Application of the GUT Matrix for BIM clash coordination in a public building project
DOI:
https://doi.org/10.46421/entac.v21i1.8757Keywords:
Priorização de incompatibilidades, Clash Detection, Gestão de projetosAbstract
This study analyzes the application of the GUT Matrix (Gravity, Urgency, and Tendency) to prioritize interferences in project coordination within a Building Information Modeling (BIM) environment. A case study was conducted on a complex public university building, involving the modeling of 20 disciplines, a federated model, and 139 combinations for clash detection using Autodesk Navisworks. Of the 423 physical interferences identified, 329 occurred within the Structural vs. Electrical pair, which was the focus of the tool's classification. Regarding the gravity criterion, frequencies of 74.5% and 61.4% were recorded for scores 4 and 5, respectively, highlighting conflicts between the electrical system and beams and columns. Furthermore, 36.8% of the clashes exhibited a high level of criticality. The BIM-GUT integration transformed geometric data into strategic information for decision-making. This methodology reduces rework, optimizes coordination workflows, and strengthens governance in public works, proving replicable in projects that demand high technical rigor and management efficiency.
References
[1] SANTOS, H. P.; STARLING, C. M. D.; ANDERY, P. R. P. Um estudo sobre as causas de aumentos de custos e de prazos em obras de edificações públicas municipais. Ambiente Construído, v. 15, n. 4, p. 225-242, dez. 2015. DOI: http://dx.doi.org/10.1590/s1678-86212015000400048.
[2] MARTINS, J. Z. Building Information Modeling (BIM): principais aspectos e contribuições na construção civil. São Paulo, 2023.
[3] ABDALHAMEED, B. F.; NAIMI, S. Based BIM techniques to clash detection for construction projects. Periodicals Of Engineering And Natural Sciences (Pen), v. 11, n. 1, p. 239, 28 fev. 2023. DOI: http://dx.doi.org/10.21533/pen.v11i1.3461.
[4] BRASIL. Decreto nº 10.306, de 2 de abril de 2020. Estabelece a utilização do Building Information Modelling na execução direta ou indireta de obras e serviços de engenharia realizada pelos órgãos e pelas entidades da administração pública federal. Diário Oficial da União, Brasília, DF, 2020.
[5] LIMA, M. A. O. Aplicação da Matriz GUT como Ferramenta Estratégica para o Planejamento de Ações na Gestão Pública Municipal: revisão bibliográfica. Revista de Ensino, Pesquisa e Extensão em Gestão, p. 39737, 28 de maio de 2025. DOI: http://dx.doi.org/10.21680/2675-8512.2025v8n1id39737.
[6] BRAGA, I. C.; BRANDÃO, F. S.; RIBEIRO, F. R. C.; DIÓGENES, A. G. Application of GUT Matrix in the assessment of pathological manifestations in heritage constructions. Revista Alconpat, v. 9, n. 3, p. 320-335, 29 ago. 2019. DOI: http://dx.doi.org/10.21041/ra.v9i3.400.
[7] COSTA, W. C. da; AQUINO, F. A. S. de. Uso estratégico da metodologia BIM: elaboração e compatibilização de projetos complementares de uma residência de alto padrão. Encontro de Saberes Multidisciplinares, v. 2, n. 1, p. e38, 2024.
[8] ALMEIDA, L. A.; MARÇAL, A. C.; SANTANA, E. S. Modelagem da Informação da Construção (BIM): diretrizes e perspectivas para implementação no setor público brasileiro. In: CONGRESSO INTERNACIONAL DE TECNOLOGIA NA CONSTRUÇÃO, 22., 2022. Anais [...] São Paulo: ANTAC, 2022.