Cost deviation in small works

Authors

DOI:

https://doi.org/10.46421/entac.v19i1.1993

Keywords:

Construction management, Budget, Project Control

Abstract

This paper aims to analysis the perception of construction managers about the main causes of cost deviation in small works. For doing so, a survey was carried out with 158 professionals from construction industry around different states of Brazil. Through exploratory factor analysis, two sampling, one containing only small works, were compared. This provided insights about cost deviation of small works which the final model was composed by 22 variables distributed in four factors: site management, economic environment, design and labourhand.

Author Biography

Luis Felipe Cândido, Núcleo de Inovação na Construção (NiC) Universidade Federal do Ceará

Eng.Civil e Mestre em Eng. Civil pela UFC. Atualmente é professor assistente da UFC Campus Crateús desempenhando a função de vice coordenador do curso de Engenharia Civil. É, também, pesquisador e coordenador no GERCON (Grupo de Pesquisa e Assessoria em Gerenciamento na Construção Civil da UFC). Pesquisa na área de gerenciamento de empresas e empreendimentos, com foco nos tópicos de medição de desempenho, gerenciamento de projetos, construção enxuta e sustentabilidade, com artigos publicados em eventos e periódicos nacionais e internacionais. Possui experiência profissional em gerenciamento de obras e docência do ensino superior, tendo atuado como como consultor em projetos diversos. (Texto informado pelo autor)

References

MUIANGA, E. A. D.; GRANJA, A. D.; RUIZ, J. de A. Desvios de custos e prazos em empreendimentos da construção civil: categorização e fatores de influência. Ambiente Construído, v. 15, n. 1, p. 79–97, 2015.

MANSUR, S. A.; ZIN, R. M.; LINBO, L. Components of Cost Overrun in China Construction Projects. IOP Conference Series: Materials Science and Engineering, v. 620, n. 1, 2019. Disponível em: < https://inis.iaea.org/search/search.aspx?orig_q=RN:52117980>. Acesso em: 19 fev. 2022..

ZAHMAK, A.; GHANNAM, O.; NOFAL, O. Comparative study between contractors’ and consultants’ evaluation of Cost Overrun factors in building construction projects in UAE. Advances in Science and Engineering Technology International Conferences, p. 8–13, 2011. Disponível em: < https://ieeexplore.ieee.org/abstract/document/9118313>. Acesso em: 19 fev. 2022.

CANTARELLI, C. C. et al. Different cost performance: different determinants? The case of cost overruns in Dutch transport infrastructure projects. Transport Policy, v. 22, p. 88–95, 1 jul. 2012.

SANTOS, H. de P.; STARLING, C. M. D.; ANDERY, P. R. P. Um estudo sobre as causas de aumentos de custos e de prazos em obras de edificações públicas municipais. Ambiente Construído, v. 15, n. 4, p. 225–242, 2015.

FRANÇA, A.; HADDAD, A. Causes of construction projects cost overrun in Brazil. International Journal of Sustainable Construction Engineering and Technology, v. 9, n. 1, p. 69–83, 2018.

AGOPYAN, V.; JOHN, V. M.; GOLDEMBERG, J. O Desafio da Sustentabilidade na Construção Civil. 1 ed. São Paulo: Blucher, 2011.

FREITAS, J. Sustentabilidade na Gestão de Custos. Boletim do Gerenciamento, [S.l.], v. 15, n. 15, p. 43–49, 2020. Disponível em: <https://nppg.org.br/revistas/boletimdogerenciamento/article/view/393>. Acesso em: 19 fev. 2022.

KALIBA, C.; MUYA, M.; MUMBA, K. Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, v. 27, n. 5, p. 522–531, 2009.

ZAHMAK, A.; GHANNAM, O.; NOFAL, O. Comparative study between contractors’ and consultants’ evaluation of Cost Overrun factors in building construction projects in UAE. Advances in Science and Engineering Technology International Conferences, p. 8–13, 2011. Disponível em: < https://ieeexplore.ieee.org/abstract/document/9118313>. Acesso em: 19 fev. 2022.

DOLOI, H. Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects. Journal of Construction Engineering and Management, v. 139, n. 3, p. 267–279, 2013.

DURDYEV, S.; ISMAIL, S.; BAKAR, N. A. Factors causing cost overruns in construction of residential projects; Case study of Turkey. Asian Journal of Management Research, v. 1, p. 3–12, 2013.

ABUSAFIYA, H. A. M.; SULIMAN, S. M. A. Causes and Effects of Cost Overrun on Construction Project in Bahrain: Part I (Ranking of Cost Overrun Factors and Risk Mapping). Modern Applied Science, v. 11, n. 7, p. 20-28, 2017.

JOHNSON, R. M.; BABU, R. I. I. Time and cost overruns in the UAE construction industry: a critical analysis. International Journal of Construction Management, v. 20, n. 5, p. 402–411, 2018.

ANDRIĆ, J. M. et al. The cost performance and causes of overruns in infrastructure development projects in Asia. Journal of Civil Engineering and Management, v. 25, n. 3, p. 203–214, 2019.

VERGARA, S. C. Projetos e relatórios de pesquisa em administração. 3. ed. Rio de Janeiro: Atlas, 2000.

HAIR JR., J.F.; WILLIAM, B.; BABIN, B.; ANDERSON, R.E. Análise multivariada de dados. 6.ed. Porto Alegre: Bookman, 2009.

GÓMEZ-CABRERA, A. et al. Factors generating schedule delays and cost overruns in construction projects. In: Simpósio Brasileiro de Gestão e Economia da Construção, 11., 2019, Anais [...]. Porto Alegre: ANTAC, 2019. p. 1–10.

NYONI, T. Cost overrun factors in construction industry: a case of Zimbabwe. Munich Personal RePEc Archive Paper, n. 96788, p. 1–13, 2019. Disponível em: <https://mpra.ub.uni-muenchen.de/96788/>. Acesso em: 19 fev. 2022.

SEDDEEQ, A. B. et al. Time and cost overrun in the Saudi Arabian oil and gas construction industry. Buildings, v. 9, n. 2, p. 1–17, 2019.

SHARMA, S.; GOYAL, P. K. Fuzzy assessment of the risk factors causing cost overrun in construction industry. Evolutionary Intelligence, v. 0, n. 0, p. 0, 2019. Disponível em: <http://dx.doi.org/10.1007/s12065-019-00214-9>. Acesso em: 19 fev. 2022.

AMRI, T. Al; MAREY-PÉREZ, M. Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman. Journal of Project Management, v. 5, p. 87–102, 2020.

ALVARENGA, F. C. et al. Alterações de custo e prazo em obras públicas. Ambiente Construído, v. 21, n. 1, p. 161–180, 2021.

REIS, C. J. L. et al. Identificação das causas de atrasos de obras: um estudo de caso na região metropolitana de Belém. In: Encontro Nacional de Tecnologia do Ambiente Construído, 16., 2016, Anais [...]. São Paulo.

MALHOTRA, N. K. Pesquisa de marketing: foco na decisão. 3. ed. São Paulo: Pearson Prentice Hall, 2011.

HONGYU, K. Análise Fatorial Exploratória: resumo teórico, aplicação e interpretação. ES Engineering and Science, [S. l.], v. 7, n. 4, p. 88-103, 2018.

DAMÁSIO, B. F. Uso da análise fatorial exploratória em psicologia. Avaliação Psicológica, v.11, n.2, p. 213-228, 2012.

PALIKHE S.; KIM S.; KIM J. J. Critical success factors and dynamic modeling of construction labour productivity. International Journal of Civil Engineering, p. 1–16, 2018.

BOERIZ, T. A.; GONÇALES FILHO, M. Gestão da qualidade na prevenção dos desperdícios em canteiro de obras da construção civil. Brazilian Journal of Production Engineering, p. 71–84, 2021.

CARVALHO, B. et al. Study on the factors of delay in construction works. Ambiente Construído. v. 21, n. 3, p. 27–46, 2021.

ALMEIDA, E. L. G. et al. Study of delays in constructions: A managerial point of view of private companies in Brasilia, Brazil. Gestão e Produção, v. 28, n. 3, 2021.

Published

2022-11-07

How to Cite

SALDANHA, Raynara Cavalcante; OLIVEIRA, Francisco Micael Machado; CÂNDIDO, Luis Felipe; BARROS NETO, José de Paula. Cost deviation in small works. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 19., 2022. Anais [...]. Porto Alegre: ANTAC, 2022. p. 1–11. DOI: 10.46421/entac.v19i1.1993. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1993. Acesso em: 23 nov. 2024.

Issue

Section

(Inativa) Gestão e Economia da Construção

Most read articles by the same author(s)

1 2 3 > >> 

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.