Critical success factors in agile project management

an analysis of architectural design firms

Authors

DOI:

https://doi.org/10.46421/entac.v21i1.8885

Keywords:

Civil construction, Success critical factors, Agile project management, Architecture firms

Abstract

Changes in project requirements are the main contributors to schedule delays and cost overruns in construction. To mitigate this, the civil construction – CC is starting to adopt Agile Project Management - APM. This study aims to identify the critical success factors – CSF of APM in CC, focusing on architecture firms. Thirteen CSFs were identified in the literature: (I) stakeholder collaboration, (II) flexibility in planning, (III) iterative cycles, (IV) following Scrum roles, artifacts, and events, (V) transparent communication, (VI) creation and maintenance of product backlog, (VII) daily meetings, (VIII) cross-functional teams, (IX) constant feedback and improvement, (X) capacity building and training, (XI) motivation and engagement, (XII) use of Building Information Modeling (BIM), and (XIII) visual board. The field research was conducted in three firms to verify the adherence of the literature's CSFs in a local context. Results show that the firms do not formally adopt APM; however, they implement 10 of the 13 CSFs. Only CSFs IV, VII, and X were not identified in the context of Maceió, Alagoa

References

[1] MOHAMMED, K.; KARRI, S. An analytical approach in usage of agile methodologies in construction industries – A case study. Materials Today: Proceedings, v. 33, p. 475–479, 2020.

[2] MORENO, F. et al. Agile project management in the pre-construction stage: facing the challenges of projectification in the construction industry. Buildings, v. 14, n. 11, 3551, 2024.

[3] SERRADOR, P.; PINTO, J. K. Does agile work? A quantitative analysis of agile project success. International Journal of Project Management, v. 33, n. 5, p. 1040–1051, 2015.

[4] EDER, S. et al. Diferenciando as abordagens tradicional e ágil de gerenciamento de projetos. Production, v. 25, n. 3, p. 482-497, 2015.

[5] BECK, K. et al. Manifesto for Agile Software Development, 2001. Disponível em: https://agilemanifesto.org. Acesso em: 12 out. 2025.

[6] STREULE, T. et al. Implementation of Scrum in the Construction Industry. Procedia Engineering, v. 164, p. 269–276, 2016.

[7] ZENDER, Y. O.; DE SOTO, B. G. Use of scrum in the rehabilition of commercial building in Peru. Construction Inovation: Information, Process and Management, v. 21, n. 2, p. 145-163, 2020.

[8] HAMERSKI, D. C. Planejamento e controle de empreendimentos de construção do mercado varejista considerando um ambiente de gestão de múltiplos empreendimentos com base na Lean Production e em Agile Project Management. 2019. Dissertação (Mestrado em Engenharia Civil) – Universidade Federal do Rio Grande do Sul, Porto Alegre, 2019.

[9] EMMITT, S. Design Management for Architects. 2. ed. Chichester: Blackwell Publishing Ltd, 2014. 304 p.

[10] OLIVIERI, H.; GRANJA, A. D.; PICCHI, F. A. Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado. Ambiente Construído, v. 16, n. 1, p. 265-283, 2016.

[11] CONFORTO, E, C.; AMARAL, D. C. Evaluating an agile method for planning and controlling innovative projects. Project Management Journal, v. 41, n. 2, p. 73-80, 2010.

[12] SCHWABER, K.; SUTHERLAND, J. Guia do Scrum: o guia definitivo para o Scrum – as regras do jogo. [S.l.]: [s.n.], nov. 2020. Disponível em: https://scrumguides.org/docs/scrumguide/v2020/2020-Scrum-Guide-PortugueseBR-3.0.pdf. Acesso em: 19 out. 2025.

[13] SCHWABER, K. BEEDLE, M. Agile software development with Scrum. London: Pearson Education International, 2002. 158 p.

[14] SHAFIQ, S.; MINHAS, N. M. Integrating formal methods in XP – A conceptual solution. Journal of Software Engineering and Applications, v. 7, n. 4, 2014.

[15] ABREU, J. P. M. de et al. Multiskilled labor force: a discussion of this missing link of lean construction in Brazilian companies. Ambiente Construído, v. 23, n. 4, p. 7-23, 2023.

[16] BOTELHO, L. L. R.; CUNHA, C. C. de A.; MACEDO, M. O método da revisão integrativa nos estudos organizacionais. Gestão e Sociedade, v. 5, n. 11, p. 121-136, 2011.

[17] EDER, S. et al. Estudo exploratório do conceito de agilidade: modelo teórico para aplicação no gerenciamento ágil de projetos. In: XVIII Simpósio de Engenharia de Produção, 2010, Bauru. Anais.. Bauru: Escola de Engenharia de São Carlos, Universidade de São Paulo, 2010.

[18] AREFAZAR Y. et al. Prioritizing agile project management strategies as a change management tool in construction projects. International Journal of Construction Management, v. 22, n. 4, p. 678–689, 2019.

[19] CHATHURANGA, S. et al. Practices driving the adoption of agile project management methodologies in the design stage of building construction projects. Buildings, v. 13, 1079. 2023.

[20] AHMED, M.; MOHAMMED, S. Developing a risk management framework in construction project based on agile management approach. Civil Engineering Journal, v. 5, n. 3, 2019.

[21] SAARI J.; MÄNNISTÖ, A.; KÄHKONEN, K. Indicators of collaborative design management in construction projects. Journal of Engineering, Design and Technology, v. 16, n. 4, p. 674-691, 2018.

[22] LUCAS, F.F. de. O framework scrum em um escritório de arquitetura: um estudo de caso. 2018. Monografia (Especialização em Gerenciamento de Obras). Universidade Tecnológica Federal do Paraná, Curitiba, 2018.

[23] NUNES, R. G. Gestão ágil e BIM: análise dos impactos da implementação do BIM em uma empresa de projetos estruturais sob a perspectiva de métricas ágeis. 2023. Trabalho de Conclusão de Curso (Engenharia de Produção Civil). Universidade Federal de Santa Catarina, Florianópolis, 2023.

[24] ZAYAT, W.; SENVAR, O. Framework study for agile software development via Scrum and Kanban. International Journal of Innovation and Technology Management, v. 17, n. 4, 2020.

[25] CHAI, C. et al. BIM integration in agile scrum during the design phase. Journal of Engineering Science and Technology, v. 18, n. 4, p. 302-316, 2023.

Published

2026-10-08

How to Cite

BUARQUE, A. M. B.; PHILIPPSEN JR , L.; HAMERSKI, D. Critical success factors in agile project management: an analysis of architectural design firms. NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, v. 21, n. 1, 8 Oct.2026.

Similar Articles

1-10 of 50

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)