Analysis of the complete kit in the supply of entries for activities at the construction site

Authors

DOI:

https://doi.org/10.46421/entac.v19i1.2079

Keywords:

Lean Construction. Complete Kit. Planning. Productivity. Losses.

Abstract

In Lean construction, the Complete Kit aims to improve productivity, quality and reduce losses at a site by providing solid inputs for the start of the activity. A case study was carried out to analyze the influence of Kit Complete in the production of a multi-story building. were assembly data, process flowchart assembly data and assembly trips. Suggest that the use of the Complete Kit improves the control of materials, equipment and information to reduce some losses, including making-do.

Author Biographies

Juliana de Oliveira Gomes Costa Juliana de Oliveira Gomes Costa, State University of Maringa

Master in Urban Engineering from the State University of Maringa (Maringa - PR, Brazil).

 

VitorVitor Augusto Prado Guisso, State University of Maringa

Civil Engineer from the State University of Maringa (Maringa - PR, Brazil).

 

References

CARDOSO, F. F. Novos enfoques sobre a gestão de produção: como melhorar o desempenho das empresas de construção civil. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 1993, São Paulo. Anais… 1993, V.2, p.557-559.KOLAREVIC, B.; MALKAWI, A. M. (Ed.). Performative Architecture Beyond Instrumentality. Nova Iorque: Spon Press, 2005.

DE ANDRADE SOARES, Klisman Mateus et al. Aplicação do kit completo para minimizar a interrupção do fluxo de trabalho: making-do e trabalho inacabado. SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, v. 11, p. 1-7, 2019.

FARAH, M. F.S. Alterações na organização do trabalho na construção habitacional: a tendência de racionalização. In: ENCONTRO NACIONAL DA ANPOCS, 12, 1998, Águas de São Pedro, Anais… 1998.LEWIN, R. Complexity: life at the edge of chaos. 2. ed. Chicago: University of Chicago Press, 2000

FORMOSO, et.al. Perdas na construção civil: conceitos, classificações e seu papel na melhoria do setor, Porto Alegre, p.01-11, 1996.

KOSKELA, L. Application of the New Production Philosophy to Construction. CIFE Technical Report, n. 72: Center for Integrated Facility Engineering, Salford ,1992.

KOSKELA, L. Making-do – The Eighth Category of Waste. In: CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 12, 2004, Dinamarca. Proceedings…Dinamarca, 2004.

LIMA, E. C.; NETO, C. R. O. Revolução Industrial : considerações sobre o pioneirismo industrial inglês. Revista Espaço Acadêmico, [S. l.], p. 102–113, 2017.

RONEN B. The complete kit concept. International Journal of Production. Taylor & Francis, v. 30, n° 10, p. 2457 - 2466, London, 1992.

SANTOS, D.G. Modelo de gestão de processos na construção civil para identificação de atividades facilitadoras. Tese de Doutorado (Doutor em Engenharia de Produção) - Universidade Federal de Santa Catarina, Florianópolis, 2004.

Published

2022-11-07

How to Cite

JULIANA DE OLIVEIRA GOMES COSTA, Juliana de Oliveira Gomes Costa; GUISSO, VitorVitor Augusto Prado. Analysis of the complete kit in the supply of entries for activities at the construction site. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 19., 2022. Anais [...]. Porto Alegre: ANTAC, 2022. p. 1–11. DOI: 10.46421/entac.v19i1.2079. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/2079. Acesso em: 24 nov. 2024.

Issue

Section

(Inativa) Gestão e Economia da Construção

Similar Articles

<< < 60 61 62 63 64 65 66 67 68 69 > >> 

You may also start an advanced similarity search for this article.