Recommendations for the structural voids provisioning process on the BIM designing

Authors

DOI:

https://doi.org/10.46421/entac.v19i1.2082

Keywords:

Voids provisioning. BIM process. BEP. BIM Coordination.

Abstract

The designing BIM process requires a better organization of information and the tasks flows for the benefits achievement in terms of efficiency, minimizing unexpected situations during the construction phase. In this way, the process of providing voids in the structural elements for the BIM designing process is modelled, defining the tasks and the information flows observing the IFC format and BCF protocols. The task flows presented will allow the designing coordination drives the structural voids provisioning process with organization and efficiency, obtaining an important contribution for the quality of your tasks.

Author Biography

Humberto Farina, IN PREDIAIS

Master in Civil Engineering from the University of São Paulo. Professor at Poli-Integra of the Extension Course Program at the Polytechnic School of the University of São Paulo. Founding partner of IN Predais Consultoria em Engenharia (São Paulo - SP, Brazil).

References

BERTERO, C. O. Orquestras sinfônicas: uma metáfora revisitada. RAE-Revista de Administração de Empresas, vol. 41, n. 3, 2001. Disponível em: http://www.fgv.br/rae/artigos/revista-rae-vol-41-num-3-ano-2001-nid-46011/. Acesso em: 08 de junho de 2022.

BUILDINGSMART. BIM Collaboration Format (BCF) - An Introduction. Disponível em: https://technical.buildingsmart.org/standards/bcf/ Acessado: 08 de junho de 2022.

CAREZZATO, G.G. Protocolo de gerenciamento BIM nas fases de contratação, projeto e obra em empreendimentos civis baseado na ISO 19650. 2018 140, p. Dissertação (mestrado). – Escola Politécnica. Universidade de São Paulo. São Paulo. 2018.

LEE G.e KIM “W” K. Parallel vs. Sequential Cascading MEP Coordination Strategies: A Pharmaceutical Building Case Study. Automation in Construction n 43 170–179. 2014.

MIKALDO, JR. J. e SCHEER, S.; Compatibilização de projetos ou engenharia simultânea: qual é a melhor solução? Gestão & Tecnologia de Projetos, São Paulo, Vol. 3, no 1, p. 79 – 99, maio, 2008.

SUCCAR. B. The Five Components of BIM Performance Measurement. CIB World Congress, Salford, United Kingdom. 2010

THE EUROPEAN FEDERATION OF ENGINEERING CONSULTANCY ASSOCIATIONS (EFCA). BIM and ISO 19650 from a project management perspective. 2019.

UK BIM FRAMEWORK. Information management according to BS EN ISO 19650. Guidance Part D: Developing information requirements. Ed.1.2020.

Published

2022-11-07

How to Cite

FARINA, Humberto. Recommendations for the structural voids provisioning process on the BIM designing. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 19., 2022. Anais [...]. Porto Alegre: ANTAC, 2022. p. 1–15. DOI: 10.46421/entac.v19i1.2082. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/2082. Acesso em: 23 nov. 2024.

Issue

Section

(Inativa) Tecnologia da Informação e Comunicação

Similar Articles

<< < 43 44 45 46 47 48 49 50 51 52 > >> 

You may also start an advanced similarity search for this article.