Stakeholder management in BIM road infrastructure projects: case study of integrated BEP
DOI:
https://doi.org/10.46421/entac.v20i1.6226Keywords:
bim, BIM Execution plan, Infrastructure, Road Concession Projects, stakeholdersAbstract
The In Infrastructure Concession projects, where multiple stakeholders work, management and integration become essential. With the advancement of initiatives to adopt BIM as a collaborative information production ecosystem, such as standardization through NBR ISO 19650, the BIM Execution Plan (BIM Execution Plan - BEP) is applied, with the aim of defining the aspects management of information, technology and processes between those involved. In this context, the objective of the study is the application of stakeholder management through an Integrated BEP and the presentation of the perception of those involved in its preparation. The Integrated BEP is formed by a set of different contractors to develop the contractual obligations that form the concession portfolio. To achieve this objective, an exploratory case study of the CCR RioSP Concessionaire was carried out, through interviews with those involved and the description and analysis of the document. The results indicate that it was possible to demonstrate effectiveness in adopting the Integrated BEP as a contribution to management, integration and communication between stakeholders.
References
SUCCAR, Bilal. Building Information Modelling: conceptual constructs and performance improvement tools. 2013. 396 p. Tese
(Doutorado em Filosofia) - Faculdade de Engenharia e Ambiente Construído, Newcastle, 2013.
NATIONAL Building Information Modeling Standard: Overview, Principles, and Methodologies. 1. ed. [S. l.: s. n.], 2007. 183 p.
Disponível em: https://buildinginformationmanagement.wordpress.com/wp-content/uploads/2011/06/nbimsv1_p1.pdf. Acesso
em: 30 maio 2024.
MCVEA, John F.; FREEMAN, R. Edward. A Stakeholder Approach to Strategic Management. SSRN Electronic Journal, Virginia, 1 jan.
Handbook of Strategic Management, p. 01-33.
GESTÃO DE STAKEHOLDERS EM GESTÃO DE PROJETOS: LEVANTAMENTO BIBLIOMÉTRICO. Produto e Produção, São Paulo, ano
, n. 17, p. 32-45, 9 nov. 2016. Disponível em: https://seer.ufrgs.br/index.php/ProdutoProducao/issue/view/2940. Acesso em: 30
maio 2024.
SACKS, Rafael; EASTMAN, Charles; LEE, Ghang; TEICHOLZ, Paul. BIM Handbook: A Guide to Building Information Modeling for
Owners, Designers, Engineers, Contractors, and Facility Managers. 3. ed. [S. l.]: John Wiley & Sons Inc, 2018. 688 p.
BRASIL. Decreto n. 10.306, de 2 de abril de 2020.Estabelece a utilização do Building Information Modelling na execução direta ou
indireta de obras e serviços de engenharia realizada pelos órgãos e pelas entidades da administração pública federal, no âmbito
da Estratégia Nacional de Disseminação do Building Information Modelling - Estratégia BIM BR, instituída pelo Decreto nº 9.983,
de 22 de agosto de 2019. Disponível em: https://www.planalto.gov.br/ccivil_03/_Ato2019-2022/2020/Decreto/D10306.htm.
ABNT. Associação Brasileira de Normas Técnicas. ABNT NBR ISO 19650-1:2022: Organização da informação acerca de trabalhos da
construção - Gestão da informação usando a modelagem da informação da construção - Parte 1: Conceitos e princípios. Rio de
Janeiro, 2022.
PANAGIOTIDOU, Nicoleta; PITT, Michael; LU, Qiuchen. Building Information Modelling Execution Plans: A global review.
Proceedings of the Institution of Civil Engineers, Smart Infrastructure and Construction, ano 2023, p. 126-147, 30 maio 2024.
Disponível em: https://discovery.ucl.ac.uk/id/eprint/10169378/. Acesso em: 30 maio 2024.
MESSNER, John; ANUMBA, Chimay; DUBLER, Craig; GOODMAN, Shane; KASPRZAK, Colleen; KREIDER, Ralph; LEICHT, Robert;
SALUJA, Chitwan; ZIKIC, Nevena. BIM Project Execution Planning Guide (v 2.2). [S. l.]: Computer Integrated Construction Research
Program, Pennsylvania State University, 2020. Disponível em: https://psu.pb.unizin.org/bimprojectexecutionplanningv2x2/. Acesso
em: 30 maio 2024.
ABU BAKAR, Ahmad Ridzuan Abu; HARON, Ahmad Tarmizi; RAHMAN, Rahimi A. Building Information Modelling Execution Plan ]
(BEP): A Comparison of Global Practice. INTERNATIONAL JOURNAL OF ENGINEERING TECHNOLOGY AND SCIENCES, Malaysia, v. 7,
ed. 2, 1 dez. 2020. Disponível em: https://journal.ump.edu.my/ijets/article/view/6456. Acesso em: 31 maio 2024.
HADZAMAN, Nor Asma Hafizah; TAKIM, Roshana; NAWAWI, Abdul-Hadi; FADHIL , Mohammad. An exploratory study: building
information modelling execution plan (bep) procedure in mega construction projects. Malaysian Construction Research Journal, [s.
l.], v. 18, ed. 1, 2016.
MANENTI, Eloisa Marcon; MARCHIORI, Fernanda Fernandes; CORRÊA, Leonardo de Aguiar. Plano de execução BIM: proposta de
diretrizes para contratantes e fornecedores de projeto. Associação Nacional de Tecnologia do Ambiente Construído., Porto Alegre,
v. 20, n. 1, p. 65-85, jan./mar. 2020.
TELES, Amanda Régia Vieira; LIMA, Mariana Monteiro Xavier de. The development of a BIM Execution Plan for contracting public
work projects. SIGraDi 2022. Critical Appropriations | Universidad Peruana de Ciencias Aplicadas., Fortaleza, 2022.
TESSAROTTO REIS SCHEWINSKY, Daniel. Gestão dos stakeholders em projetos de engenharia no âmbito de concessão rodoviária.
Orientador: Profa. Dra. Cláudia Terezinha Kniess. 2022. 136 f. Dissertação apresentada ao Programa de Pós-Graduação
(Engenharia Civil – Mestrado) - Universidade São Judas Tadeu, São Paulo, 2022.
POLITO, G. Gerenciamento integrado de projetos na construção: Design, projeto e produção. Rio de Janeiro, 2022.
ABCR. Associação Brasileira de Concessionárias de Rodovias. ABCR. 2021. Disponível em: <https://abcr.org.br/>. Acesso em: 31
mai. 2024.
BARISON, Maria Bernardete; SANTOS, Eduardo Toledo. An overview of BIM specialists. Proceedings of the International
Conference on Computing in Civil and Building Engineering, Londrina/São Paulo, 2010.
YAZICIOGLU, Z. Multi-stakeholder involvement in construction and challenges of BIM implementation. ECPPM 2021 – eWork and
eBusiness in Architecture, Engineering and Construction – Semenov & Scherer, Istanbul, 2021.
GIL, Antonio Carlos. Como elaborar projetos de pesquisa. 4ª. ed. São Paulo: Atlas S.A., 2002. 176 p.
LOPES, Leonardo; MAÑAS, Antonio Vico. ATRASOS EM PROJETOS DE TI CAUSADOS POR FALHAS NA GESTÃO DOS STAKEHOLDERS.
Future Studies Research Journal, São Paulo, v. 5, n. 2, p. 155-186, 8 out. 2013.
BRYMAN, A.; BELL, E. Business research methods. Oxford University Press, New York, 2003.
MELO, Sâmara Machado Cabral; RUSCHEL, Regina Coeli. Análise crítica de cronograma de projeto de concessão rodoviária com
base em BIM. Simpósio brasileiro de tecnologia da informação e comunicação na construção, Campinas, 2023.
ANTT - AGÊNCIA NACIONAL DE TRANSPORTE TERRESTRE. PER Programa de Exploração da Rodovia, de 2021. Disponível em:
do-contrato/per.pdf/view. Acesso em: 31 mai. 2024.