247
[4] LIU, Q.; HE, P.; PENG, S.; WANG, T.; MA, J. A survey of data-driven construction materials price forecasting. Buildings, v. 14, n. 10, p. 3156, 2024. DOI: https://doi.org/10.3390/buildings14103156
[5] SADEGHI, N.; NISU, C.; MARJANI, T.; LOTFI, R. Machine learning-enabled construction project management: systematic review and comparative performance. Built Environment Project and Asset Management, p. 1-23 2026. https://doi.org/10.1108/BEPAM-11-2024-0264
[6] GAO, Y.; ANTWI-AFARI, M. F.; HUANG, Y.; CHEN, Z. Artificial intelligence in construction project management: a systematic literature review of cost, time, and safety. Buildings, v. 16, n. 5, p. 1061, 2026. DOI: https://doi.org/10.3390/buildings16051061
[7] REGONA, M.; YIGITCANLAR, T.; XIA, B.; LI, R. Y. M. Opportunities and adoption challenges of AI in the construction industry: a PRISMA review. Journal of Open Innovation: Technology, Market, and Complexity, v. 8, n. 1, p. 45, 2022. DOI: https://doi.org/10.3390/joitmc8010045
[8] SADICK, A.-M.; GURMU, A.; GUNARATHNA, C. Artificial intelligence-based pre-conception stage construction budget decision-making model. Engineering, Construction and Architectural Management, v. 32, n. 7, p. 4552, 2025. DOI: https://doi.org/10.1108/ECAM-11-2023-1108
[9] OTTAVIANI, F. M.; DE MARCO, A.; NARBAEV, T.; BALLESTEROS-PÉREZ, P. Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, p. 99-112, 2025. DOI: https://doi.org/10.1080/15623599.2025.2508293
[10] XIA, X.; XIANG, P.; KHANMOHAMMADI, S.; GAO, T.; ARASHPOUR, M. Predicting safety accident costs in construction projects using ensemble data-driven models. Journal of Construction Engineering and Management, v. 150, n. 4, p. 04024015, v. 150, n. 7, 2024. DOI: https://doi.org/10.1061/JCEMD4.COENG-14567
[11] CHENG, M.-Y.; VU, Q.-T.; DESSALEGN, M.; CHEN, J.-H. Time-dependent rebar price prediction for procurement decision-making using deep learning. Engineering, Construction and Architectural Management, v. 32, n. 12, p. 7938, 2025. DOI: https://doi.org/10.1108/ECAM-03-2024-0324
[12] ALZARA, M.; GIHAD, N.; ABDOU, H.; SOLTAN, A.; HILAL, A.; EHAB, A. Macroeconomic-aware forecasting of construction costs in developing countries: using gated recurrent unit and long short-term memory deep learning framework. PLOS ONE, v. 20, n. 10, p. e0301234, 2025. DOI: https://doi.org/10.1371/journal.pone.0333189
[13] MHADY, A. A.; GURGUN, A. P.; BUDAYAN, C.; KOC, K. New hybrid models integrating the firefly optimization algorithm with the artificial neural networks and adaptive neuro-fuzzy inference systems to improve estimation at completion. Journal of Construction Engineering and Management, v. 151, n.11, 2025. DOI: https://doi.org/10.1061/JCEMD4.COENG-16487