Sistema Last Planner X Advanced Work Packaging

Authors

DOI:

https://doi.org/10.46421/sibragec.v11i00.33

Keywords:

Planejamento e controle, Sistema Last Planner, Advanced work packaging, Workface planning

Abstract

The implementation process of any management system generally faces several obstacles related to organizational changes and the nature of construction work and its requirements (HAMDI, 2013). This document will present two of the existing planning methods. Firstly, the Last Planner System (LPS), which comes from a vast period of studies and consolidation in the field of civil construction, and then an emerging method developed in 2011 by a research team in partnership with Construction Industry Institute (CII) and the Construction Owners Association of Alberta (COAA), entitled Advanced Work Packaging (AWP), focused on megaprojects. Finally, the purpose of this article is to present the two methods, their application and promote a brief discussion about their particularities and complementarities.

Downloads

Download data is not yet available.

Published

2021-03-18

How to Cite

HOOD, Eduarda da Silva Scott; ISATTO, Eduardo Luis; FORMOSO, Carlos Torres. Sistema Last Planner X Advanced Work Packaging. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, 11., 2019. Anais [...]. Porto Alegre: ANTAC, 2019. p. 1–7. DOI: 10.46421/sibragec.v11i00.33. Disponível em: https://eventos.antac.org.br/index.php/sibragec/article/view/33. Acesso em: 4 dec. 2024.

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.