APLICAÇÃO DO TVD ASSISTIDO POR BIM NA FASE INICIAL DE UM PROJETO COLABORATIVO

Authors

  • Lucas Melchiori Pereira
  • Fernanda Aparecida Marino Ferrari
  • Gabriela Henriques Camelo
  • Danilton Luis Lima de Jesus Aragão

DOI:

https://doi.org/10.46421/entac.v17i1.1627

Keywords:

Collaborative design, Target value design, Building information modeling

Abstract

The collaborative design process based on Building Information Modeling (BIM) and Target Value Design (TVD) was discussed from the results of a workshop offered by a post-graduate discipline in Architecture. The aim was to address operational aspects in the adoption of such practices experienced by the project team. The analysis method was the perception triangulation of the professionals involved in concept design activity. The design team intervened in process model defined from the theory, employing the reflection in action. It was concluded that the problem-solution iteration alters the functions importance of the constructive systems during the design concept, which makes inadequate the resources preallocation to comply the client requirements.

References

BALLARD, G.; REISER, P. The St. Olaf College Fieldhouse Project: A Case Study inDesigning to Target Cost. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUPago. 2004. p. 234-249.

CHEN, F.; Romano, N.; NUNAMAKER, J.; BRIGGS, R. A collaborative projectmanagement architecture. In: Conference Paper, February 2003. Disponível em: <https://www.researchgate.net/publication/3998926> Acesso em: 30 nov. 2017.

CORRÊA, M. V. G.; RUSCHEL, R. C. Tendências da colaboração em Arquitetura,Engenharia, Construção. In: FABRICIO, M. M.; ORNSTEIN, S. W. Qualidade no Projetode Edíficios. 1. ed. São Carlos: RiMa, 2010. p. 119-136.

IBUSUKI, U.; KAMINSKI, P. C. Product development process with focus on valueengineering and target-costing: A case study in an automotive company.

International Journal of Production Economics, Nova York, v. 105, 2007.

LU, W.; ZHANG, D.; ROWLINSON, S. How Important is Inter-organizationalCollaboration to the Success of Construction Project BIM Implementation. Disponívelem: <https://www.researchgate.net/publication/302923780> Acesso em: 30 nov.2017.

MACOMBER, H; HOWELL, G.; BARBERIO, J. Target Value Design: Nine FoundationalPractices for Delivering Surprising Client Value. California: The American Institute ofArchitects, 2007. 4p. (Practice Management Digest).

MANZIONE, L. Proposição de uma Estrutura Conceitual de Gestão de Processo deProjeto Colaborativo com o Uso do BIM. 2013. 325f. Tese (Doutorado)-Departamentode Engenharia de Construção Civil, Escola Politécnica da Universidade de SãoPaulo, São Paulo, 2013.

MORAIS, M.; GRANJA, A. D.; RUSCHEL, R. C. Restrições Orçamentárias E Entrega DeValor: Sinergias Entre Bim E Custeio-Meta. Gestão & Tecnologia de Projetos. [S.l: s.n.].

Disponível em: <http://www.revistas.usp.br/gestaodeprojetos/article/view/81141>,2015. Acessado em: 18 mar. 2018.

NONAKA, I.; TAKEUCHI, H. Criação de conhecimento na empresa: como asempresas japonesas geram a dinâmica da inovação. Rio de Janeiro: Campus, 1997.

PALETZ, S. B. F.; CHAN, J.; SCHUNN, C. D. The dynamics of micro-conflicts anduncertainty in successful and unsuccessful design teams. Design Studies, v. 50, p. 3969, 1 maio 2017. Disponível em:<https://www.sciencedirect.com/science/article/pii/S0142694X17300133>. Acessoem: 21 mar. 2018.

PENNANEN, A.; BALLARD, G.; HAAHTELA, Y. Target costing and designing to targets inconstruction. Journal of Financial Management of Property and Construction, v. 16,n. 1, p. 52 63, 2011. Disponível em: <https://doi.org/10.1108/13664381111116089>.Acesso em 18 mar. 2018.

PENTTILÄ, H. Describing the changes in architectural information technology tounderstand design complexity and free-form architectural expression, ITCON 11(Special Issue The Effects of CAD on Building Form and Design Quality), 2006. p. 395-408.

SCHÖN, D. A. Problems, frames and perspectives on designing. DESIGN STUDIES,Cambridge, v. 5, n. 3, p. 132-136, julho 1984. ISSN 0142-694X.

SUCCAR, B. Building information modelling framework: A research and deliveryfoundation for industry stakeholders. Automation in Construction 18, 2009. p 357-375.

TANAKA, T. Target Costing at Toyota. Cost Management, Spring 1993, p. 4-11.

Published

2018-11-12

How to Cite

PEREIRA, Lucas Melchiori; FERRARI, Fernanda Aparecida Marino; CAMELO, Gabriela Henriques; ARAGÃO, Danilton Luis Lima de Jesus. APLICAÇÃO DO TVD ASSISTIDO POR BIM NA FASE INICIAL DE UM PROJETO COLABORATIVO. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 2329–2337. DOI: 10.46421/entac.v17i1.1627. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1627. Acesso em: 23 nov. 2024.

Similar Articles

<< < 52 53 54 55 56 57 58 59 60 61 > >> 

You may also start an advanced similarity search for this article.