FERRAMENTAS VISUAIS PARA PLANEJAMENTO E CONTROLE DA PRODUÇÃO HIERARQUIZADO

Autores

  • Helena Utzig
  • Carolina Melecardi Zani
  • Cecilia Rocha

DOI:

https://doi.org/10.46421/entac.v17i1.1552

Palavras-chave:

Last Planner, Construction Planning, Waste reducing

Resumo

Construction is a process beyond the transformation of inputs into products. Considering the steps involved (processing, handling, inspection, and material waiting) there are waste generated in all stages, and it cannot be avoided. However, one way to minimize it is to plan and control construction. This paper aims to propose tools that improve the reliability of the planning, as well as to facilitate the communication of it to the users. This investigation was structured in four stages: (i) literature review; (ii) partnership with a construction company willing to implement lean production (iii) implementation of short, medium and long term planning; (iv) analysis of indicators and development of new tools. As a result, the proposed tools are: (i) indicator of unplanned but realized activities compared to the planned activities; (ii) chart of the reasons for non-compliance activities; (iii) layout drawing that shows the activities planned on the week; (iv) a method to develop the balance line for long-term planning.

Referências

ALSEHAIMI, A.; TZORTZOPOULOS, P.; KOSKELA, L. Last Planner System:experiences From Pilot Implementation in The Middle East. Proceedings of17th Annual Conference of the International Group of Lean Construction,Taiwan, 2009ARDIT, D. Construction productivity improvement. Journal of ConstructionDivision, ASCE 111, p. 1-14, 1985BALLARD, G.; HOWELL, G. Shielding Production: An Essential Step in ProductionControl. Technical report No. 97-, Construction Engineering and ManagementProgram, Department of civil and Environmental Engineering, University ofCalifornia, 1998.

BALLARD, Glenn. The Last Planner System of Production Control. 2000. Thesis(Doctor of Civil Engineering). Faculty of Engineering, University of Birmingham,2000.

COURT, P.F., PASQUIRE, C.L.; GIBB, A.G.F. A lean and agile construction systemas a set of countermeasures to improve health, safety and productivity inmechanical and electrical construction. Lean Construction Journal, p. 61-76.,2009.

FRIBLICK, F., OLSSON, V., RESLOW, J. Prospects for Implementing Last Planner inthe Construction Industry. Proceedings of 17th Annual Conference of theInternational Group of Lean Construction, Taiwan, 2009.

KEMMER ET AL. Using the Line of Balance for production system design.

Proceedings of 16th Annual Conference of the International Group of LeanConstruction, UK, 2008.

KOSKELA, L. An exploration towards a production theory and its application toconstruction. 2000. Thesis (Doctor of Civil Engineering). Technical ResearchCentre of Finland, 2000.

LAUFER, A.; TUCKER, R. L. Is construction planning really doing its job? A criticalexplanation of focus, role and process. Construction Management andEconomics, London, United States, n. 5, p. 243-266, 1987.

PORWAL, V.; FERNÁNDEZ-SÓLIS, J.; LAVY, S. RYBKOWSKI, Z. Last Planner SystemImplementation Challenges. Proceedings of 18th Annual Conference of theInternational Group of Lean Construction, Israel, 2010.

RODRIGUES, M. Números do desperdício. Revista Téchne Tecnologia PINI,edição 53. Agosto, 2001.

Downloads

Publicado

2018-11-12

Como Citar

UTZIG, Helena; ZANI, Carolina Melecardi; ROCHA, Cecilia. FERRAMENTAS VISUAIS PARA PLANEJAMENTO E CONTROLE DA PRODUÇÃO HIERARQUIZADO. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1954–1961. DOI: 10.46421/entac.v17i1.1552. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1552. Acesso em: 22 nov. 2024.

Edição

Seção

(Inativa) Gestão e Economia da Construção

Artigos Semelhantes

<< < 26 27 28 29 30 31 32 33 34 35 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.