PROPOSTA DE MÉTODO PARA MONITORAMENTO VISUAL SISTEMÁTICO DO PROGRESSO DE OBRAS BASEADO EM MAPEAMENTOS 3D POR VANT E BIM 4D

Autores

  • Juliana álvares
  • Dayana Costa
  • Amanda Barbosa

DOI:

https://doi.org/10.46421/entac.v17i1.1736

Palavras-chave:

Construction progress monitoring, 3D mapping, Unmanned Aerial Vehicle (UAV), Building Information Modeling (BIM), BIM 4D

Resumo

The activities of construction progress monitoring and controlling are important for an efficient construction management as planned. Even as studies propose the use of visual data technologies to improve these activities, few of them directly address the systematic integration of those tools for progress monitoring with construction management systems. The present study proposes a method for a systematic visual progress monitoring of construction, supported by construction sites 3D mappings using Unmanned Aerial Vehicle and Building Information Modeling (BIM), integrating with production planning and control process. The research method, which uses Design Science Research, consists of five steps. However, the focus of this paper is the artifact proposal development step, developed from an exploratory study in a construction project, which includes a diagnosis of the adopted production planning and control system, and tests of tools and practical processes associated with the proposed method. As the main contribution, the proposed method presents an integrated management system on three steps, respectively associated to long-term, look-ahead and short-term planning: (1) Project as-planned BIM models development; (2) Systematic monitoring of construction progress based on visual comparison of as-planned and as-built construction status; (3) Visual record of the construction site status and short-term activities monitoring.

Referências

DEL PICO, W. J. Project Control: Integrating Cost and Schedule in Construction.

Hoboken: John Wiley & Sons, Inc., 2013.

HAN, K. K.; GOLPARVAR-FARD, M. Potential of big visual data and buildinginformation modeling for construction performance analytics: An exploratory study.

Automation in Construction, v. 73, p. 184-198, 2017.

HAN, K.; DEGOL, J.; GOLPARVAR-FARD, M. Geometry- and Appearance-BasedReasoning of Construction Progress Monitoring. Journal of Construction Engineeringand Management, v. 144, 2018.

LIN, J. J.; GOLPARVAR-FARD, M. Proactive Construction Project Controls via PredictiveVisual Data Analytics. In: ASCE INTERNATIONAL WORKSHOP ON COMPUTING IN CIVILENGINEERING, 2017, Seattle. Seattle: ASCE, 2017. p. 147-154.

MARTÍNEZ-ROJAS, M.; MARÍN, N.; VILA, M. A. The role of information technologies toaddress data handling in construction project management. Journal of Computingin Civil Engineering, v. 30, 2016.

TEIZER, J. Status quo and open challenges in vision-based sensing and tracking oftemporary resources on infrastructure construction sites. Advanced EngineeringInformatics, v. 29, p. 225-238, 2015.

TEZEL, A.; AZIZ, Z. From Conventional to IT Based Visual Management: A ConceptualDiscussion for Lean Construction. Journal of Information Technology in Construction(ITcon), v. 22, p. 220-246, 2017.

TUTTAS, S.; BRAUN, A.; BORRMANN, A.; STILLA, U. Acquisition and ConsecutiveRegistration of Photogrammetric Point Clouds for Construction Progress MonitoringUsing a 4D BIM. Photogrammetrie, Fernerkundung, Geoinformation, v. 85, p. 3-15,2017.

YANG, J.; PARK, M.-W.; VELA, P. A.; GOLPARVAR-FARD, M. Construction performancemonitoring via still images, time-lapse photos, and video streams: Now, tomorrow,and the future. Advanced Engineering Informatics, v. 29, p. 211-224, 2015.

Downloads

Publicado

2018-11-12

Como Citar

ÁLVARES, Juliana; COSTA, Dayana; BARBOSA, Amanda. PROPOSTA DE MÉTODO PARA MONITORAMENTO VISUAL SISTEMÁTICO DO PROGRESSO DE OBRAS BASEADO EM MAPEAMENTOS 3D POR VANT E BIM 4D. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 3151–3160. DOI: 10.46421/entac.v17i1.1736. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1736. Acesso em: 23 dez. 2024.

Edição

Seção

(Inativa) Tecnologia da Informação e Comunicação

Artigos Semelhantes

1 2 3 4 5 6 7 8 9 10 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.