ANÁLISE DE MANIFESTAÇÕES PATOLÓGICAS DE PÓS-OBRA EM FUNÇÃO DE SISTEMAS CONSTRUTIVOS DE EMPREENDIMENTOS IMOBILIÁRIOS
DOI:
https://doi.org/10.46421/entac.v17i1.1496Keywords:
Service and maintenance requests, Technical assistance, Knowledge management, Building pathologyAbstract
The strong growth in the housing market since 2008 has led companies to absorb labor without appropriate qualification. At the same time, the increase of the production pace to contractual compliance has invariably caused the loss of quality services. Among other effects, growing complaints from customers about perceived quality has occurred. The research aim was to analyze and organize the database of customers and end users recorded service and maintenance requests, specifically those related to pathological manifestations. The research also sought to classify the pathologies according to the employed building system, as well as to provide feedback to the design and engineering teams. A case study was carried out in a national real estate developer and data was collected from January 2014 to July 2017 for further processing and statistical analysis. The results suggest there is little divergencies in the top five pathologies found, despite regional variations in relation to the building systems used. The feedback of information to the design and engineering teams related may support preventive actions in relation to new pathological occurrences and strengthen quality delivery for customers and end users.
References
AMORIM, S.V. Metodologia para estruturação de Sistemas de Informação paraprojeto dos Sistemas Hidráulicos Prediais. São Paulo, 1997. 213 p. (Tese deDoutorado) Escola Politécnica, Departamento de Engenharia da Construção Civil,Universidade de São PauloBRASIL. Governo do Brasil. Assuntos. Infraestrutura. Disponível emhttp://www.brasil.gov.br/editoria/infraestrutura/2016/03/em-sete-anos-minha-casaminha-vida-entrega-mais-de-1-000-casas-por-dia . Acesso em 24 jun. 2018CRUZ, Daniel Cupertino da et al. Análise de solicitações de assistência técnica emempreendimentos residenciais como ferramenta de gestão. 2013.
FANTINATTI, Pedro Augusto Pinheiro et al. Ações de gestão do conhecimento naconstrução civil: evidências a partir da assistência técnica de uma construtora.2008.
FREITAS, V. P. A State-of-the-Art Report on Building Pathology. 2013. (CIB)GARCIA, C. C.; LIBORIO, J. B. L. A incidência de patologias geradas pela falta decontrole e de qualidade dos canteiros de obras. In: CONGRESSO LATINO-AMERICANO TECNOLOGIA E GESTÃO NA PRODUÇÃO DE EDIFÍCIOS SOLUÇÕESPARA O TERCEIRO MILÊNIO. Escola Politécnica da Universidade de São Paulo, SãoPaulo, 03-06 nov. 1998. Anais... Departamento de Engenharia de Construção CivilPCC USP, 1998, p. 425-432.
INTERNATIONAL COUNCIL FOR RESEARCH AND INNOVATION IN BUILDING ANDCONSTRUCTION (CIB). CIB Working Commission W86 Building Pathology. Beukel, A.
van den (Coord.). Building Pathology a state-of-the-art report. CIB Report,Publication 155. Delft, june 1993. 76 p.
LICHTENSTEIN, Norberto B. Patologia das construções. Boletim técnico, v. 6, p. 86,1986.
MARTINS, M. S.; HERNANDES, A. T.; AMORIM, S. V. Ferramentas para melhoria doprocesso de execução dos sistemas hidráulicos prediais. SIMPÓSIO BRASILEIRO DEGESTÃO E ECONOMIA DA CONSTRUÇÃO, v. 7, 2003.
DA SILVA, Cláudia Flaviana Cavalcante; DE SOUSA, Rúbia Valéria Rodriguês;MONTEIRO, Eliana Cristina Barreto. Análise das patologias de uma edificação dacidade do Recife Estudo de caso. 2008.
ROCHA, Ana Paula. Qualidade em risco Construção Mercado 17. Disponível emhttp://construcaomercado17.pini.com.br/negocios-incorporacaoconstrucao/130/artigo283997-1.aspx . Acesso em 23 junho 2018.
SINDUSCON. SindusCon-SP: Construção inicia 2017 com nova queda no emprego.
Disponível em: https://www.sindusconsp.com.br/sinduscon-sp-construcao-inicia-2017-com-nova-queda-no-emprego/ . Acesso em 23 junho 2018.
TAGUE, Nancy R. et al. The quality toolbox. Milwaukee: ASQ Quality Press, 2005.
YIN, R. K. Case Study Research: design and methods. Beverly Hills: Sage, 2013.