Análise da produtividade na adequação das instalações do sistema de combate a incêndio

Authors

DOI:

https://doi.org/10.46421/sibragec.v11i00.45

Keywords:

Sistema de Segurança e Proteção Contra o Incêndio, Ração Unitário de Produtividade, Produção

Abstract

The Military Firefighters Corps of Bahia in 2015 established the Technical Instruction n°43 which regulates standards and measures of security against fire and panic in buildings, structures and risk areas. According to this Technical Instruction is mandatory to build, adapt and reform buildings according to the legal requirements of the Decree Law of 16.302/2015. Due to the fact that is a new regulation, there are a few studies that have focused on studying the adequacy of the Fire Protection Systems in the existing buildings. Hence, this paper aims to identify performance indicators for the execution of services of adaptation of Fire Safety and Protection System of existing buildings. For that, a Case Study was performed in a shopping center in the city of Salvador, Bahia. The present study comprised four stages: (a) selection of the building and the processes to be studied; (b) data collection; (c) productivity analysis; (d) and identification of events that affected workforce productivity. The main practical contribution of this work is the presentation of workforce productivity metrics, which can be used by construction companies as a tool for planning future construction projects. Moreover, events that generated low productivity during the study are presented and classified according its causes.

Downloads

Download data is not yet available.

Published

2021-03-18

How to Cite

PÉREZ, Cristina Toca; CHENG, Lucas Yui Thi Fernandes da Cunha. Análise da produtividade na adequação das instalações do sistema de combate a incêndio. In: SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO, 11., 2019. Anais [...]. Porto Alegre: ANTAC, 2019. p. 1–8. DOI: 10.46421/sibragec.v11i00.45. Disponível em: https://eventos.antac.org.br/index.php/sibragec/article/view/45. Acesso em: 24 nov. 2024.

Issue

Section

Gestão de Processos Construtivos e Melhoria da Produtividade

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.