Analysis of BIM Maturity in Federal Highway Infrastructure Concessionaires: Diagnosis of the Sector in Brazil

Authors

  • Caroline Kehl Motiva Rodovias https://orcid.org/0000-0001-9039-5920
  • Carlos Eduardo Capanema Motiva Rodovias
  • Camila Fernanda Gonçalves Motiva Rodovias
  • Sâmara Machado Cabral Melo Motiva Rodovias

DOI:

https://doi.org/10.46421/entac.v21i1.8858

Keywords:

Maturity, Infrastructure, Concessionaires, ANTT, Roads

Abstract

This article presents a diagnosis of BIM modernization in highways regulated by the National Land Transport Agency (ANTT). The research, based on the drivers of BIM adoption for infrastructure by Belay et al. (2021), evaluated 18 transactions using a data collection instrument structured in four fields: Processes, Technologies, Policies, and People. The results indicate an overall maturity average of 1.63 on a scale of 0 to 4, evidencing an initial stage of implementation. It should be noted that transactions with contractual BIM obligations show superior performance (1.89) and that modernization is significantly greater in the design phase compared to the construction and operation phases. The study contributes to the formulation of public policies aimed at the digitalization of transport infrastructure.

Author Biographies

  • Caroline Kehl, Motiva Rodovias

    Doutoranda em Arquitetura, Tecnologia e Cidade pela Universidade Estadual de Campinas

  • Sâmara Machado Cabral Melo, Motiva Rodovias

    Mestre em Arquitetura, Tecnologia e Cidade pela Universidade Estadual de Campinas

References

[1] SOILÁN, M. et al. 3D Point Cloud to BIM: Semi-Automated Framework to Define IFC Alignment Entities from MLS-Acquired LiDAR Data of Highway Roads. Remote Sensing, [s. l.], v. 12, n. 14, 2301, 2020. DOI: https://doi.org/10.3390/rs12142301.

[2] ZHOU, D. et al. Innovative BIM technology application in the construction management of highway. Scientific Reports, [s. l.], v. 14, 2024. DOI: https://doi.org/10.1038/s41598-024-66232-5.

[3] ROY, A.; FIRDAUS, A. Building Information Modelling in Indonesia: Knowledge, Implementation and Barriers. Journal of Construction in Developing Countries, [s. l.], v. 25, n. 2, 2020. DOI: https://doi.org/10.21315/jcdc2020.25.2.8.

[4] BORKOWSKI, A. Evolution of BIM: epistemology, genesis and division into periods. Journal of Information Technology in Construction, [s. l.], v. 28, p. 646-661, 2023. DOI: https://doi.org/10.36680/j.itcon.2023.034.

[5] QIN, X. et al. Using a Tam-Toe Model to Explore Factors of Building Information Modelling (BIM) Adoption in the Construction Industry. Journal of Civil Engineering and Management, [s. l.], v. 26, p. 259-277, 2020. DOI: https://doi.org/10.3846/jcem.2020.12176.

[6] ABNT – ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS. ABNT NBR ISO 19650: Organização da informação acerca de trabalhos da construção. Rio de Janeiro: ABNT, 2025.

[7] PRABHAKARAN, A. et al. An investigation into macro BIM maturity and its impacts: a comparison of Qatar and the United Kingdom. Architectural Engineering and Design Management, [s. l.], v. 17, p. 496-515, 2021. DOI: https://doi.org/10.1080/17452007.2021.1923454.

[8] SUCCAR, B.; KASSEM, M. Macro-BIM adoption: Conceptual structures. Automation in Construction, [s. l.], v. 57, p. 64-79, 2015. DOI: https://doi.org/10.1016/j.autcon.2015.04.018.

[9] SUCCAR, B.; SHER, W.; WILLIAMS, A. Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, [s. l.], v. 8, p. 120-142, 2012. DOI: https://doi.org/10.1080/17452007.2012.659506.

[10] RAZA, M. et al. Potential features of building information modeling (BIM) for application of project management knowledge areas in the construction industry. Heliyon, [s. l.], v. 9, 2023. DOI: https://doi.org/10.1016/j.heliyon.2023.e19697.

[11] YILMAZ, G.; AKCAMETE, A.; DEMIRÖRS, O. A reference model for BIM capability assessments. Automation in Construction, [s. l.], 2019. DOI: https://doi.org/10.1016/j.autcon.2018.10.022.

[12] HOSSEINI, M. et al. BIM adoption within Australian small and medium-sized enterprises (SMEs): an innovation diffusion model. Australasian Journal of Construction Economics and Building, [s. l.], v. 16, n. 3, p. 71-86, 2016. DOI: https://doi.org/10.5130/ajceb.v16i3.5159.

[13] OTHMAN, I. et al. The level of Building Information Modelling (BIM) Implementation in Malaysia. Ain Shams Engineering Journal, [s. l.], 2020. DOI: https://doi.org/10.1016/j.asej.2020.04.007.

[14] SIEBELINK, S. et al. Understanding barriers to BIM implementation: Their impact across organizational levels in relation to BIM maturity. Frontiers of Engineering Management, [s. l.], p. 1-22, 2020. DOI: https://doi.org/10.1007/s42524-019-0088-2.

[15] BELAY, S. et al. Key BIM Adoption Drivers to Improve Performance of Infrastructure Projects in the Ethiopian Construction Sector: A Structural Equation Modeling Approach. Advances in Civil Engineering, [s. l.], v. 2021, 2021. DOI: https://doi.org/10.1155/2021/7473176

Published

2026-09-23

Issue

Section

Tecnologia da Informação e Comunicação

How to Cite

KEHL, C. et al. Analysis of BIM Maturity in Federal Highway Infrastructure Concessionaires: Diagnosis of the Sector in Brazil. NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, v. 21, n. 1, 23 Sept.2026.

Similar Articles

1-10 of 50

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)