PROPOSTA DE UM PLANO PARA GERENCIAR RISCOS APLICADO AO CRONOGRAMA FÍSICO-FINANCEIRO DE UMA OBRA CORPORATIVA

Authors

  • Wellington Nunes Damasceno Júnior
  • Natalia Carturano
  • Rúbia Bernadete Pereira dos Santos

Keywords:

Management, Physical-financial schedule, Risks

Abstract

The perception about the importance of planning and risk management during the development of a project has been growing gradually in the civil construction. This is because the lack of them can lead to delays in delivery of the construction and increased costs. In view of the foregoing, this article aims to develop a risk management plan applied to the physical-financial schedule of corporate construction work. For this purpose, interviews were carried out with the main part of the project, in order to identify the most relevant risks. These analyses were made and drafted a contingency plan. As a result, a series of measures have been drawn up, aiming at reducing the impact of the uncertainty to the project. Moreover, it was found that, for this construction work with a cost of $689.230,74 and 232 days lead time, it must be considered an increase of approximately 9 and 13% respectively. Different sectors understand the uncertainties in a distinct way. Therefore, a plan to manage risks is a crucial tool in the prevention of occurrence, as well as the mitigation of impacts generated by them.

References

ANDRADE, M. C. A. de. Gerência de Risco: Um Processo Simplificado para PequenasEmpresas de Software. 2007. 61 f. Monografia (Especialização) - Curso de Ciênciada Computação, Departamento de Ciência da Computação, UniversidadeFederal de Lavras, Lavras, 2007.

BARRETO, F. de S. P.; ANDERY, P. R. P. Contribuição à gestão de riscos no processode projeto de incorporadoras de médio porte. Ambiente Construído, Porto Alegre, v.

15, n. 4, p. 71-85, out./dez. 2015. Disponível em:<http://www.scielo.br/scielo.php?pid=S1678-86212015000400071&script=sci_abstract&tlng=pt>. Acesso em: 07 abr. 2017.

CLEMENTS, James; GIDO, Jack. Gestão de Projetos: Tradução da 5a edição norteamericana.

2 ed. São Paulo: Cengage Learning, 2015. 511 p. (Trad.) Effective projectmanagement, 2015.

DEMARCO, T.; LISTER, T. Waltzing with bears: managing risk on software projects. NewYork: Dorset House, 2003.

DOMINGUES, R. M. Uso do FMEA como Ferramenta para Análise de Riscos emProjetos. 2008. 60 f. TCC (Graduação) - Curso de Sistemas de Informação, CentroTecnológico, Universidade Federal de Santa Catarina, Florianópolis, 2008.

MATTOS, Aldo Dórea. Planejamento e Controle de Obras. São Paulo: Pini Ltda, 2010,720 p.

PMI - PROJECT MANAGEMENT INSTITUTE. Um Guia do Conhecimento emGerenciamento de Projetos (PMBOK Guide). 5 ed. Newtown Square, PA USA: ProjectManagement Institute, 2013.

SALLES JUNIOR, C. A. C. et al. Gerenciamento de riscos: em projetos. Rio de Janeiro:Editora FGV, 2006. 160 p. (Gerenciamento de Projetos).

SILVA, T. C. R.; ALENCAR, M. H. Gestão de riscos na indústria da construção civil:proposição de uso integrado de metodologias. 2013.

Published

2018-11-12

How to Cite

DAMASCENO JÚNIOR, Wellington Nunes; CARTURANO, Natalia; SANTOS, Rúbia Bernadete Pereira dos. PROPOSTA DE UM PLANO PARA GERENCIAR RISCOS APLICADO AO CRONOGRAMA FÍSICO-FINANCEIRO DE UMA OBRA CORPORATIVA. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1724–1730. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1523. Acesso em: 18 jul. 2024.

Issue

Section

(Inativa) Gestão e Economia da Construção

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.