TVD E BIM APLICADOS AO PROJETO DE ARQUITETURA HOSPITALAR: EXPERIÊNCIA DIDÁTICA DO USO DE FERRAMENTAS DE APOIO À DECISÃO
DOI:
https://doi.org/10.46421/entac.v17i1.1614Palavras-chave:
BIM, TVD, Target Costing, Healthcare architectureResumo
The association of Target Value Design (TVD) and Building Information Modeling (BIM) has been used to improve the building design process, as support for decisions in the early stages of development. This study intends to verify the use of Value Analysis (AV) tools in TVD and BIM to develop the architectural design for a Basic Health Unit (UBS) of Araraquara-SP, aiming to reduce the cost and increase the value for the user. The method included Bibliographic review, Modified Debate, Panels, Workshop and Modeling. As a result, there was a reduction of costs, an increase of the built area and greater functionality. The conclusion shows the need for improvement and consolidation of TVD and BIM tools applicable to public building, to mediate a collaborative design process, which considers the consumption of financial resources over the building life cycle and the expectations of its users.
Referências
AIA The American Institute of Architects. Integrated project delivery: a guide. AIACalifornia Council, 2007. Disponível em:<http://info.aia.org/siteobjects/files/ipd_guide_2007.pdf>. Acesso em: 21 mar. 2018.
COOPER, R.; SLAGMULDER, R. Target costing and value engineering. The IMAFoundation for Applied Research, Inc. 1997, New Jersey.
EASTMAN, C.; TEICHOLZ, P.; SACKS, R.; LISTON, K. Manual de BIM: um guia paramodelagem da informação da construção para arquitetos, engenheiros gerentes,construtores e incorporadores. Tradução de Cervantes Gonçalves Ayres Filho; KléosMagalhães Lenz César Junior, et al. Porto Alegre: Bookman, 2014.
FABRÍCIO, M. M.; MELHADO, S. B. Projeto Simultâneo e a qualidade ao longo do ciclode vida do empreendimento. In: ENCONTRO NACIONAL DE TECNOLOGIA DOAMBIENTE CONSTRUÍDO, 8., 2000, Salvador. Anais... Porto Alegre: ANTAC, 2000.Disponível em:<http://www.infohab.org.br/entac2014/2000/Artigos/ENTAC2000_447.pdf>. Acessoem: 21 mar. 2018.
FEIL, P.; YOOK, K., KIM, I. Japanese Target Costing: A Historical Perspective.
International Journal of Strategic Cost Management/Spring 2004. Disponível em:<https://www.uakron.edu/cba/docs/ins.../TCHistory_formatted.pdf>. Acesso em: 21mar. 2018.
MORAIS, M. Disponibilização do Projeto UBS em sistema BIM. Disciplina de PósGraduação em Arquitetura e Urbanismo. 17 aug. 2017, 21 sep. 2017. Notas de Aula.
Instituto de Arquitetura e Urbanismo, IAU, USP, São Paulo, 2017.
OLIVA, C. A.; MELO, R. S.; GRANJA, A. D. Target Value Design na gestão do processode projeto por meio de simulação: difusão de conceitos e reflexões teóricas. PARCPesquisa em Arquitetura e Construção, Campinas, SP, v. 6, n. 1, p. 4-15,jan./mar.2015., ISSN 1980-6809. Disponível em:<https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634989>.Acesso em: 21 mar. 2018.
ORIHUELA, P.; ORIHUELA, J.; PACHECO, S. Communication protocol forimplementation of Target Value Design (TVD) in Building Projects. CreativeConstruction Conference, 2015 (CCC2015). Procedia Engineering, 123, 361 369,2015. Disponível em:<https://www.researchgate.net/publication/283523853_Communication_Protocol_for_Implementation_of_Target_Value_Design_TVD_in_Building_Projects>. Acesso em:21mar. 2018.
RUIZ, J. A. Engenharia de valor na construção de edifícios: simulação de aplicações.
2011. 139f. Dissertação (Mestrado) Faculdade de Engenharia Civil, Arquitetura eUrbanismo, Unicamp. Campinas, 2011. Disponível em:<http://repositorio.unicamp.br/bitstream/REPOSIP/258264/1/Ruiz_JoycedeAndrade_M.pdf>. Acesso em: 21 mar. 2018.
TCPO. Tabela de Composições de Preços para Orçamentos. 13ª edição. São Paulo,PINI, 2010.
WANKAT, P.C.; OREOVICZ, F.S. Teaching Engineering. Purdue University Press, 2015.
WERNKE, R.; BORNIA, A. C. Considerações acerca do custeio-meta (target-costing).
In: XXI Encontro Nacional de Engenharia de Produção (ENEGEP), 2001, Salvador.
Disponível em: .Acesso em: 21 mar. 2018.