Controle da programação de um empreendimento: estudo de caso

Autores/as

  • Natália Castro de Oliveira Universidad Federal de Santa Catarina image/svg+xml
  • Cristine do Nascimento Mutti Universidad Federal de Santa Catarina image/svg+xml

DOI:

https://doi.org/10.46421/sibragec.v11i00.10

Palabras clave:

Construção civil, Planejamento, Controle da programação

Resumen

In the current scenario of crisis in the country, construction companies need to invest in management and in process control. The PPC is one of the most complex processes in companies. This is due to the large number of variables that influence the system and the interdependence between them and external factors. This research was a case study conducted during the execution of a residential building, which had its planning in development and being applied daily. In order to carry out the control in the building site the PPC tool was applied weekly, with daily control. The main problems identified were: unfinished prior task, low productivity, lack of sub contractor´s labor, lack of labor and lack of building materials. Refining the PPC can identify more easily those responsible for delays and take corrective action on site.

Descargas

Los datos de descarga aún no están disponibles.

Publicado

2021-03-18

Cómo citar

OLIVEIRA, N. C. DE; MUTTI, C. DO N. Controle da programação de um empreendimento: estudo de caso. SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, v. 11, n. 00, p. 1–7, 18 mar.2021.