PLANEJAMENTO E CONTROLE DE ATIVIDADES DE UM ESCRITÓRIO DE PROJETOS BIM DE ARQUITETURA E ENGENHARIA SOB A ÓTICA DO SISTEMA LAST PLANNER

Authors

  • Bianca Maria Pacheco Vieira Universidade Federal do Ceará
  • Rodrigo Magalhães Siqueira Borges Universidade Federal do Ceará
  • José de Paula Barros Neto Universidade Federal do Ceará

DOI:

https://doi.org/10.46421/entac.v18i.1247

Keywords:

Project Management, Process Management, LPS, Lean Construction, BIM

Abstract

Despite all benefits, planning and control is often done in an informally way in many companies, where decisions are often based on employee experience. Thus, this paper aims to perform an analysis of activities planning and control based on Last Planner System of an architecture and engineering office that uses BIM methodology, verifying if the activities planning and control are being effective. Interviews were conducted with office managers to understand how the planning are usually made in short, medium and long levels, as well as to visualize possible inefficiencies. At the end of this study, there were identified several inefficiencies in activities planning and control, especially in communication aspect, both internal (between employees) and external (between clients), suggesting to managers some possibilities for improvements in planning and control for performing activities more efficiently.

References

ALVES, T. C. L.; MARCHESAN, P. R. C.; FORMOSO, C. T. A Análise de Restrições e Planejamento e Controle da Produção de uma Biblioteca. In: SIMPÓSIO BRASILEIRO DE GESTÃO DA QUALIDADE E ORGANIZAÇÃO DO TRABALHO NO AMBIENTE CONSTRUÍDO, 2, 2001, Fortaleza.

Anais [...]. Fortaleza: SIBRAGEQ, 2001.

BALLARD, G.; HOWELL, G. Implementing lean construction: stabilizing work flow. In: ANNUAL CONFERENCE ON LEAN CONSTRUCTION, 2., 1994, Santiago. Anais […]. Santiago: 1997.

M.M.S. BERNARDES. Desenvolvimento de um Modelo de Planejamento e Controle da Produção para Micro e Pequenas Empresas de Construção. 2001. 310 f. Tese (Doutorado) -Curso de Engenharia Civil, Universidade Federal do Rio Grande do Sul, Porto Alegre, 2001.

Building and Construction Authority. Singapore BIM Guide - V2.0. Singapura: Corenet, 2013. 70 p.

COELHO, H. O. Diretrizes e requisitos para o planejamento e controle da produção em nível de médio prazo na construção civil. 2013. 135 f. Dissertação (Mestrado) - Programa de PósGraduação em Engenharia Civil, Universidade Federal do Rio Grande do Sul, Porto Alegre, 2003.

HEINECK, L. F. M.. Dados básicos para a programação de edifícios altos por linha de balanço. In: CONGRESSO TÉCNICO CIENTÍFICO DE ENGENHARIA CIVIL, 1996,Florianópolis. Anais [...]. Florianópolis, 1996.

ICHIHARA, J. A. A Base Filosófica da Linha de Balanço. In: ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 17. 1997, Gramado. p. 197-204.

MESAROS, P.; MANDICAK, T.; BEHUN, M.; SMETANKOVA, J. Applications of Knowledge Technology in Construction Industry. In: INTERNATIONAL CONFERENCE ON EMERGING ELEARNING TECHNOLOGIES AND APPLICATIONS, 16. 2018, Melaka. p. 267-272. http://dx.doi.org/10.1109/iceta.2018.8572231.

PERMONIAN, Raquel Ragonesi; MARQUES NETO, Jose da Costa. Diagnóstico da gestão dos processos de projetos de arquitetura e engenharia: estudo de caso em empresas de são Carlos-SP. ENCONTRO NACIONAL DE ENGENHARIA DE PRODUCAO, 25. 2015, Fortaleza. p. 377-384.

ROSA, Patricia Shalom; ISATTO, Eduardo Luis; RECK, Raquel Hoffmann. Aderência entre planejamento de curto e médio prazo na construção civil. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, 10. 2017, Fortaleza. p. 273-280.

ŠTEFANIČ. Matej; STANKOVSKI, Vlado. A review of technologies and applications for smart construction. American Institution of Civil Engineers (ASCE), v. 172, n. 2, p. 83-87, maio 2019.

Thomas Telford Ltd. http://dx.doi.org/10.1680/jcien.17.00050.

TOMMELEIN, I. D.; BALLARD, H. G. Look ahead planning screening and pulling. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 2., São Paulo, 1997. Anais [...] São Paulo, 1997.

Published

2020-11-04

How to Cite

VIEIRA, Bianca Maria Pacheco; BORGES, Rodrigo Magalhães Siqueira; BARROS NETO, José de Paula. PLANEJAMENTO E CONTROLE DE ATIVIDADES DE UM ESCRITÓRIO DE PROJETOS BIM DE ARQUITETURA E ENGENHARIA SOB A ÓTICA DO SISTEMA LAST PLANNER. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 18., 2020. Anais [...]. Porto Alegre: ANTAC, 2020. p. 1–8. DOI: 10.46421/entac.v18i.1247. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1247. Acesso em: 23 nov. 2024.

Issue

Section

(Inativa) Tecnologia da Informação e Comunicação

Most read articles by the same author(s)

1 2 > >> 

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.