Is inspection sufficient? An analysis of the limitations of verification practices in modular construction

Authors

DOI:

https://doi.org/10.46421/entac.v21i1.8979

Keywords:

Quality, Built-in Quality, Nonconformance, Modular Construction

Abstract

Modular construction offers superior quality, greater predictability of project completion time, and lower resource waste when compared with traditional construction methods. However, quality management practices still rely on quality information management oriented toward the completion of forms, which tends to be inefficient. Therefore, the objective of this paper is to analyze the limitations of existing inspection practices in a modular construction company and to propose the improvements required to achieve a Built-in Quality system that supports the integration of quality throughout all stages of production, from factory assembly to on-site project completion. To this end, a comparative case study was conducted between the company's manufacturing facility and a construction site to evaluate module inspection practices. The results indicate potential inconsistencies in the quality assessment process, highlighting a significant opportunity for the implementation of Built-in Quality. This study provides a theoretical contribution by demonstrating the verification practices and tools required to effectively embed quality into modular construction processes.

Author Biographies

  • Mozzara Oliveira da Fonseca, Federal University of Rio Grande do Sul

    Mestra em Engenharia Civil pela Universidade Federal de Santa Catarina. Doutoranda em Engenharia Civil: Construção e Infraestrutura pela Universidade Federal do Rio Grande do Sul (Porto Alegre - RS, Brasil).

  • Iamara Rossi Bulhões, Federal University of Rio Grande do Sul

    Doutora em Engenharia Civil pela Universidade Estadual de Campinas. Professora na Universidade Federal do Rio Grande do Sul (Porto Alegre - RS, Brasil).

  • Carlos Torres Formoso, Federal University of Rio Grande do Sul

    Ph.D. in Civil Engineering from the University of Salford. Professor na Universidade Federal do Rio Grande do Sul (Porto Alegre - RS, Brasil).

  • Aline Zini, Federal University of Rio Grande do Sul

    Mestra em Engenharia Civil: Construção e Infraestrutura pela Universidade Federal do Rio Grande do Sul (Porto Alegre - RS, Brasil).

References

JURAN, J. M.; GODFREY, A. Blanton. Juran’s quality handbook. 5. ed. United States of America: McGraw-Hill Professional, 1999.

MA, Z. et al. Construction quality management based on a collaborative system using BIM and indoor positioning. Automation in Construction, v. 92, p. 35-45, 2018.

SHIN, J.; CHOI, B. Design and Implementation of Quality Information Management System for Modular Construction Factory. Buildings, v. 12, n. 5, 2022.

DEMING, W.E. Quality, Productivity and Competitive Position. MIT, Cambridge, MA, UK, 1982.

CROSBY, P.B. Quality is Free: The Art of Making Quality Certain. McGraw-Hill (NY), New York, 1979.

PALADINI, E. P. Gestão da Qualidade no Processo: a qualidade na produção de bens e serviços. São Paulo: Atlas, 1995.

DING, L. et al. IFC-inspection process model for infrastructure projects: Enabling real-time quality monitoring and control. Automation in Construction, v. 84, p. 96-110, 2017.

BALLARD, G.; TOMMELEIN, I. Built in Quality Cycle. Project Production Systems Laboratory (P2SL), White paper, n. 1, 2014.

GOMEZ, S. et al. Changing behaviors upstream to achieve expected outcomes. In: Proc. 27th Ann. Conf. Int. Group for Lean Constr. 2019. p. 13-24.

GOMEZ, S. et al. Features of a Behavior-Based Quality System (BBQS). In: Proc. 28th Ann. Conf. Int. Group for Lean Const. 2023. p. 399-411.

SHINGO, S. Study of the Toyota Production System from an Industrial Engineering Viewpoint, Cambridge: Productivity Press, 1989.

KOSKELA, L. Application of the new philosophy to construction. CIFE-Center for Integrated Facility Engineering. Technical Report, 75p. Stanford University, Palo Alto, California, 1992.

LOVE, P. E. D.; SMITH, J.; TEO, P. Putting into practice error management theory: Unlearning and learning to manage action errors in construction. Applied Ergonomics, v. 69, p. 104-111, 2018.

LOVE, P. E. D. et al. Making sense of rework and its unintended consequence in projects: The emergence of uncomfortable knowledge. International Journal of Project Management, v. 37, p. 501-516, 2019.

LOVE, P. E. D. et al. Building absorptive capacity in a mega-project program alliance: Learning to mitigate rework. Developments in the built environment, v. 18, p. 100402, 2024.

SHENG, D. et al. Construction quality information management with blockchains. Automation in Construction, v. 120, 2020.

BATAGLIN, F. S. et al. Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM. Canadian journal of civil engineering, v. 47, n. 2, p. 165-177, 2020.

METVAEI, S. et al. Developing a BIM-enabled robotic manufacturing framework to facilitate mass customization of prefabricated buildings. Computers in Industry, v. 164, p. 104201, 2025.

LIU, H.; DUAN, Y. Production and construction quality management system of prefabricated buildings based on BIM technology. International Journal of Industrial and Systems Engineering, v. 43, n. 1, p. 103-114, 2023.

YIN, R. K. Case Study Research and Applications: Design and Methods. 6. ed. Thousand Oaks: SAGE Publications, 2018.

Published

2026-09-23

How to Cite

FONSECA, M. O. DA et al. Is inspection sufficient? An analysis of the limitations of verification practices in modular construction. NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, v. 21, n. 1, 23 Sept.2026.

Similar Articles

1-10 of 50

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)

1-10 of 13