MAPEAMENTO DE FLUXO DE VALOR NA ELABORAÇÃO DE PROJETO HIDRÁULICO COM UTILIZAÇÃO DE MÉTODO TRADICIONAL E O REVIT

Autores

  • Lucas Leite
  • Rodrigo Veras
  • Geórgia Jereissati
  • Tiago Morais

DOI:

https://doi.org/10.46421/entac.v17i1.1486

Palavras-chave:

Lean construction, Building information modeling, Value stream mapping

Resumo

The financial crisis in recent years has been affecting brazilian construction sector. In spite of this, construction companies are constantly innovating to keep their clients with new methods and technologies in order to be able to reduce significantly the waste and costs. The use of Building Information Modeling (BIM),- a digital representation of the physical and functional characteristics of a building, serving as a source of shared information and data about it - appears as one of the resources to assist the development and understanding their projects and execution. The Lean has several methods, among them, the Value Stream Mapping (VSM), which main objective is to show the wastes contained in the production system and propose improvements. This paper aims to present the VSM through the creating a hydraulic project of a residential building and compare the results obtained with the use of Autocad and Revit softwares. Associated with the use of BIM, Lean practices were also introduced, aiming to improve productivity, reduce losses, and guarantee better quality to the system. The result found was a reduction of approximately 54% of the Permanence Time, generated by the application of the VSM of the future state using the BIM.

Referências

BARBOZA, N. Veja como empresas brasileiras implementaram o BIM em seusprojetos. Construção Mercado, São Paulo, v.1, n.176, mar. 2016.

CAMPESTRINI, T.F; GARRIDO, M.C; MENDES JR, R; SCHEER, S; FREITAS, M.C.D.

Entendendo BIM: Uma visão do projeto de construção sob o foco da informação.Curitiba, 2015.

CHEN, J.C; COX, R.A. Value Stream Management for Lean Office A Case Study.

American Journal of Industrial and Business Management, [ S.l]. v.2,n.2,p. 17- 29,2012. Scientific Reasearch Publishing , Inc,.http;//dx.doi.org/104236/ajibm.2012.22004.

DANTAS FILHO, J. B. P; CÂNDIDO, L. F; BARROS NETO, J. P. Sinergia entre ConstruçãoVerde, Construção Enxuta e BIM para internacionalização da construção: umarevisão sistemática da literatura. In: ENCONTRO NACIONAL DE TECNOLOGIA DOAMBIENTE CONSTRUÍDO, 16., São Paulo, 2016. Anais... Porto Alegre: ANTAC, 2016.

DOS REIS, C. C; Moro, M. F., de Almeida Flores, S., & Weise, A. D. Compagnoni .

Construção enxuta, proposta de diagnóstico e análise do canteiro de obras. Revistada FAE, v. 20, n. 1, p. 42-58, 2017.

EASTMAN, C; TEICHOLZ, P; SACKS, R; LISTON, K. Manual de BIM: um guia demodelagem da informação da construção para arquitetos, engenheiros, gerentes,construtores e incorporadores. Porto Alegre: Bookman, 2014.

KOSKELA, L. Application of the new production philosophy to construction. 1992.

Techniccal Repport 72. Center for Integrated Facility Engineering. Department ofCivil Engineering. Stanford Univeristy, Stanford, 1992.

MONTEIRO, M.F.J.R; PACHECO, C.C.L.; CARVALHO, J.D; PAIVA, F.C.ImplementingLean Office: A Sucessful Case in Public Sector. FME Transactions, v.43, n.4, p.303-310,2015.

NUNES, D.M; FACCIO, K . Avaliação fatores chave implementação lean office.

Produto&Produção,v.15, n.4, p.1-16, dez.2014.

OHNO, T. O Sistema Toyota de Produção: além da produção em larga escala. PortoAlegre: Bookman, 1997.

OLIVEIRA, R.B.M; CORRÊA, V.A; NUNES, L.E.N. Mapeamento do fluxo de valor em ummodelo de simulação computacional. Revista Produção Online, Florianópolis, v. 14,n. 3, p.837-861, jul./set. 2014. Disponível em:<https://producaoonline.org.br/rpo/article/view/1461/1177>. Acesso em: 10 set.2017.

ROTHER, M.; SHOOK, J. Aprendendo a enxergar: mapeando o fluxo de valor paraagregar valor e eliminar o desperdício. São Paulo: Lean Institute Brasil, 2003.

RUTTIMANN, B. G.; FISCHER, U. P.; STOCKLI, M. T. Leveraging Lean in the Office: LeanOffice Needs a Novel and DifferentiatedApproach. Journal of Service Science andManagement, n. 7, p. 352-360, 2014.

SABUR, V. F.; SIMATUPANG, T. M.; Improvement of customer response time using LeanOffice. International Journal of Services and Operations Management, v. 20, n. 1, p.59-85, 2015.

YIN, R.K. Estudo de caso Planejamento e Métodos.5.ed. São Paulo: Bookman, 2015.

Downloads

Publicado

2018-11-12

Como Citar

LEITE, Lucas; VERAS, Rodrigo; JEREISSATI, Geórgia; MORAIS, Tiago. MAPEAMENTO DE FLUXO DE VALOR NA ELABORAÇÃO DE PROJETO HIDRÁULICO COM UTILIZAÇÃO DE MÉTODO TRADICIONAL E O REVIT. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1419–1428. DOI: 10.46421/entac.v17i1.1486. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1486. Acesso em: 23 dez. 2024.

Edição

Seção

(Inativa) Gestão e Economia da Construção

Artigos Semelhantes

<< < 16 17 18 19 20 21 22 23 24 25 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.