Is productivity measured in man-hours per square meter or in square meters per man-hour? It doesn’t matter!
DOI:
https://doi.org/10.46421/entac.v21i1.8995Keywords:
Productivity, Units of measurement, Variability of construction sites, Budgeting, Construction control and schedulingAbstract
This study exemplifies the expression of productivity obtained from fieldwork involving nine different construction services, both in terms of man-hours per square meter of service unit (Hh/m²) and square meters of service unit per man-hour (m²/Hh). The indicators obtained exhibit such variability between minimum and maximum values that it is not intuitively possible to ensure that they differ from a symbolic and convenient value such as 1 man-hour per square meter of service unit. In this case, numerically, both forms of expressing productivity indices are identical. Mechanisms for advancing productivity studies on construction sites are discussed in order to verify whether sample and/or population means significantly deviate from this generic value, despite its simplifying role in budgeting, control, and construction site management processes.