INTEGRAÇÃO DA PRODUÇÃO PELA PERSPECTIVA ORGANIZACIONAL

Autores

  • Ana Beatriz Oliveira
  • Marcelo Eduardo Giacaglia

DOI:

https://doi.org/10.46421/entac.v17i1.1586

Palavras-chave:

Integration, Collaboration, Production process, Lelé, Prouvé

Resumo

Integration of the production process is considered a strong instrument to enhance quality and effectiveness in the construction industry and comprises three approaches: contractual, information processing technology and organizational. Even though recent literature stress the necessity of applying all three to achieve integration, a strong organizational approach can compensate for the lesser or absence of the others. The aim of this research is to analyze the presence of organizational integration features in success cases in the construction industry. The assessment considered two cases: one without the use of BIM, which represents the technological approach; and the other with a traditional contractual approach. The first was represented by the works of João Filgueiras Lima (Lelé) and Prouvé and the other by a case study of the production of a series of buildings of a self-storage company.

Referências

AMERICAN INSTITUTE OF ARCHITECTS. Integrated Project Delivery: A Guide. AIANational e AIA California Council, 2007.

______. Integrated Project Delivery An updated working definition - Version 3. AIACalifornia Council, 2014.

ASSOCIAÇÃO BRASILEIRA DOS GESTORES E COORDENADORES DE PROJETOS. Manualde escopo de serviços para coordenação de projetos. 2. ed. São Paulo, 2012.

BAIDEN, Bernard K.; PRICE, Andrew D.F. The Effect of Integration on Project DeliveryTeam Effectiveness. International Journal of Project Management, V. 29, N. 2, fev.2011.

BRASIL. Lei Nº 8.246, de 22 de outubro de 1991. Diário Oficial União, Poder Legislativo,Brasília, DF, 23 out. 1991.

CINQUALBRE, Olivier; et al. Jean Prouvé: La Maison tropicale/ The Tropical House.Paris: Centre Pompidou, 2009.

EASTMAN, Chuck; et al. BIM Handbook: A Guide to Building Information Modeling forOwners, Managers, Designer, Engineers and Contractors. 2. ed. Hoboken: JohnWiley& Sons, Inc., 2011. 634 p.

EGAN, John. Accelerating Change. London: Rethinking Construction, StrategicForum for Construction, 2002.

EL ASMAR, Mounir; HANNA, Awad S.; LOH, Wei-Yin. Evaluating Integrated ProjectDelivery Using the Project Quarterback Rating. Journal of Construction Engineeringand Management, v. 142, n. 1, jun. 2015.

EMMITT, Stephen; GORSE, Christopher. Communication in Construction Teams.

London: Taylor & Francis, 2007.

FORBES, Lincoln H.; AHMED, Syed M. Modern Construction Lean Project Delivery andIntegrated Practices. 1. ed. Boca Raton: CRC Press Taylor & Francis Group, 2011.524 p.

GUIMARÃES, Ana Gabriella Lima. A obra de João Filgueiras Lima No contexto dacultura arquitetônica contemporânea. Tese (Doutorado em Arquitetura eUrbanismo) Faculdade de Arquitetura e Urbanismo, Universidade de São Paulo. SãoPaulo, 2010.

HUPPATZ, D. J. Jean Prouvé's Maison Tropicale: The Poetics of the Colonial Object.

Design Issues, v.26, n. 4, p. 32-44, oct. 2010.

LATHAN, Michael. Constructing the team. London: HMSO, 1994.

LUKIANTCHUKI, M. A. A evolução das estratégias de conforto térmico e ventilaçãonatural na obra de João Filgueiras Lima, Lelé: Hospitais Sarah Salvador e Rio deJaneiro. Dissertação (Mestrado em Arquitetura e Urbanismo), Universidade de SãoPaulo, São Carlos, 2010.

LUKIANTCHUKI, Marieli A.; CAIXETA, Michele C. B. F.; FABRICIO, Márcio M. Integrateddesign of industrialized building systems: The Technology Center of the Sarah Network- CTRS, Brazil. Gestão & Tecnologia de Projetos, Brasil, v. 10, n. 1, p. 99-114, ago. 2015.

ISSN 1981-1543. Disponível em: <http://www.revistas.usp.br/gestaodeprojetos/article/view/95913>. Acessoem: 04 abr. 2018. DOI: 10.11606/gtp.v10i1.95913.

MARQUES, André Felipe Rocha Marques. A obra do arquiteto João Filgueiras Lima,Lelé: projeto, técnica e racionalização. Dissertação (Mestrado em Arquitetura eUrbanismo) Faculdade de Arquitetura e Urbanismo, Universidade PresbiterianaMackenzie. São Paulo, 2012.

NAM, C. H.; TATUM, C. B. Noncontractual Methods of Integration on ConstructionProjects. Journal of Construction Engineering and Management, v. 118, n. 2, jun. 1992.

PROUVÉ, Jean. Conversas com Jean Prouvé. LAVALOU, Armelle (Ed.). Barcelona:Gustavo Gili, 2005.

______. Jean Prouvé us der Fabrik/Industrial Architecture. HUBER, Benedikt; STEINEGGER, Jean-Claude (Ed.) Zurich:Artemis, 1971.

RISSELADA, Max; LATORRACA, Giancarlo. A arquitetura de Lelé: Fábrica e invenção.

São Paulo: Imprensa Oficial do Estado de São Paulo Museu da Casa Brasileira,2010.

TAM, Vivian W.Y; et al. Towards adoption of prefabrication in construction. Buildingand Environment, v. 42, p. 3642 3654, 2007.

TRIGO, Cristina Câncio. Pré-fabricados em argamassa aramada: material, técnica edesenho de componentes desenvolvidos por Lelé. Dissertação (Mestrado emArquitetura e Urbanismo) Faculdade de Arquitetura e Urbanismo, Universidade deSão Paulo. São Paulo, 2009.

Downloads

Publicado

2018-11-12

Como Citar

OLIVEIRA, Ana Beatriz; GIACAGLIA, Marcelo Eduardo. INTEGRAÇÃO DA PRODUÇÃO PELA PERSPECTIVA ORGANIZACIONAL. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 2159–2165. DOI: 10.46421/entac.v17i1.1586. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1586. Acesso em: 23 dez. 2024.

Artigos Semelhantes

1 2 3 4 5 6 7 8 9 10 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.