FERRAMENTA PARA CONTROLE DA TERMINALIDADE NO PLANEJAMENTO BASEADO EM LOCALIZAÇÃO COM O SUPORTE DE BIM

Authors

  • Fabrício Vargas Universidade Federal do Rio Grande do Sul
  • Marcus Pereira Sterzi Consultor e Sócio-Fundador da LD Consulting
  • Karina Bertotto Barth Universidade Federal do Rio Grande do Sul
  • Carlos Torres Formoso Universidade Federal do Rio Grande do Sul

DOI:

https://doi.org/10.46421/entac.v18i.1182

Keywords:

completeness, performance measurement, production planning and control, production management

Abstract

Construction companies traditionally use earned value as a metric to assess project progress and performance in terms of time. A major drawback of this approach is that it is not a reliable measure if batch sizes are large, and when tasks are not properly finished due to the lack of process quality. Therefore, process-based indicators can contribute to increase the reliability of the result-based indicators, as they focus on evaluating performance in intermediate stages, while providing information during the execution to identify possible wastes and problems. This paper presents a tool for controlling task completion in location-based planning with the support of BIM. This tool consists of a matrix for monitoring batch completion, which produces a metric. The methodological approach adopted in this investigation was Design-Science Research. This research was conducted in six projects carried out by companies located in Brazil and Chile. The main contributions of this paper refer to the way the tool was used to monitor task completion. The proposed tool can provide an updated overview of production status, information about uncompleted critical tasks and existing constraints, and support decision making in production planning and control.

References

BABUROGLU, O. N.; RAVN, I. Normative Action Research. Organization Studies, v. 13, n. 1, p.19–34, 1992.

BRAGLIA, M.; GABBRIELLI, R.; MARRAZZINI, L. Overall Task Effectiveness: a new Lean performance indicator in engineer-to-order environment. International Journal of Productivity and Performance Management, v. 68, n. 2, p. 407-422, 2019.

BJÖRNFOT, A.;JONGELING, R. Application of line-of-balance and 4D CAD for lean planning.

Construction innovation, v. 7, n. 2, p. 200-211, 2007.

FIREMAN, M.; FORMOSO, C.; ISATTO, E. Integrating Production and Quality Control: Monitoring Making-do and Unfinished Work. In: Proc. 21th Ann. Conf. of the Int’l Group for Lean Construction, Fortaleza, Brazil, 2013. Proceedings... Fortaleza, 2013.

HOLMSTRÖM, J.; KETOKIVI, M.; HAMERI, A. P. Bridging Practice and Theory: A Design Science Approach. Decision Science, v. 40, n. 1, p. 65–87, 2009.

KENLEY, R.; SEPPÄNEN, O. Location-based Management for Construction. Planning, Scheduling and Control. Routledge, 2010.

KIM, Y.; BALLARD, G. Earned value method and customer earned value. Journal of Construction Research, v. 3, n. 01, p. 55-66, 2002.

LUCKO, G.; ALVES, T. C. L.; ANGELIM, V. L. Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, v. 32, n. 6, p. 575-594, 2014.

MARCH, S. T.; SMITH, G. F. Design and natural science research on information technology.

Decision Support Systems, v. 15, n. 4, p. 251–266, 1995.

SARHAN, S.; FOX, A. Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Construction Economics and Building, v. 13, n. 1, p. 23-35, 2013.

VARGAS, F. B. Método para planejamento e controle da produção baseado em zonas de trabalho e BIM. Porto Alegre, 2018. 179f. Dissertação (Mestrado em Engenharia Civil) -Programa de Pós-graduação em Engenharia Civil, Universidade Federal do Rio Grande do Sul, Porto Alegre, 2018.

Published

2020-11-04

How to Cite

VARGAS, Fabrício; STERZI, Marcus Pereira; BARTH, Karina Bertotto; FORMOSO, Carlos Torres. FERRAMENTA PARA CONTROLE DA TERMINALIDADE NO PLANEJAMENTO BASEADO EM LOCALIZAÇÃO COM O SUPORTE DE BIM. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 18., 2020. Anais [...]. Porto Alegre: ANTAC, 2020. p. 1–8. DOI: 10.46421/entac.v18i.1182. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1182. Acesso em: 18 jul. 2024.

Issue

Section

(Inativa) Gestão e Economia da Construção

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.