Analytical considerations on the flow of production crews and implications for Line of Balance scheduling

Authors

DOI:

https://doi.org/10.46421/entac.v19i1.2033

Keywords:

Linhas de Balanço, Fluxo de equipes de produção, Lean Construction, Planejamento da construção

Abstract

The use of Lines of Balance has been constantly associated to Location Based Planning, it has been known as a useful tool for visually displaying the crews flowing through locations. However, there is a lack of analytical studies about line of balance scheduling and its implications on the workflow of the crews. This study aims to analyse the effect of a group of variables associated to lines of balance scheduling and their impacts on the flow of the work crews. To achieve that, a case study was followed in an iterative sequence to describe the main analytical considerations regarding Lines of Balance and the impacts on the flow of production crews.

References

KENLEY, R.; SEPPANEN, O. Location-based management for construction: Planning, scheduling and control. 1. ed. Abingdon: Spon Press, 2010.

ARDITI, D.; ALBULAK, M. Z. Line‐of‐Balance Scheduling in Pavement Construction. Journal of Construction Engineering and Management, v. 112, n. 3, p. 411–424, 1986.

ARDITI, D.; TOKDEMIR, O. B.; SUH, K. Challenges in Line-of-Balance Scheduling. Journal of Construction Engineering and Management, v. 128, n. 6, p. 545–556, 2002.

LEHTOVAARA, J.; SEPPANEN, O; PELTOKORPI, A.; KUJANSUU, P.; GRONVALL, M. How takt production contributes to construction production flow: a theoretical model. Construction Management and Economics, v. 39, n. 1, 2021.

KEMMER, S.; HEINECK, L. F. M.; ALVES, T. C. L. Using the Line of Balance for Production System Design. Proceedings of the 16th Annual Lean Construction Conference, Manchester, 2008.

MENDES JR., R.; HEINECK, L. F. M. Towards Production Control on Multi-Story Building Construction Sites. 7th Annual Conference of the International Group for Lean Construction. Anais [...] 7TH ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION. Berkeley, California, 1998.

OLIVIERI, H.; GRANJA, A. D. Procedimento de três passos para incorporação de fluxo contínuo em cronogramas de obras. Em: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, v. 12, p. 1–8, 15 2021.

BIOTTO, C. et al. Comparing Production Design Activities and Location-Based Planning Tools. . Em: 25TH ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION. Heraklion, Greece, 2017.

SACKS, R. What constitutes good production flow in construction? Construction Management and Economics, v. 34, n. 9, p. 641–656, 2016.

YANG, I.; IOANNOU, P. G. Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, v. 22, n. 6, p. 619–630, 2004.

POGET, M.; GRANJA, A. Proposta didática para comparação entre métodos de planejamento tradicionais e lean. Anais [...]: SIBRAGEC, VIII SIBRAGEC, 2015, São Carlos. Anais [...] Rio de Janeiro: Ambiente Construído, 2015.

LIMMER, C. V. Planejamento, Orçamentação e Controle de Projetos e Obras. 1 ed. Rio de Janeiro: LTC, 1996.

Published

2022-11-07

How to Cite

MARQUES, Eduardo Mesquita Santos; GRANJA, Ariovaldo Denis. Analytical considerations on the flow of production crews and implications for Line of Balance scheduling. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 19., 2022. Anais [...]. Porto Alegre: ANTAC, 2022. DOI: 10.46421/entac.v19i1.2033. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/2033. Acesso em: 22 jul. 2024.

Issue

Section

(Inativa) Gestão e Economia da Construção

Most read articles by the same author(s)

Similar Articles

<< < 10 11 12 13 14 15 16 17 18 19 > >> 

You may also start an advanced similarity search for this article.