AUDITORIA DE MODELOS BIM 4D EM CANTEIROS DE OBRAS DE CONSTRUTORAS DA CIDADE DE FORTALEZA-CE

Autores

  • Paulo Henrique Gomes da Rocha
  • Raymundo Robson Gomes da Silva
  • Washington Bastos da Silva Filho
  • José Barros Neto
  • Mibson Michel Santiago Ramos

DOI:

https://doi.org/10.46421/entac.v17i1.1729

Palavras-chave:

Layout, BIM, Physical arrangement

Resumo

In the construction of daily life, the project term is usually used to refer to a set of drawings and technical details in the various disciplines of engineering and serving north to the materialization of the building. However it is more than that, representing period defined in time and whose uniqueness and particularities differentiate it from any other, making it unique. In order to reduce interference and improve the activities at construction sites, BIM tools in 4D models are integrated into the sites, but it is necessary to observe whether this use is actually bringing productive advantages or is only a marketing tool. In this work, the process of planning and implementation of 4D models in construction sites of three companies in the field of construction and development of Fortaleza / CE has been audited and proposals have been made for improvement. An interview guide was prepared and submitted for production managers of their respective companies. After analyzing the responses, it was found the gaps between recommended in the literature and practiced in the company. Finally, improvements have been proposed in order to fill such gaps, which were mainly in training of manpower.

Referências

ANDAYESH, Mohsen; SADEGHPOUR, Farnaz. Dynamic site layout planning throughminimization of total potential energy. Automation in Construction, v. 31, p. 92-102,2013.

BIOTTO, C. N. Método de Gestão da Produção na Construção Civil com Uso daModelagem BIM 4D. 2012. 180f.. Dissertação (Mestrado em Engenharia Civil) - Escolade Engenharia, Universidade Federal do Rio Grande do Sul, Porto Alegre, 2012.

HARDIN, Brad. Bim and construction management: proven tools, methods, andworkflows. Indianapolis: Wiley, 2009.

HAYMAKER, John; FISCHER, Martin. Challenges and Beefits of 4D Modeling on theWalt Disney Concert Hall Project. CIFE Center for Integrated Facility Engineering,Stanford University, 2001.

LEITE, Fernanda et al. Analysis of modeling effort and impact of different levels ofdetail in building information models. Automation in Construction, v. 20, n. 5, p. 601-609, 2011.

SACKS, Rafael et al. Interation os lean and building information modeling inconstruction. Journal of construction engineering and management, v. 136, n. 9, p.968-980, 2010.

Sulankivi, K., Kähkönen, K., Mäkelä, T., & Kiviniemi, M. (2010). 4D -BIM for constructionsafety planning. In: CIB WORLD BUILDING CONGRESS, 18., 2010, Salford.

Proceedings Salford: CIB W099, 2010. p. 117-128. Disponível em:<http://www.irbnet.de/daten/iconda/CIB_DC24339.pdf >, Acesso em: 17.07.2018.

TOMMELEIN, Iris D. Acknowledging variability and uncertainty in product and processdevelopment. Netherlands: Swets & Zeitlinger, Lisse, 2003.

WANG, Wei-Chih et al. Integrating building information models with constructionprocess simulations for project scheduling support. Automation in Construction, v. 37,p. 68-80, 2014.

Downloads

Publicado

2018-11-12

Como Citar

ROCHA, Paulo Henrique Gomes da; SILVA, Raymundo Robson Gomes da; SILVA FILHO, Washington Bastos da; BARROS NETO, José; RAMOS, Mibson Michel Santiago. AUDITORIA DE MODELOS BIM 4D EM CANTEIROS DE OBRAS DE CONSTRUTORAS DA CIDADE DE FORTALEZA-CE. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 17., 2018. Anais [...]. Porto Alegre: ANTAC, 2018. p. 3094–3099. DOI: 10.46421/entac.v17i1.1729. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/1729. Acesso em: 22 dez. 2024.

Edição

Seção

(Inativa) Tecnologia da Informação e Comunicação

Artigos mais lidos pelo mesmo(s) autor(es)

Artigos Semelhantes

<< < 9 10 11 12 13 14 15 16 17 18 > >> 

Você também pode iniciar uma pesquisa avançada por similaridade para este artigo.