IMPORTÂNCIA DE MODELOS DE CONTRATAÇÃO DE PROJETOS CORPORATIVOS: ESTUDOS DE CASO

Authors

  • Mariana Julião
  • Silvio Melhado

DOI:

https://doi.org/10.46421/entac.v17i1.1488

Keywords:

Scope of work, Corporate project process, Contract criteria

Abstract

Corporation's business strategies changes impact on visual communication and layout configuration to receive clients and attain talents. Architecture firms need to capture and  translate the client's needs into desigb criteria and input their limits to balance client's expectation when signing a contract. This contract must have a commercial purpose, but also be used as a guide to the architecture firm to pre-design and design development, concerning  deadlines, coast control, final product quality and client's satisfaction all long the project process. In many corporate project processes, architects find difficulty in attending client's needs and expectations. Reworks and scope of work changes during design phases turn out to be the most common adversities concerning the design process, overcoming gaps between project design phases and civil work execution, making professionals lose productivity and projects to be more expensive. This paper objective is to check project delivery methods in order to avoid rework, schedule delays and unforeseen costs and, therefore, uses as methodology theme related literature and case studies analysis through interview. After interview and case' scope of work analysis, the result of this research was that lack of information from client drive to scope changes and reworks.

References

FINCH, E. Facilities Change Management. Blackwell Publishing Ltd. Oxford, 2012.

LEITE, K. P.; BARROS NETO, J. P. Avaliação do Processo de Projetos emEmpreendimentos Imobiliários. XV Encontro Nacional de Tecnologia do AmbienteConstruído. ENTAC. Maceió, 2014. p. 2071 2080.

LINS, D.; CAMPOS, I.; MORORÓ, M.; BARROS NETO, J. P.; CARDOSO, D.

Caracterização e análise dos métodos de entrega de projeto. XV Encontro Nacionalde Tecnologia do Ambiente Construído. ENTAC. Maceió, 2014. p. 1428 1437.

SILVA, T.; MELHADO, S. B. Gestão de Riscos e Riscos de Gestão em ProjetosIndustriais: Estudos de Caso. In: XVI Encontro Nacional de Tecnologia do AmbienteConstruído. Anais... São Paulo: ENTAC, 2016. P. 3348-3359.

SMITH, J.; LOVE, P. Project Inception: Facilities Change Management in Practice. In.

Finch, Edward. Facilities Change Management (edited by Edward Finch). BlackwellPublishing Ltd. Oxford, 2012.

Published

2018-11-12

How to Cite

JULIÃO, Mariana; MELHADO, Silvio. IMPORTÂNCIA DE MODELOS DE CONTRATAÇÃO DE PROJETOS CORPORATIVOS: ESTUDOS DE CASO. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1435–1441. DOI: 10.46421/entac.v17i1.1488. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1488. Acesso em: 23 nov. 2024.

Issue

Section

(Inativa) Gestão e Economia da Construção

Most read articles by the same author(s)

Similar Articles

<< < 49 50 51 52 53 54 55 56 57 58 > >> 

You may also start an advanced similarity search for this article.