Aplicação do kit completo para minimizar a interrupção do fluxo de trabalho: making-do e trabalho inacabado

Autores

  • Klisman Mateus de Andrade Soares Universidade Federal de Sergipe image/svg+xml
  • Maria Gabriela de Almeida Pinto Universidade Federal de Sergipe image/svg+xml
  • Tauane Barbosa Dos Santos Universidade Federal de Sergipe image/svg+xml
  • Débora De Gois Santos Universidade Federal de Sergipe, UFS
  • Denise Conceição De Gois Santos Michelan Universidade Federal de Sergipe image/svg+xml
  • Paulo Ricardo Ramos Santos Universidade Federal de Sergipe image/svg+xml

DOI:

https://doi.org/10.46421/sibragec.v11i00.11

Palavras-chave:

Lean construction, Complete Kit, Best practices, Making-do, Unfinished Work

Resumo

The current scenario of the construction sector has several peculiarities regarding the standardization and development of processes. These unusual features are not always favorable and resulting in rework and improvisations in the construction site, which leads to disruption of the process. One solution is to provide the complete kit, to avoid waste by making-do and work in progress. The aim is to identify which categories of best practice are most valued by engineers, in search of continuity of the work, by applying the complete kit. The method includes the elaboration of a framework of managerial actions; information about the importance of the adoption of best practices, through the application of questionnaires based in the theoretical framework. As a result, managers attributed "great importance" to the managerial actions of the categories: worker protection, work conference, process protection, and access. It is concluded that the managers concentrate on the work at the production site, rather than actions for work preparation, project and schedule.

Downloads

Os dados de download ainda não estão disponíveis.

Downloads

Publicado

2021-03-18

Como Citar

SOARES, K. M. DE A. et al. Aplicação do kit completo para minimizar a interrupção do fluxo de trabalho: making-do e trabalho inacabado. SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, v. 11, n. 00, p. 1–7, 18 mar.2021.

Artigos Semelhantes

1-10 de 50

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.

Artigos mais lidos pelo mesmo(s) autor(es)

1-10 de 22