APLICAÇÃO DA GESTÃO DE RESTRIÇÕES COM USO DE TECNOLOGIA E MELHORIA CONTÍNUA EM UMA CONSTRUTORA
DOI:
https://doi.org/10.46421/entac.v18i.1060Keywords:
Medium-term planning, Constraints, Continuous improvement, TechnologyAbstract
Based on the principles of Lean philosophy and Production Planning and Control, a case study was developed in a medium-sized construction company in Florianópolis, whose objective was to analyze the application of constraints management in medium-term planning with use of innovative technologies and continuous improvement concepts. Initially, the implementation of the planning concepts already used by the construction company was analyzed. It became evident the need of controlling constraints to protect production, reduce variability and guarantee production stability. However, after applying some cycles of the procedure, it was also observed that it was necessary to use tools that would allow greater involvement of the teams and that would promote greater clarity and productivity in the management of constraints. Therefore, innovative technological tools and agile methodologies were used to obtain the visual management of the process, increasing the company's communication, facilitating decision making and, in a second moment, automatically linking this vision to the planning. It was concluded that the applied process meant that the principles of Lean Construction in medium-term planning was improved, generating positive results of productive stability, respected deadlines, increasing productivity and communication.
References
AKARRI, M.P.A. Interligação entre o planejamento de longo, médio e curto prazo com o usodo pacote computacional MSPROJECT. Dissertação (Mestre em Educação). UniversidadeFederal do Rio Grande do Sul. Porto Alegre, 2003.
ASSUMPÇÃO, J.F.P. Gerenciamento de empreendimentos na construção civil: modelo paraplanejamento estratégico da produção de edifícios. São Paulo: Escola Politécnica daUniversidade de São Paulo, 1996.
BALLARD, H. G. The Last Planner System of Production Control. School of Civil Engineering,Faculty of Engineering, The University of Birmingham, 2000.
BALLARD, H. G.; TOMMELEIN, I. Current Process Benchmark for the Last Planner System.
University of California, Berkeley. 2016.
BERNARDES, M. M. S. FORMOSO, C. T. Diretrizes para a avaliação de sistema deplanejamento e controle da produção de micro e pequenas empresas de construção. IXEncontro Nacional de Tecnologia do Ambiente Construído Foz do Iguaçu – Paraná. 2002.
COELHO, H. O.; FORMOSO, C. T. Planejamento e controle da produção em nível de médioprazo: funções básicas e diretrizes de implementação. In: SIMPÓSIO BRASILEIRO DE GESTÃO EECONOMIA DA CONSTRUÇÃO, III, 2003, São Carlos, SP. Anais... São Carlos, 2003.
FORMOSO, C. T. Lean Construction: princípios básicos e exemplos. Construção Mercado:custos, suprimentos, planejamento e controle de obras. Porto Alegre, 2002.
KOSKELA, L. Application of the New Production Philosophy to Construction. Technical Reportn.72. Center of Integrated Facility Engineering, Department of Civil Engineering, StanfordUniversity, 1992.
SALEM, O.; SOLOMON, J.; GENAIDY, A.; MINKARAH, I. Lean Construction: From Theory toImplementation. JOURNAL OF MANAGEMENT IN ENGINEERING. American Society of CivilEngineers. Estados Unidos. 2006.
SANTOS, D. G.; HEINECK, L. F. M. Atividades de produção que permitem a continuidade dosserviços de produção durante o processo construtivo de edificações: caracterização. ICONFERÊNCIA LATINO-AMERICANA DE CONSTRUÇÃO SUSTENTÁVEL / X ENCONTRONACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO,São Paulo, SP. 2004.