Automated physical progress monitoring in construction: systematic review of the literature and patent landscape in BIM-AI integration
DOI:
https://doi.org/10.46421/entac.v21i1.8869Keywords:
Construction progress monitoring, BIM, Computer vision, AI, Patent analysis, Construction 4.0Abstract
AbstractThis paper analyzes the state of the art in automated construction progress monitoring, a field still marked by subjective measurement, limited traceability and fragmentation between site data, BIM and planning. The research adopts Design Science Research (DSR), focusing on problem awareness, and combines a PRISMA 2020-based systematic literature review with patent analysis from 2009 to 2026. Results show convergence between literature and patents in sensor-based capture and as-built versus as-planned comparison, the emergence of foundation models applied to BIM and 3D environments, and a gap in the autonomous integration of the full Production Planning and Control cycle. The contribution of the research lies in the integrated assessment of scientific maturity, protected technical claims, and operational needs for building construction projects.
Keywords: Progress monitoring. BIM. Computer vision. Patent analysis. Construction 4.0.
References
PATEL, T.; GUO, B. H. W. A scientometric review of construction progress monitoring studies. Engineering, Construction and Architectural Management, [s. l.], v. 29, n. 9, p. 3237–3266, out. 2022. DOI: https://doi.org/10.1108/ECAM-10-2020-0799.
CALVETTI, D.; MÊDA, P.; GONÇALVES, M. C.; SOUSA, H. Worker 4.0: the future of sensored construction sites. Buildings, Basel, v. 10, n. 9, art. 169, set. 2020. DOI: https://doi.org/10.3390/buildings10100169.
BAGHALZADEH SHISHEHGARKHANEH, M.; KEIVANI, A.; MOEHLER, R. C.; JELODARI, N.; ROSHDI LALEH, S. Internet of Things (IoT), Building Information Modeling (BIM), and Digital Twin (DT) in Construction Industry: a review, bibliometric, and network analysis. Buildings, Basel, v. 12, n. 10, p. 1503, set. 2022. DOI: https://doi.org/10.3390/buildings12101503.
GOLPARVAR-FARD, M.; PEÑA-MORA, F.; ARBOLEDA, C. A.; LEE, S. Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs. Journal of Computing in Civil Engineering, [s. l.], v. 23, n. 6, p. 391–404, nov. 2009. DOI: https://doi.org/10.1061/(ASCE)0887-3801(2009)23:6(391).
DALIR, A. H.; PEZESHKI, Z.; RAVANSHADNIA, M.; KRINITSKY, E.; SULTANGUZIN, I. A. Automatic monitoring in construction projects: scientometric analysis and visualization of research activities. Human-Centric Intelligent Systems, [s. l.], v. 5, n. 1, p. 21–43, 3 fev. 2025. DOI: https://doi.org/10.1007/s44230-025-00089-3
HSIEH, C.-C.; CHEN, H.-M.; CHEN, W.-Y.; WU, T.-Y. Automated construction progress monitoring and control through AI-based image recognition and BIM integration. Automation in Construction, [s. l.], v. 183, art. 106783, mar. 2026. DOI: https://doi.org/10.1016/j.autcon.2026.106783.
OSADCHA, O.; JURELIONIS, A.; FOKAIDES, P. Geometric parameter updating in digital twin of built assets: a systematic literature review. Journal of Building Engineering, [s. l.], v. 73, art. 106704, 15 ago. 2023. DOI: https://doi.org/10.1016/j.jobe.2023.106704.
WANG, Y.; REZAEI, A.; HICKS, S. Digital twins in the construction industry: a systematic review of current practices and future directions. Journal of Information Technology in Construction, Oslo, v. 31, p. 149–179, 2026. DOI: https://doi.org/10.36680/j.itcon.2026.007.
LIMA, M. G. T.; CUNHA, T. d. M.; CÂNDIDO, L. F.; BARROS NETO, J. d. P. Digital Transformation in the Construction Industry: Lessons and Challenges from the Journey of Brazilian Construction Companies. Sustainability, Basel, v. 18, n. 1, art. 407, 2026. DOI: https://doi.org/10.3390/su18010407.
KOSKELA, L. Application of the new production philosophy to construction. Stanford, CA: CIFE, Stanford University, 1992. (CIFE Technical Report, n. 72).
KOSKELA, L. An exploration towards a production theory and its application to construction. Espoo: VTT Publications, 2000.
BALLARD, H. G. The Last Planner System of Production Control. 2000. Tese (Doutorado em Engenharia Civil) - School of Civil Engineering, The University of Birmingham, Birmingham, 2000.
EASTMAN, C.; TEICHOLZ, P.; SACKS, R.; LISTON, K. BIM Handbook: a guide to building information modeling for owners, managers, designers, engineers and contractors. 2. ed. Nova Iorque: John Wiley & Sons, 2011.
EKANAYAKE, B.; WONG, J. K.-W.; FINI, A. A. F.; SMITH, P. Computer vision-based interior construction progress monitoring: a literature review and future research directions. Automation in Construction, Amsterdam, v. 127, art. 103705, jul. 2021. DOI: https://doi.org/10.1016/j.autcon.2021.103705.
TURKAN, Y.; BOSCHÉ, F.; HAAS, C. T.; HAAS, R. Automated progress tracking using 4D schedule and 3D sensing technologies. Automation in Construction, Amsterdam, v. 22, p. 414–421, mar. 2012. DOI: https://doi.org/10.1016/j.autcon.2011.10.003.
VASSENA, G. P. M.; PERFETTI, L.; COMAI, S.; MASTROLEMBO VENTURA, S.; CIRIBINI, A. L. C. Construction progress monitoring through the integration of 4D BIM and SLAM-based mapping devices. Buildings, Basel, v. 13, n. 10, art. 2488, 2023. DOI: https://doi.org/10.3390/buildings13102488.
PAL, A.; LIN, J. J.; HSIEH, S.-H.; GOLPARVAR-FARD, M. Automated vision-based construction progress monitoring in built environment through digital twin. Developments in the Built Environment, [s. l.], v. 16, art. 100247, 2023. DOI: https://doi.org/10.1016/j.dibe.2023.100247.
BARRERA-ANIMAS, A. Y.; DAVILA DELGADO, J. M. Generating real-world-like labelled synthetic datasets for construction site applications. Automation in Construction, Amsterdam, v. 155, art. 104850, 2023. DOI: https://doi.org/10.1016/j.autcon.2023.104850.
JIN, X.; LIN, X.; YU, X.; GUO, H. Construction progress updating method based on BIM and large language models. Journal of Tsinghua University (Science and Technology), Beijing, v. 65, n. 1, p. 35–44, jan. 2025. DOI: https://doi.org/10.16511/j.cnki.qhdxxb.2025.22.006.
REJA, V. K.; VARGHESE, K.; HA, Q. P. Computer vision-based construction progress monitoring. Automation in Construction, Amsterdam, v. 138, art. 104245, jun. 2022. DOI: https://doi.org/10.1016/j.autcon.2022.104245.
NVIDIA. Cosmos World Foundation Model Platform for Physical AI. arXiv preprint, arXiv:2501.03575, 2025. DOI: https://doi.org/10.48550/arXiv.2501.03575.
PAGE, M. J.; MCKENZIE, J. E.; BOSSUYT, P. M. et al. The PRISMA 2020 statement: an updated guideline for reporting systematic reviews. BMJ, London, v. 372, art. n71, mar. 2021. DOI: https://doi.org/10.1136/bmj.n71.
REHMAN, M. S. U.; SHAFIQ, M. T.; ULLAH, F. Automated computer vision-based construction progress monitoring: a systematic review. Buildings, Basel, v. 12, n. 7, art. 1037, 2022. DOI: https://doi.org/10.3390/buildings12071037.
KOPSIDA, M.; BRILAKIS, I.; VELA, P. A. A review of automated construction progress monitoring and inspection methods. In: Proceedings of the 32nd International Conference of CIB W78. Eindhoven: CIB W78, 2015. p. 421-431. Disponível em: https://itc.scix.net/paper/w78-2015-paper-044. Acesso em: 24 abr. 2026.
ALALOUL, W. S.; QURESHI, A. H.; MUSARAT, M. A.; SAAD, S. Evolution of close-range detection and data acquisition technologies towards automation in construction progress monitoring. Journal of Building Engineering, [s. l.], v. 43, art. 102877, nov. 2021. DOI: https://doi.org/10.1016/j.jobe.2021.102877.
SAMSAMI, R. A systematic review of automated construction inspection and progress monitoring (ACIPM): applications, challenges, and future directions. CivilEng, Basel, v. 5, n. 1, p. 265-287, mar. 2024. DOI: https://doi.org/10.3390/civileng5010014.
AWE, M.; MALHI, A.; BUDKA, M.; MAVENGERE, N.; DAVE, B. Towards 4D BIM: a systematic literature review on challenges, strategies and tools in leveraging AI with BIM. Buildings, Basel, v. 15, n. 7, art. 1072, mar. 2025. DOI: https://doi.org/10.3390/buildings15071072.
PFITZNER, F.; BRAUN, A.; BORRMANN, A. From data to knowledge: construction process analysis through continuous image capturing, object detection, and knowledge graph creation. Automation in Construction, Amsterdam, v. 164, art. 105451, ago. 2024. DOI: https://doi.org/10.1016/j.autcon.2024.105451.
PFITZNER, F.; HU, S.; BRAUN, A.; BORRMANN, A.; FANG, Y. Monitoring concrete pouring progress using knowledge graph-enhanced computer vision. Automation in Construction, Amsterdam, v. 174, art. 106117, jun. 2025. DOI: https://doi.org/10.1016/j.autcon.2025.106117.
WANG, K.; ZHANG, Z.; DENG, R.; MAO, Y. Automated construction progress monitoring and controlling framework based on computer vision and Internet of Things system. In: 2023 6th International Conference on Electronics Technology (ICET). Piscataway: IEEE, 2023. p. 1045-1051. DOI: https://doi.org/10.1109/ICET58434.2023.10211573.
TRIMBLE INC. Self positioning camera system to 3D CAD/BIM model. Inventores: KAHLE, K.; LEE, Y. J. United States Patent n. US10347008B2, concessão em 9 jul. 2019. Disponível em: https://patents.google.com/patent/US10347008B2. Acesso em: 16 abr. 2026.
BUILDOTS LTD. Determining position of an image capture device. Inventores: SUDRY, Y.; DANON, R. J. United States Patent n. US12505575B2. Prioridade: 2 abr. 2020. Status: ativa (Google Patents). Disponível em: https://patents.google.com/patent/US12505575B2. Acesso em: 16 abr. 2026.
RECONSTRUCT INC. Computation of point clouds and joint display of point clouds and building information models with project schedules for monitoring construction progress, productivity, and risk for delays. Inventores: GOLPARVAR-FARD, M.; HOIEM, D.; LIN, J. J.-C.; HAN, K. I.; DEGOL, J. M. United States Patent n. US11288412B2, concessão em 29 mar. 2022. Disponível em: https://patents.google.com/patent/US11288412B2. Acesso em: 16 abr. 2026.
UNIVERZA V MARIBORU. A system, a method and a computer program for construction progress monitoring. Inventores: PUCKO, Z.; REBOLJ, D. Pedido internacional PCT n. EP4437445A1. Prioridade: 25 nov. 2021. Status: pendente (pending, Google Patents). Disponível em: https://patents.google.com/patent/EP4437445A1. Acesso em: 16 abr. 2026.
UNIVERSITY OF FLORIDA RESEARCH FOUNDATION INC. Streamlined single software workflow with ML-based point cloud clustering for virtual reality building inspection. Inventores: RAVI, J. G.; SRINIVASAN, S. Pedido de patente dos Estados Unidos n. US20240203054A1. Prioridade: 20 dez. 2022. Publicação: 20 jun. 2024. Status: pendente (Google Patents). Disponível em: https://patents.google.com/patent/US20240203054A1. Acesso em: 24 abr. 2026.
BOARD OF TRUSTEES OF THE UNIVERSITY OF ILLINOIS. Four-dimensional augmented reality models for interactive visualization and automated construction progress monitoring. Inventores: GOLPARVAR-FARD, M.; PEÑA-MORA, F. A.; SAVARESE, S. United States Patent n. US9070216B2, concessão em 30 jun. 2015. Disponível em: https://patents.google.com/patent/US9070216B2. Acesso em: 16 abr. 2026.
DALUX APS. Method for tracking construction site progress. Inventores: RONG, A. European (patent) application n. EP4550260A1. Prioridade: 3 nov. 2023. Depósito: 31 out. 2024. Publicação: 7 mai. 2025. Status: pendente (Google Patents). Disponível em: https://patents.google.com/patent/EP4550260A1. Acesso em: 16 abr. 2026.
DOXEL INC. Monitoring construction of a structure. Inventores: LADHA, S.; SINGH, R. United States Patent n. US11526744B2, concessão em 13 dez. 2022. Disponível em: https://patents.google.com/patent/US11526744B2. Acesso em: 16 abr. 2026.
DOXEL INC. Generating status of construction site based on hierarchical modeling that standardizes physical relationships of elements of a structure. Inventores: SAHA, A.; MONTAUK, D. V.; TURNER, R. W.; ORBAN, M. P. United States Patent n. US12254429B2, concessão em 18 mar. 2025. Disponível em: https://patents.google.com/patent/US12254429B2. Acesso em: 16 abr. 2026.
DOXEL INC. Tracking an ongoing construction by using fiducial markers. Inventores: TRESKUNOV, A.; SINGH, R. United States Patent n. US11348322B1, concessão em 31 mai. 2022. Disponível em: https://patents.google.com/patent/US11348322B1. Acesso em: 16 abr. 2026.
PROCORE TECHNOLOGIES INC. Verification of progression of construction-related activity at given location. Inventores: SOLTANI, M. M.; PARK, D.; MCKEE, K.; MAN, M. United States Patent n. US12136052B2, concessão em 5 nov. 2024. Disponível em: https://patents.google.com/patent/US12136052B2. Acesso em: 16 abr. 2026.
CHINA CONSTRUCTION FIFTH BUREAU THIRD CONSTRUCTION CO LTD. Construction progress real-time monitoring system based on BIM and Internet of things. Inventores: conforme registo CNIPA (múltiplos; nomes em caracteres chineses na fonte). Patente chinesa n. CN120655245B, concessão em 6 mar. 2026 (pedido publicado como CN120655245A em 16 set. 2025). Disponível em: https://patents.google.com/patent/CN120655245B. Acesso em: 16 abr. 2026.
PROCORE TECHNOLOGIES INC. Construction knowledge graph. Inventores: JAIN, M.; SOTO, A. J.; JILANI, A. S.; GOYAL, R. P. United States Patent n. US12373613B2, concessão em 29 jul. 2025. Disponível em: https://patents.google.com/patent/US12373613B2. Acesso em: 16 abr. 2026.
STECOL SHANDONG ENGINEERING CO LTD. A construction progress management method and system based on BIM. Inventores: conforme registo CNIPA (múltiplos; ver fonte). Patente chinesa n. CN118521161B, concessão em 12 nov. 2024. Disponível em: https://patents.google.com/patent/CN118521161B. Acesso em: 16 abr. 2026.
POLYUP INC. Systems and methods for language-based three-dimensional interactive environment construction and interaction. Inventores: ZARKESH, A. M.; ELAHIAN, K.; KESHMIRIAN, A.; ZAKHARENKOV, A.; ELAHIAN, Z.; VALENCIA, J. United States Patent n. US12229913B2, concessão em 18 fev. 2025 (pedido publicado como US20250029348A1 em 23 jan. 2025). Disponível em: https://patents.google.com/patent/US12229913B2. Acesso em: 16 abr. 2026.
MAINTAINX INC. LLM agent that generates a standardized data model from non standardized data. Inventores: TURLICA, S. C.; DOZOIS-CAOUETTE, H.; MARENGERE-GOSSELIN, M.; RUEL, M.-A.; LACHANCE, M.; GUAY, P.; KURDI-TEYLOUNI, S. Pedido internacional PCT n. WO2025235716A1. Prioridade: 9 mai. 2024. Depósito internacional: 8 mai. 2025. Publicação internacional: 13 nov. 2025. Status: pendente (Google Patents). Disponível em: https://patents.google.com/patent/WO2025235716A1. Acesso em: 16 abr. 2026.