Integrating BIM - Lean Construction into the Physical Layout of Construction Sites
Reducing Waste and Improving Material Flow in Vertical Construction
DOI:
https://doi.org/10.46421/entac.v21i1.8659Keywords:
Integração BIM, Lean Construction, Canteiro de obra, Agile methods in civil construction, PlanejamentoAbstract
This study aims to analyze the integration of BIM and Lean Construction in the physical layout of a high-end vertical construction project, focusing on waste reduction and improved material flow within the built environment. The methodology adopted is based on an applied approach, with three-dimensional modeling developed in Autodesk Revit, associated with scenario analysis and logistical and spatial performance indicators. From the digital model, it became possible to simulate different layout configurations, extract quantities, and evaluate optimization parameters. The results showed a reduction in movement, improved spatial organization, and greater efficiency in logistical flows, aligning with the lean principles of rationalization and waste elimination. Thus, as a contribution, the study concludes that the integration of BIM and Lean construction constitutes an effective strategy in the context of the digital transformation of the built environment, enabling data-driven planning, greater predictability, and qualified support for decision-making on the construction site.
Keywords: BIM integration. Lean Construction. Construction site. Planning