ANALISE DE CONTRATOS PÚBLICOS DE PROJETOS DE ENGENHARIA COM RELAÇÃO AOS SEUS ADITIVOS

Authors

  • Andrea Avelar
  • Mariana Castanheira
  • Michele Carvalho

DOI:

https://doi.org/10.46421/entac.v17i1.1551

Keywords:

Contractual additition, Public works, Public rates, Public administration

Abstract

The study herein presents the analysis of influencing factors of contractual additions, based on the research of information obtained from FISCOBRAS (TCU, a governmental oversight and accounting agency) during the period from 2014 to 2017, regarding completed public works in which physical, economic and geographic characteristics were utilized in analyzing the correlations between the initial cost of contracts with the percentage of added cost; and the initial cost of the contract with the percentage of additional term of those contracts. These are studied categorically, by the type and by the geographic region of construction. From the sample-set utilized, we've found that 28% accrued additional costs; 7% accrued additional time of contracts and 65% accrued both additional costs and time of contract. It can be stated that lengthened time of contract are associated with the initial cost of the contract in building construction, where works of this type, with a higher initial value show a trend of higher additional costs. However, when the same analysis was applied to highways and railways it showed no such trend of results. There is also no direct relationship between the work site and additional costs or time of contracts. This is an important publication in furnishing information in the public construction sector for preview possible risks in contractual additions terms.

References

ANDERY, P., SANTOS, H. P., STARLING, C. M. D., Estudo introdutório sobre aditivoscontratuais em obras públicas de edificações de âmbito municipal. In: In: SimpósioBrasileiro de Gestão e Economia da Construção, SIBRAGEC 2003, Salvador. AnaisANTAC, Salvador, 2013.

ASSIS A.P., BARBOSA T.J.E., ALMEIDA M.G.G, MAIA J.A.C.M. Métodos Estatísticos eProbabilísticos Aplicados a Geotecnia. Universidade de Brasília, Departamento deEngenharia Civil e Ambiental-FT Brasília - Publicação: G.AP-AA002/20CANTARELLI, C. C., WEE, B. V., MOLIN, E. J. E., FLYVBJERG, B. ,Different costperformance: Different determinants? The case of costoverruns in Dutch transport infrastructure projects. Transp. Policy, 2012(b), 22(3), 88-95.

CASTRO , U. V., Gerenciamento de contrato: aditivo contratual em obra pública deinfraestrutura viária. Dissertação (especialização) Universidade Federal de MinasGerais, Escola de Engenharia Belo Horizonte, p.10. 2013.

FERREIRA, F. M. P. F. R.; PAGANOTTR, J. A.; PIUS, M. A. A interface na gestão deescopo, prazo, custo e qualidade em projetos. Boletim Técnico da FATEC-SP BT/24PAG. 10 A 15 2008, São Paulo.

FREITAS, L. A.; CARVALHO, M. T. M. Levantamento de aumento do custo e prazo deobras públicas de 2008 a 2015. In: 1º Simpósio Brasileiro de Tecnologia daInformação e Comunicação na Construção, 10º Simpósio Brasileiro de Gestão eEconomia da Construção (SBTIC+SIBRAGEC) ,2017, Fortaleza.

IBGE - Instituto Brasileiro de Geografia e Estatística. Pesquisa Anual da indústria daConstrução 2015. Rio de Janeiro, v.25, 2015, p.1-98.

HSU P., Aurisicchio M., Angeloudis P. Investigating schedule deviation in constructionprojects through root causes analysis.

HUO T.; Ren H.; Cai W.; Qiping S. G.; Liu B.; Measurement and Dependence AnalysisCost Overruns in Megatransport Infrastructure Projetcts: Case Study in Hong Kong. J.

Constr. Eng. Manage., 2017, 143(7): 04017025.

Love P.E.D.; Ahiaga-Dagbui D.D.; Irani Z.; Cost overruns in transportation infrastructureprojects: Sowing the seeds for a probabilistic theory of causation. TransportationResearch Part A 92 (2016) 184 194.

Relatórios de auditoria realizados no âmbito dos Fiscobras e encaminhados aoCongresso Nacional. Disponível em: <http://portal.tcu.gov.br/comunidades/obraspublicas/informacoes/historico/>. Acesso em: março 2018.

SANTOS, H. P. Diagnóstico e análise das causas de aditivos contratuais de prazo evalor em obras de edificações em uma instituição pública. Dissertação (mestrado)Universidade Federal de Minas Gerais, Escola de Engenharia Belo Horizonte, p.159.2015.

SANTOS, H.P.;STARLING,C.M.D.;ANDERY,P.R.P. Estudo introdutório sobre aditivoscontratuais em obras públicas de edificações de âmbito municipal. RevistaAmbiente Construído, 4ª Ed., vol 15, Porto Alegre, 2015.

VILHENA, E.J., PEREIRA J.R., CAMARGO J. C., CAVALCANTE R. J., ALMEIDA L. A., ALHOM. R., Rodrigues Alho, Dias Filho N., Gomes R.M..Técnicas econométricas e seupapel inovador no cálculo do sobrepreço: o caso da Lava Jato. Revista TCU, 4aed.,Brasília,2017.

VELAYUDHAN D.P.; THOMAS S., Measuring Project Success: Emergence ofDimensions, The International Journal of Business & Management, v. 4, p.48-53.2016.

Published

2018-11-12

How to Cite

AVELAR, Andrea; CASTANHEIRA, Mariana; CARVALHO, Michele. ANALISE DE CONTRATOS PÚBLICOS DE PROJETOS DE ENGENHARIA COM RELAÇÃO AOS SEUS ADITIVOS. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1945–1953. DOI: 10.46421/entac.v17i1.1551. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1551. Acesso em: 25 nov. 2024.

Issue

Section

(Inativa) Gestão e Economia da Construção

Similar Articles

<< < 22 23 24 25 26 27 28 29 > >> 

You may also start an advanced similarity search for this article.