Change order analysis using construction document data through Business Intelligence

A case study

Authors

DOI:

https://doi.org/10.46421/entac.v21i1.8850

Keywords:

Intervention projects, Rework, Change orders, Business Intelligence, ETL

Abstract

This study aims to analyze the impact of contractual change orders on the performance of intervention projects, considering the effects of additional services and rework on schedule and cost. The methodology consists of a case study conducted in a commercial project based on the analysis of 27 weekly reports. Data were structured through an ETL process and analyzed using Business Intelligence tools, particularly Power BI, enabling the integration of schedule and actual cost data. The results showed a delay of 43 working days and a cost increase of 31.54%. A significant portion of additional services was associated with rework, especially in painting and drywall systems. As a contribution, the study demonstrates the potential of using structured operational data to generate analytical information, supporting the understanding of project performance and decision-making.

Author Biographies

  • Gustavo Oliveira Siqueira, Federal University of Uberlândia

    Engenheiro Civil pela Universidade de Uberlândia (Uberlândia - MG, Brasil)

  • Renner de Assis Garcia Sobrinho, Federal University of Uberlândia

    Doutorado em Engenharia Mecânica pela Universidade Federal de Uberlândia. Professor na
    Faculdade de Engenharia Civil na Universidade Federal de Uberlândia (Uberlândia - MG, Brasil)

  • Érik Buiati Andrade, Federal University of Uberlândia

    Graduando em Engenharia Civil pela Universidade de Uberlândia (Uberlândia - MG, Brasil)

References

MATTOS, Aldo Dórea. Planejamento e controle de obras. São Paulo: Oficina de Textos, 2019.

BERNARDES, Maurício Moreira e Silva. Planejamento e controle da produção para empresas de construção civil. Rio de Janeiro: LTC, 2003.

SAMBASIVAN, Murali; SOON, Yau Wen. Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 2007.

CARVALHO, A. B. et al. Study on the factors of delay in construction works. Ambiente Construído, 2021. DOI: 10.1590/s1678-86212021000300536.

KOSKELA, Lauri. Application of the new production philosophy to construction. Stanford: CIFE, 1992.

LOVE, P. E. D.; EDWARDS, D. J. Determinants of rework in building construction projects. Engineering, Construction and Architectural Management, 2004. DOI: 10.1108/09699980410547612.

FLYVBJERG, Bent; HOLM, M. S.; BUHL, S. Underestimating costs in public works projects. Journal of the American Planning Association, 2002. DOI: 10.1080/01944360208976273.

LOVE, P. E. D.; IRANI, Z.; EDWARDS, D. J. A rework reduction model for construction projects. IEEE Transactions on Engineering Management, 2004. DOI: 10.1109/TEM.2004.835092.

KITCHIN, Rob. Big data, new epistemologies and paradigm shifts. Big Data & Society, 2014. DOI: 10.1177/2053951714528481.

KIMBALL, Ralph; CASERTA, Joe. The Data Warehouse ETL Toolkit. Wiley, 2004.

VASSILIADIS, Panos. A survey of Extract–Transform–Load technology. International Journal of Data Warehousing and Mining, 2009. DOI: 10.4018/jdwm.2009070101.

CHEN, H.; CHIANG, R. H. L.; STOREY, V. C. Business Intelligence and Analytics. MIS Quarterly, 2012. DOI: 10.2307/41703503.

LOPES, A. B.; BOSCARIOLI, C.; PEREIRA, E. N.; BEZERRA, R. C. Business Intelligence para apoio à gestão na construção civil: uma revisão sistemática da literatura. AtoZ: novas práticas em informação e conhecimento, v. 9, n. 1, p. 74–84, 2020. DOI: 10.5380/atoz.v9i1.72574.

Published

2026-09-03

Issue

Section

Tecnologia da Informação e Comunicação

How to Cite

SIQUEIRA, G. O.; GARCIA SOBRINHO, R. DE A.; ANDRADE, É. B. Change order analysis using construction document data through Business Intelligence: A case study. NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, v. 21, n. 1, 3 Sept.2026.

Similar Articles

1-10 of 50

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)