EFFECT OF SOLUBLE PHOSPHORUS AND FLUORINE COMPOUNDS FROM PHOSPHOGYPSUM ON THE HYDRATION OF MAJOR MINERAL PHASES IN PORTLAND CLINKER: PURE C3S AND C3A.
Keywords:
Cement, phosphogypsum, hydration, phosphorus, fluorineAbstract
Phosphogypsum (PG), a byproduct of phosphate fertilizer industry, is a sustainable alternative to natural gypsum (NG) as a calcium sulfate source in Portland cement. However, PG introduces soluble phosphorus (P₂O₅) and fluoride (F⁻), which retard hydration, prolong setting times, and reduce early strength. This thesis examines the hydration kinetics and product formation of clinker phases—tricalcium silicate (C₃S), tricalcium aluminate (C₃A), and their binary system (C₃S + C₃A). Analytical-grade gypsum with varying P₂O₅ and F⁻ concentrations (0–1.0%) simulates PG's effects. Isothermal calorimetry, XRD, TGA, and Raman spectroscopy were used to analyze hydration behavior. For C₃S hydration, P₂O₅ extended the induction period from 1.76 to 3.33 hours, F⁻ from 2.25 to 4.02 hours, and their combination up to 13.06 hours, with delayed portlandite formation confirmed by TGA and XRD. In C₃A systems, PG substitution delayed hydration peaks. While P₂O₅ minimally affected peak timing, it reduced heat release, whereas F⁻ significantly delayed hydration, especially when combined with P₂O₅. In the binary system, P₂O₅ caused the greatest delay at 1.7%, with F⁻ contributing during induction and acceleration. Combined, they prolonged sulfate depletion and delayed aluminate hydration.