Rework and reduction of profit in work of housing of social interest
DOI:
https://doi.org/10.46421/entac.v19i1.2210Keywords:
Retrabalhos, custos da Qualidade, desvios de custos, lucro do empreendedorAbstract
This research aims to determine the percentage incidence of rework costs in relation to the estimated profit of housing built in a condominium of social interest. The research strategy was the case study, carried out in a construction site, whose constructive system used reinforced concrete walls on raft-type foundations. The results showed that losses related to rework can represent up to 10.0% of the estimated profit for the housing models, bringing losses to the construction company. The raft-type foundations and concrete walls were the services that presented the most reworks, making it difficult to follow the successor activities.
References
ALMEIDA, E. L. G.; FEITOZA, V. A. DA S.; CARVALHO, M. T. M.; PIÑA, A. B. S.; ARAÚJO, L. G.; AIDAR, A. G. Estudo de atrasos em obras: o ponto de vista do gerenciamento de empresas privadas em Brasília, Brasil. Gestão & Produção. 2019.
CARDOSO, R, S. Orçamento de obras em foco um novo olhar sobre a engenharia de custos. 3.ª Edição. Pini. São Paulo, 2014. 481p.
DA SILVA, M, B. Manual de BDI, como incluir benefícios e despesas indiretas em orçamentos de obras de construção civil. São Paulo. Blucher. 2006. 200p.
FIREMANN, M, C, T. Proposta de método de controle integrado entre produção e qualidade com mensuração de perdas por making-do e pacotes informais. Dissertação apresentada ao Programa de Pós-Graduação em Engenharia Civil da Universidade Federal do Rio Grande do Sul. Porto Alegre/RS. 2012.
KOSKELA, L, J. An exploration towards a production theory and its application to construction. Dissertation for the degree of Doctor of Technology to be presented with due permission for public examination and debate in Luna Auditorium in Spektri Duo at Helsinki University of Technology. 299P. 2000.
KOSKELA, L. Making-Do the Eighth Category of Waste, In: ANNUAL CONFEENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 12., Elsinore, 2004, Proceedings… Elsinore, 2004.
LOVE, P, E, D; LI, H. Quantifying the causes and costs of rework in construction. Construction Management & Economics. Nr 18, P. 479-490, 2000.
MULLER, A, L; SAFFARO, F, A. A prototipagem virtual para o detalhamento de projetos na construção civil. Ambiente Construído, Porto Alegre, v. 11, n. 1, p. 105-121, jan./mar. 2011.
SANTOS, P, R, R; SANTOS, D, DE G. Investigação de perdas devido ao trabalho inacabado e o seu impacto no tempo de ciclo dos processos de construtivos. Revista Ambiente Construído, Porto Alegre, v. 17, n. 2, p. 39-52, abr./jun. 2017.
THOMAZ, E. Tecnologia, gerenciamento e qualidade na construção. São Paulo. Pini. 2001.
TISAKA, M. Da teoria à prática no cálculo do BDI Benefícios e Despesas indiretas. Blucher. São Paulo/SP, (2021). 564p.
YIN, R. K. Estudo de caso: planejamento e métodos. Tradução: Cristhian Matheus Herrera. 5. ed. Porto Alegre/RS: Bookman, 2015.