EMPREGO DO BIM 4D NA ELABORAÇÃO DO CRONOGRAMA DE OBRAS POR MEIO DE CUSTOMIZAÇÕES

Autores

  • Larsson Coelho
  • Cecile Ulhoa
  • Maria Carolina Brandstetter

Palavras-chave:

Customization, Planning, BIM 4D, Work breakdown structure

Resumo

One of the great challenges of construction work planning and control is the failure of communication among all participants in the process and Building Information Modeling has been used to enable the improvement of this communication. This research seeks to facilitate the use of BIM in the planning of vertical residential works, from the link of work schedule with model's elements. The objective is to present the use of BIM 4D in the elaboration of the work schedule, through a customization. With the help of Information Technology, it is possible to automate the creation of the Work Breakdown Structure and the linking of the model's elements to the WBS's tasks. Through a model applied to a real case of residential project, the research contributes indicating that the time used in manual and repetitive tasks can be substituted for schedules's analysis, contributing to the improvement of the Construction work planning and, consequently, to the compatibilization between the stages of the process.

Referências

AYRES FILHO, C. Acesso ao modelo integrado do edifício. Dissertação, Programa dePós Graduação em Construção Civil do Setor de Tecnologia, Universidade Federaldo Paraná, Curitiba, 2009.

BATAGLIN, F. S.; VIANA, D. D.; FORMOSO, C. T.; BULHÕES, I. R. BIM 4D aplicado àgestão logística: implementação na montagem de sistemas pré-fabricados deconcreto Engineer-to-order. Ambiente Construído, Porto Alegre, v. 18, n. 1, p. 173-192, jan./mar. 2018.

DANG, D. T. P.; TARAR, M. Impact of 4D Modeling on Construction Planning Process.

2012. 44 f. Dissertação (Master of Science Thesis in the Master Program of Design andConstruction Project Management). Chalmers University of Technology), Göteborg,2012.

EASTMAN, C. et al. BIM Handbook: a guide to Building Information Modeling forOwners, Managers, Designers, Engineers, and Constractors. New York: John Wiley &Sons, 2011.

GLEDSON, B. J.; GREENWOOD, D. The adoption of 4D BIM in the UK constructionindustry: an innovation diffusion approach. Engineering, Construction andArchitectural Management, v. 24, n.6, 2017, p.950-967.

HARRIS, B.; ALVES, T. C. L. 4D Building information modeling and field operations: anexploratory study. 21ª CONFERÊNCIA ANUAL DO GRUPO INTERNACIONAL PARACONSTRUÇÃO LEAN, 2013, Fortaleza. Anais...Fortaleza, 2013. 10p.

PARK, J. ; CAI, H. ; DUNSTON, P.S. ; Ghasemkhani, H. Database-Supported and Web-Based Visualization for Daily 4D BIM. Journal of Construction Engineering andManagement, v. 143, n.10, 2017, 12p.

RODRIGUES, J. L; ISATTO, E. L. Modelagem 4D: Implementação no planejamento delongo prazo de obras da construção civil. In: III SIMPÓSIO BRASILEIRO DE QUALIDADEDO PROJETO NO AMBIENTE CONSTRUÍDO E VI ENCONTRO DE TECNOLOGIA DEINFORMAÇÃO E COMUNICAÇÃO NA CONSTRUÇÃO, 2013, Campinas. Anais...SãoPaulo, 2013. 13p.

ROMCY, N.; CARDOSO, D.; BERTINI, A.; PAES, A. Customização de aplicativo BIM,segundo princípios da Coordenação Modular. 16th Iberoamerican Congress ofDigital Graphics, 2012, Fortaleza. Proceedings Fortaleza, 2012. p. 356-360.

Downloads

Publicado

2018-11-12

Como Citar

COELHO, Larsson; ULHOA, Cecile; BRANDSTETTER, Maria Carolina. EMPREGO DO BIM 4D NA ELABORAÇÃO DO CRONOGRAMA DE OBRAS POR MEIO DE CUSTOMIZAÇÕES. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1920–1928. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1548. Acesso em: 22 jul. 2024.

Edição

Seção

(Inativa) Gestão e Economia da Construção

Artigos Semelhantes

1 2 3 4 5 6 7 8 9 10 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.