Indicadores de aderência entre planos de médio e curto prazo

Autores

DOI:

https://doi.org/10.46421/sibragec.v11i00.26

Palavras-chave:

Planejamento e Controle da Produção, Indicadores, Sistema Last Planner

Resumo

In the Last Planner® System of Production Control, there are several indicators that are used to measure the efficiency of the technique according to the planning levels (long, medium and short terms), but treated in isolated ways. Typically, there is a lack of coherence, especially between medium and short-term plans. Thus, this study aims to broaden the discussion initiated in previous studies and propose a methodology to evaluate this adherence using indicators. The paper included the analysis of the Production Planning and Control model, and the medium and short-term plans of a residential project located in Natal/RN, resulting in various forms of lack of adherence between the plans, which can lead to wastes to the project's schedule and costs. The main contribution of the research is the improvement of the adherence indicators, in order to reflect the information in a more complete and comprehensive way.

Downloads

Não há dados estatísticos.

Downloads

Publicado

2021-03-18

Como Citar

ELEUTÉRIO, Rodrigo dos Santos; MELO, Reymard Sávio Sampaio de. Indicadores de aderência entre planos de médio e curto prazo. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, 11., 2019. Anais [...]. Porto Alegre: ANTAC, 2019. p. 1–7. DOI: 10.46421/sibragec.v11i00.26. Disponível em: https://eventos.antac.org.br/index.php/sibragec/article/view/26. Acesso em: 3 dez. 2024.

Artigos Semelhantes

1 2 3 4 5 6 7 8 9 10 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.