RELAÇÕES DE DEPENDÊNCIA ENTRE OS FLUXOS DE TRABALHO, MATERIAIS E EQUIPAMENTOS NO CANTEIRO DE OBRAS DE EDIFÍCIOS ALTOS

Autores

  • Wanessa Fazinga
  • Vinicius Jordão Pescuma
  • Fernanda Aranha Saffaro

DOI:

https://doi.org/10.46421/entac.v17i1.1509

Palavras-chave:

workflow, input flow, production flow

Resumo

One of the management challenges in construction is to maintain the continuity of the production flow under the process and operations perspectives. There are difficulties in keeping in sync between labor flows, referring to the performance of the labor resource, and the input flows, feed of materials and equipment. This article aims to describe the relationships of interdependence between these flows. The empirical investigation was conducted through a study case carried out in the execution of the reinforced concrete structure of a multi-storey building. The results have indicated that the flow of inputs can occur disconnected from the workflow, resulting in loss of capacity or production interruptions. The need to improve the means of communication among workers involved in the production proved to be essential to allow the flow of inputs and the continuity of the workflow.

Referências

ARBULU, R.; KOERCKEL, A.; ESPANA, F. 'Linking Production-Level Workflow WithMaterials Supply. In: Annual Conference of the International Group for LeanConstruction, 13., 2005, Sydney. Anais eletrônicos... Sydney: 2005. Disponível em:http://iglc.net/Papers/Conference/13. Acesso em: 22 mar. 2018.

BALLARD, G.; TOMMELEIN, I.; KOSKELA, L.; HOWELL, G. Lean Construction tools andtechniques. In: Design and Construction: Building in Value. Oxford-England-UK: 2002,p 227-255.

BERTELSEN, S.; HENRICH, G.; KOSKELA, L.; ROOKE, J. Construction Physics. In: AnnualConference of the International Group for Lean Construction, 15., 2007, East Lansing,Michigan. Anais eletrônicos... East Lansing: 2007. Disponível em:http://iglc.net/Papers/Conference/15. Acesso em: 22 mar. 2018.

BRODETSKAIA, I.; SACKS, R. Understanding Flow and Micro-Variability in Construction:Theory and Practice. In: Annual Conference of the International Group for LeanConstruction, 15., 2007, East Lansing, Michigan. Anais eletrônicos... East Lansing:2007. Disponível em: http://iglc.net/Papers/Conference/17. Acesso em: 22 mar. 2018.

ISATTO, E.L.; ZUCHETTI, M. Aplicação do mecanismo da função produção aoplanejamento da produção seriada na construção. In: ENCONTRO NACIONAL DETECNOLOGIA DO AMBIENTE CONSTRUÍDO, 15., 2014, Fortaleza. Anais... Fortaleza:ANTAC, 2014.

KHALFAN, M.; McDERMOTT, P.; OYEGOKE, A.; DICKINSON, M.; LI, X.; NEILSON, D.

Application of Kanban in the UK Construction Industry by Public Sector Clients. In:Annual Conference of the International Group for Lean Construction, 16., 2008,Manchester. Anais eletrônicos... Manchester: 2007. Disponível em:http://iglc.net/Papers/Conference/16. Acesso em: 22 mar. 2018.

KOSKELA, L. An exploration towards a production theory and its application toconstruction. 2000. 298 p. Tese (Doctor of Philosophy) - VTTTechnicalResearch Centre of Finland. Helsinki University of Technology, Espoo, 2000.

MOURA.S.L.M.; HEINECK, L. F. M. Linha de balanço: síntese dos princípios deprodução enxuta aplicados à programação de obras? In: ENCONTRO NACIONALDE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 15., 2014, Fortaleza. Anais... Fortaleza:ANTAC, 2014.

SHINGO, S. O sistema Toyota de produção do ponto de vista da engenharia deprodução. 2ed. Porto Alegre: Bookman, 1996.

THOMAS, R.; RILEY, D.; MESSNER, J. Fundamental Principles of Site MaterialManagement. Journal of Construction Engineering and Management, v.131, n.7, p.808-815, 2005.

TSAO, C.C.; LIDELOW, H. Development of a Materials Management Strategy toEnable Continuous Work Flow on-Site. In: Annual Conference of the InternationalGroup for Lean Construction, 25., 2017, Heraklion. Anais eletrônicos... Heraklion: 2017.

Disponível em: http://iglc.net/Papers/Conference/25. Acesso em: 22 mar. 2018.

Downloads

Publicado

2018-11-12

Como Citar

FAZINGA, Wanessa; PESCUMA, Vinicius Jordão; SAFFARO, Fernanda Aranha. RELAÇÕES DE DEPENDÊNCIA ENTRE OS FLUXOS DE TRABALHO, MATERIAIS E EQUIPAMENTOS NO CANTEIRO DE OBRAS DE EDIFÍCIOS ALTOS. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 1609–1615. DOI: 10.46421/entac.v17i1.1509. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1509. Acesso em: 23 dez. 2024.

Edição

Seção

(Inativa) Gestão e Economia da Construção

Artigos Semelhantes

<< < 11 12 13 14 15 16 17 18 19 20 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.