A UTILIZAÇÃO DE NOVAS TECNOLOGIAS NA ELABORAÇÃO DE PROJETOS DE HABITAÇÕES DE INTERESSE SOCIAL

Autores

  • José Alexandre Sousa Filho
  • Karoliny Barbosa Alves
  • Clarissa de Faria Brandão
  • Geórgia Jereissati

Palavras-chave:

Lean, SketchUp, Value stream mapping

Resumo

The construction industry is affected by the current economic crisis, so companies are looking for alternatives to lower costs and one way is to bet on using new technologies, such as design software, in which the project is digitally represented, and the customer may have more information and data about the building, thus diminishing the unforeseen in the process. Another technique is lean construction, where companies seek to reduce losses. This study combines design software and Lean, aiming to prepare the value stream mapping (VSM), a lean tool, in the modeling of an Architectural project, in order to identify and eliminate waste in the process, beyond its costs. In this quantitative research, a case study was used for an interest social house. Through the current VSM and identification wastes, it was suggested the future VSM, aiming elimination waste of the process, reduction of the cycle time, leveling of the activities. It was suggested a reduction of 19.10% in the Lead Time and 16.36% in the Processing Time. The study ratifies the idea that solutions based on the lean allied to software designs improve quality of the final project, as well as reduce the time, therefore the price of the projects.

Referências

CAMPOS, V. F. Qualidade total: padronização de empresas. Nova Lima: INDG, 2004.

GALGANO, A. Calidad total: clave estratégica para la competitividad. Bogotá: Diazde Santos, 1994.

GERLACH, G; et al. Proposta de melhoria de layout como fator para a otimizaçãodo processo produtivo organizacional. : proposed layout improvement as factor foroptimization of production process organizational. Brazilian Journal of Management/ Revista de Administração da UFSM. 10, 41-55, Apr. 2, 2017. ISSN: 19834659MARODIN, G. A.; SAURIN, T. A. Implementing lean production systems: researchareas and opportunities for future studies. International Journal of ProductionResearch, v. 51, n. 22, p. 6663-6680, 2013. http://dx.doi.org/10.1080/00207543.2013.826831MCMANUS, H. L. Product Development Value Stream Mapping (PDVSM), release 1.0Cambrige : Lean Aerospace Initiative Center (LAI), 2005.

NETO, A. D.; GÓMES, L. A.; SOUZA, A.C. Desenhando com Google SketchUp.

Florianópolis: Visual Books, 2010. 350pOHNO, T. O Sistema Toyota de Produção: além da produção em larga escala.

Tradução: Cristina Schumacher. Porto Alegre: Bookman, 1997.

STRONG, J. D. SketchUp as a Construction Tool for Large-Scale Subsurface Structures:Three-Dimensional Visualization of the Parry Sound Domain, Grenville Province,Ontario. Cartographica. 50, 3, 179-188, set. 2015. ISSN: 03177173.

TAPPING, D; SHUKER, T. Value stream management for the lean office: 8 steps toplanning, mapping and sustaining lean improvements in administrative areas. NewYork: Productive Press, 2003.

TATURATI, R. C. Aplicação do Lean Office no setor administrativo público.

Dissertação (Mestrado em Engenharia de Produção). Escola de engenharia de SãoCarlos, Universidade de São Paulo USP, São Carlos, 2007. 122f

Downloads

Publicado

2018-11-12

Como Citar

SOUSA FILHO, José Alexandre; ALVES, Karoliny Barbosa; BRANDÃO, Clarissa de Faria; JEREISSATI, Geórgia. A UTILIZAÇÃO DE NOVAS TECNOLOGIAS NA ELABORAÇÃO DE PROJETOS DE HABITAÇÕES DE INTERESSE SOCIAL. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1876–1884. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1543. Acesso em: 18 jul. 2024.

Edição

Seção

(Inativa) Gestão e Economia da Construção

Artigos Semelhantes

<< < 2 3 4 5 6 7 8 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.