IMPORTÂNCIA DE MODELOS DE CONTRATAÇÃO DE PROJETOS CORPORATIVOS: ESTUDOS DE CASO

Autores

  • Mariana Julião
  • Silvio Melhado

DOI:

https://doi.org/10.46421/entac.v17i1.1488

Palavras-chave:

Scope of work, Corporate project process, Contract criteria

Resumo

Corporation's business strategies changes impact on visual communication and layout configuration to receive clients and attain talents. Architecture firms need to capture and  translate the client's needs into desigb criteria and input their limits to balance client's expectation when signing a contract. This contract must have a commercial purpose, but also be used as a guide to the architecture firm to pre-design and design development, concerning  deadlines, coast control, final product quality and client's satisfaction all long the project process. In many corporate project processes, architects find difficulty in attending client's needs and expectations. Reworks and scope of work changes during design phases turn out to be the most common adversities concerning the design process, overcoming gaps between project design phases and civil work execution, making professionals lose productivity and projects to be more expensive. This paper objective is to check project delivery methods in order to avoid rework, schedule delays and unforeseen costs and, therefore, uses as methodology theme related literature and case studies analysis through interview. After interview and case' scope of work analysis, the result of this research was that lack of information from client drive to scope changes and reworks.

Referências

FINCH, E. Facilities Change Management. Blackwell Publishing Ltd. Oxford, 2012.

LEITE, K. P.; BARROS NETO, J. P. Avaliação do Processo de Projetos emEmpreendimentos Imobiliários. XV Encontro Nacional de Tecnologia do AmbienteConstruído. ENTAC. Maceió, 2014. p. 2071 2080.

LINS, D.; CAMPOS, I.; MORORÓ, M.; BARROS NETO, J. P.; CARDOSO, D.

Caracterização e análise dos métodos de entrega de projeto. XV Encontro Nacionalde Tecnologia do Ambiente Construído. ENTAC. Maceió, 2014. p. 1428 1437.

SILVA, T.; MELHADO, S. B. Gestão de Riscos e Riscos de Gestão em ProjetosIndustriais: Estudos de Caso. In: XVI Encontro Nacional de Tecnologia do AmbienteConstruído. Anais... São Paulo: ENTAC, 2016. P. 3348-3359.

SMITH, J.; LOVE, P. Project Inception: Facilities Change Management in Practice. In.

Finch, Edward. Facilities Change Management (edited by Edward Finch). BlackwellPublishing Ltd. Oxford, 2012.

Downloads

Publicado

2018-11-12

Como Citar

JULIÃO, Mariana; MELHADO, Silvio. IMPORTÂNCIA DE MODELOS DE CONTRATAÇÃO DE PROJETOS CORPORATIVOS: ESTUDOS DE CASO. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1435–1441. DOI: 10.46421/entac.v17i1.1488. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1488. Acesso em: 22 dez. 2024.

Edição

Seção

(Inativa) Gestão e Economia da Construção

Artigos mais lidos pelo mesmo(s) autor(es)

Artigos Semelhantes

1 2 3 4 5 6 7 8 9 10 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.