IDENTIFICAÇÃO DE PERDAS NO SERVIÇO DE REVESTIMENTO CERÂMICO EM UMA OBRA PÚBLICA: ESTUDO DE CASO

Autores

  • Aline Lima
  • Débora de Gois Santos
  • Renan Lima

Palavras-chave:

Wastes, Making-do, Public work, Cost, Lean

Resumo

Various reasons can compromise the physical-financial planning of a construction. Some of them can be categorized into the waste classification proposed by the Toyota Production System (TPS) and the waste defined by Koskela (2004) as making-do. In public work, the occurrence of those types of waste is more common. Besides, the problems caused by the bidding process aggravate the situation. The purpose of the study was to identify which types of waste occur during the ceramic cladding execution, in public work, and how they affect the construction cost. The research object was a construction in the city of Nossa Senhora do Socorro, state of Sergipe, where it was been executed, among other services, the internal ceramic cladding. The methodology applied in this work was a case study with qualitative and descriptive documentary research. The results showed that, during the execution of the service analyzed, five TPS wastes occurred, besides the making-do. Examples of rework, unfinished work and failures in the phases of the bidding process were also observed. Through the comparative analysis between the planned and the executed, it is suggested to increase the costs and impacts in the global time.

Referências

BERNARDES, M. M. e S. Planejamento e Controle da Produção para Empresas deConstrução Civil. Rio de Janeiro: LTC, 2011.

CARNEIRO, S. B. M. et al. Lean and green: a relationship matrix. In: Proceedings of the20th Annual Conference of the International Group for Lean, San Diego, CA, US,2012. p. 18-20. Disponível em: <http://repositorio.ufc.br/bitstream/riufc/5813/1/2012_eve_jpbarrosneto_lean.pdf>.Acesso em: 31 mar. 2017.

DEGANI, C. M.; CARDOSO, F. F. A sustentabilidade ao longo do ciclo de vida deedifícios: a importância da etapa de Projeto Arquitetônico. In: NUTAU 2002Sustentabilidade, Arquitetura e Desenho Urbano. Núcleo de Pesquisa em Tecnologiada Arquitetura e Urbanismo da Faculdade de Arquitetura e Urbanismo daUniversidade de São Paulo. São Paulo, 2002. Disponível em: <http://www.pcc.usp.br/files/text/personal_files/francisco_cardoso/Nutau%202002%20Degani%20Cardoso.pdf>. Acesso em: 05 out. 2017.

KOSKELA, L. Aplication of the New Production Philosofy to Construction. Austin, Texas:The Construction Industry Institute (CII), 1992. (Techinical Report, 72). Disponível em: <https://stacks.stanford.edu/file/druid:kh328xt3298/TR072.pdf>. Acesso em: 10 mar.2018.

LAURIANO, L.A.; TELLO, R. O setor da construção e o mercado da sustentabilidadeincitado pelo isomorfismo institucional. Nova Lima: Caderno de Ideias, 2011.

Downloads

Publicado

2018-11-12

Como Citar

LIMA, Aline; SANTOS, Débora de Gois; LIMA, Renan. IDENTIFICAÇÃO DE PERDAS NO SERVIÇO DE REVESTIMENTO CERÂMICO EM UMA OBRA PÚBLICA: ESTUDO DE CASO. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1521–1534. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1498. Acesso em: 30 jun. 2024.

Edição

Seção

(Inativa) Gestão e Economia da Construção

Artigos mais lidos pelo mesmo(s) autor(es)

1 2 > >> 

Artigos Semelhantes

1 2 3 4 5 6 7 8 9 10 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.