DESAFIOS E OPORTUNIDADES PARA A IMPLEMENTAÇÃO DE BIM E CRONOGRAMAS PARA GERENCIAMENTO DE OBRAS

Authors

  • Julianna Crippa
  • Adriana Santos
  • Sergio Scheer
  • Paula Silva

DOI:

https://doi.org/10.46421/entac.v17i1.1768

Keywords:

Building Information Modeling, BIM, Construction Scheduling, Planejamento, Modelagem da Informação na Construção

Abstract

Building Information Modeling (BIM) can be an effective instrument for planning and scheduling. Therefore, this paper aims to determine the current state of the art of BIM integrated with construction planning and control to answer the following question: Based on studies that associate BIM and scheduling tools, which are the barriers/difficulties and opportunities to apply BIM integrated with scheduling for construction management? A methodological approach was adopted in this study through a Systematic Review of Literature (RSL). This method of data collection was selected in order to define the current state of the art of the integration of BIM with planning tools, especially for scheduling. This paper presents evidences of relevant studies on this topic and it opens a discussion about the challenges, limitations and opportunities of this integration. During this research, it was verified that there is an expressive amount of studies about the use of technologies such as virtual reality (VR), radio frequency identification (RFID) and aerial photography in planning and control construction content, thus, as a suggestion for future research, the authors should develop a study aiming to understand better how the integration of these sort of technologies works with BIM.

References

CHEN, S. et al. A framework for an automated and integrated project schedulingand management system. Automation in Construction v. 35, p. 89 110, 2013.

Disponível em:<http://www.sciencedirect.com/science/article/pii/S0926580513000472>.

CIC RESEARCH PROGRAM. BIM Project Execution Planning Guide - Version 2.1.buildingSMART alliance. 2011.

DRESCH, A.; LACERDA, D.P.; ANTUNES, J.A.V. Design science research: A method forscience and technology advancement. 2015. p. 129-158.

EASTMAN, C. M. et al. BIM handbook: A guide to building information modeling forowners, managers, designers, engineers and contractors. 2011.

KIM, H. et al. Generating construction schedules through automatic data extractionusing open BIM (building information modeling) technology. Automation inConstruction v. 35, p. 285 295, 2013.

LACERDA, D. P. et al. Design Science Research: método de pesquisa para aengenharia de produção. Gestão & Produção v. 20, n. 4, p. 741 761, 2013.

LIU, H.; AL-HUSSEIN, M.; LU, M. BIM-based integrated approach for detailedconstruction scheduling under resource constraints. Automation in Construction v. 53,p. 29 43, 2015.

PARK, J.; CAI, H. WBS-based dynamic multi-dimensional BIM database for totalconstruction as-built documentation. Automation in Construction v. 77, p. 15 23,2017.

ROLFSEN, C. N.; MERSCHBROCK, C. Acceptance of Construction SchedulingVisualizations: Bar-charts, Flowline-charts, Or Perhaps BIM? Procedia EngineeringSelected papers from Creative Construction Conference 2016, v. 164, p. 558 566,2016.

SIGALOV, K.; KÖNIG, M. Recognition of process patterns for BIM-based constructionschedules. Advanced Engineering Informatics, 2017.

WANG, K. et al. Applying building information modeling to integrate schedule andcost for establishing construction progress curves. Automation in Construction v. 72,Part 3, p. 397 410, 2016.

WANG, W. et al. Integrating building information models with construction processsimulations for project scheduling support. Automation in Construction v. 37, p. 68 80,2014.

Published

2018-11-12

How to Cite

CRIPPA, Julianna; SANTOS, Adriana; SCHEER, Sergio; SILVA, Paula. DESAFIOS E OPORTUNIDADES PARA A IMPLEMENTAÇÃO DE BIM E CRONOGRAMAS PARA GERENCIAMENTO DE OBRAS. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 3396–3402. DOI: 10.46421/entac.v17i1.1768. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1768. Acesso em: 24 nov. 2024.

Issue

Section

(Inativa) Tecnologia da Informação e Comunicação

Most read articles by the same author(s)

Similar Articles

<< < 3 4 5 6 7 8 9 10 11 12 > >> 

You may also start an advanced similarity search for this article.