DIRETRIZES PARA MODELAGEM 3D DIRECIONADA A OTIMIZAÇÃO DO PROCESSO DE QUANTIFICAÇÃO

Authors

  • Josyanne P. Giesta
  • Emilha C. F. da S. Lira
  • Thalita G. Costa
  • Jessyka A. A. da Silva

Keywords:

BIM, 3D modeling, Quantification

Abstract

The process of quantification of engineering services are of great relevance for the development of the budget of the work and for the physical-financial schedule, with the definition of the term of execution of the enterprise. However, in spite of all its importance, the quantitative survey is still very individualized, that is, without a standardization of quantification criteria. In this way, it is a job that requires a qualified professional, with experience in constructive techniques and who has an excellent view of projects, this being a time consuming and susceptible to errors and omissions process, besides presenting great difficulty to the conference. Studies have pointed out the possibility of insertion of BIM in this activity, with a perspective of great advantages, due to the ease of extraction of information from 3D models. Nevertheless, more detailed studies that present guidelines that can guide companies and professionals in the quantification process through BIM models are scarce. In this context, the present article proposes to develop, based on bibliographical review and in a case study, a flowchart with guidelines that guide the quantification process via BIM models.

References

ANDRADE, L. S. A contribuição dos sistemas BIM para o planejamento orçamentáriodas obras públicas: estudo de caso do auditório e da biblioteca de Planaltina. 2012.

122 f. Dissertação (Mestrado em Arquitetura e Urbanismo) Universidade de Brasília,Brasília, 2012. Disponível em:<http://repositorio.unb.br/bitstream/10482/10637/1/2012_LudmilaSantosAndrade.pdf>. Acesso em: 24 mar. 2018.

DRESCH, A.; LACERDA, D. P.; ANTUNES Jr., J. A. V. Design Science Research: Métodode Pesquisa para Avanço da Ciência e Tecnologia. Porto Alegre: Bookman, 2015.204 p.

GONZÁLEZ, M. A. S. Noções de orçamento e planejamento de obras. São Leopoldo,2008. Notas de aula da Universidade do Vale do Rio dos Sinos. 49 p. Disponível em:<http://engenhariaconcursos.com.br/arquivos/Planejamento/Nocoesdeorcamentoeplanejamentodeobras.pdf>. Acesso em: 24 mar. 2018.

MELHADO, S.; PINTO, A. C. Benefícios e desafios da utilização do BIM para extraçãode quantitativos. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DACONSTRUÇÃO, 9., ENCONTRO LATINO AMERICANO DE GESTÃO E ECONOMIA DACONSTRUÇÃO, 6., 2015, São Carlos. . Anais... Porto Alegre: ANTAC, 2015. Disponívelem: <http://www.infohab.org.br/sibraelagec2015/artigos/SIBRAGECELAGEC_2015_submission_45.pdf>. Acesso em: 24 mar. 2018.

SABOL, L. Challenges in cost estimating with Building Information Modeling. IFMAWorld Workplace. 2008. apud SANTOS, A. P. L. et al. A utilização do BIM em projetosde construção civil. Revista Iberoamericana de Engenharia Industrial, Florianópolis,SC, v. 1, n. 2, dez. 2009. ISSN 2175-8018. Disponível em:<http://incubadora.periodicos.ufsc.br/index.php/IJIE/article/view/171/pdf_49 >.Acesso em: 24 mar. 2018.

Published

2018-11-12

How to Cite

GIESTA, Josyanne P.; LIRA, Emilha C. F. da S.; COSTA, Thalita G.; SILVA, Jessyka A. A. da. DIRETRIZES PARA MODELAGEM 3D DIRECIONADA A OTIMIZAÇÃO DO PROCESSO DE QUANTIFICAÇÃO. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 3181–3187. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1739. Acesso em: 18 jul. 2024.

Issue

Section

(Inativa) Tecnologia da Informação e Comunicação

Similar Articles

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.