ANÁLISE DO BIM NO PROCESSO DE PROJETO DE SISTEMAS HIDROSSANITÁRIOS PREDIAIS

Autores

  • Camila Lima
  • Paulo Andery

Palavras-chave:

Hydro-sanitary systems, Project process management, Building information modeling

Resumo

This article presents a diagnosis on the design process of hydro-sanitary systems in real estate projects, with emphasis on the challenges of implementing the BIM (Building Information Modeling). The case study method was used, and semi-structured interviews of different agents, such as designers, builders, design engineers, and architects were carried out. Additionally, other sources of evidence were analyzed, such as drawings, design documents, contracts, and coordination records. The results suggest that difficulties relative to the implementation of the BIM in the design process of hydro-sanitary systems are primarily due to the late involvement of designers in project design, their discontinued and occasional participation and lack of knowledge of the BIM concept.

Referências

ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS. NBR 15.575: Desempenho deedificações habitacionais. Rio de Janeiro, 2013.

ASSOCIAÇÃO BRASILEIRA DE ENGENHARIA DE SISTEMAS PREDIAIS. Ferramentas BIMpara a Engenharia de Sistemas Prediais. 2011. Disponível em:http://piniweb.pini.com.br/construcao/tecnologia-materiais/artigo208522-2.aspxhidráulicos prediais em edificações. In: CONGRESO IBEROAMERICANO DEPATOLOGIA DE LAS CONSTRUCCIONES, 5., CONGRESO DE CONTROL DE CALIDAD, 7.,Montevidéu, 1999. Montevidéu, 1999. p. 935-942.

CUPERTINO, D.; BRANDSTETTER, M.C.G. de O. Proposição de ferramenta de gestãopós-obra a partir dos registros de solicitação de assistência técnica. AmbienteConstruído, Porto Alegre, v. 15, n. 4, p. 243-265, out./dez. 2015. Disponível em: http://dx.doi.org/10.1590/s1678-86212015000400049JERNIGAN, F. BIG BIM little bim: The practical approach to building informationModeling. 1. ed. Salisbury: 4Site. 2007.

LIMA, Camila Fonseca Melo. Gestão do Processo de Projetos Hidrossanitários. 2016.

292f. Dissertação (Mestrado). Programa de Pós-Graduação em Construção Civil /Universidade Federal de Minas Gerais.

NEVES, F.; GUERRINI, F.M. O modelo de requisitos e componentes técnicos paraformação e gerência de redes de cooperação entre empresas da construção civil.

Gestão & Produção, São Carlos, SP, v. 17, n. 1, p. 195-206, 2010. Disponível em:http://www.scielo.br/scielo.php?script=sci_arttext&pid=S0104-530X2010000100015RUSCHEL, R.C.; ANDRADE, M.L.V.X.; MORAIS, M. O ensino de BIM no Brasil: ondeestamos?. Ambiente Construído. v. 13, n. 2, jun. 2013. Disponível em:http://www.seer.ufrgs.br/index.php/ambienteconstruido/article/view/36881/25905SUCCAR, B. Building Information Modelling Framework: a research and deliveryfoundation for industry stakeholders. Automation in Construction, v. 18, n. 3, p. 357-375, 2009.

YIN, R.K. Estudo de caso: planejamento e métodos. 4. ed. Porto Alegre: Bookman,2010. Tradução de: Ana Thorell.

Downloads

Publicado

2018-11-12

Como Citar

LIMA, Camila; ANDERY, Paulo. ANÁLISE DO BIM NO PROCESSO DE PROJETO DE SISTEMAS HIDROSSANITÁRIOS PREDIAIS. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 2191–2200. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1591. Acesso em: 30 jun. 2024.

Artigos Semelhantes

<< < 3 4 5 6 7 8 9 10 11 12 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.