Analyzing the effectiveness of production management using short-term control indicators

Authors

DOI:

https://doi.org/10.46421/entac.v20i1.5734

Keywords:

Production Management, Construction planning, Production control, Last Planner System, Short-term planning, Short-term indicators

Abstract

This article aims to analyze the deficiencies of the management process based on the use of short-term performance indicators from the perspective of the Last Planner System. Initially, a literature review will be presented that addresses the fundamentals of Production Planning and Control. Then, the research method will consist of evaluating the structuring of planning and the effects caused by short-term planning. In this context, it is expected to contribute to production management by evaluating some considerations made during the development of the master plan, which influence various indicators, thus avoiding inconsistent conclusions about construction delays, financial losses, and lack of quality. In other words, even with the dissemination of the service packaging technique (according to Lean Construction precepts), the executive process adopted by the construction team must be taken into account to avoid groupings that impact the PPC (Percentage of Packages Completed), for example. Finally, actions related to the reprogramming process (such as "breaking" packages) will be presented to define more realistic and controllable goals.

This article aims to analyze the deficiencies of the management process based on the use of short-term performance indicators from the perspective of the Last Planner System. Initially, a literature review will be presented that addresses the fundamentals of Production Planning and Control. Then, the research method will consist of evaluating the structuring of planning and the effects caused by short-term planning. In this context, it is expected to contribute to production management by evaluating some considerations made during the development of the master plan, which influence various indicators, thus avoiding inconsistent conclusions about construction delays, financial losses, and lack of quality. In other words, even with the dissemination of the service packaging technique (according to Lean Construction precepts), the executive process adopted by the construction team must be taken into account to avoid groupings that impact the PPC (Percentage of Packages Completed), for example. Finally, actions related to the reprogramming process (such as "breaking" packages) will be presented to define more realistic and controllable goals.

Author Biographies

José Edmar Sampaio Batista Filho, Universidade Federal do Ceará

Bacharelado em Engenharia Civil pela Universidade Federal do Ceará (Fortaleza - CE, Brasil).

José de Paula Barros Neto, Universidade Federal do Ceará

Doutorado em Administração pela Universidade Federal do Rio Grande do Sul.

Professor Titular da Universidade Federal do Ceará (Fortaleza - CE, Brasil).

References

FORMOSO, C. T.; BERNARDES, M.; OLIVEIRA, L.; OLIVEIRA, K. Termo de Referência para o Planejamento e Controle da Produção em

Empresas Construtoras. Porto Alegre: Universidade Federal do Rio Grande do Sul, 1999.

FORMOSO, C. T. Planejamento e controle da produção em empresas de construção. Porto Alegre: Universidade Federal do Rio

Grande do Sul, 2001.

LAUFER, A.; TUCKER, R. L. Is Construction Planning Really Doing its Job? A Critical Examination of Focus, Role and Process.

Construction Management and Economics, v. 5, n. 3, p. 243-266, 1987. DOI: https://doi.org/10.1080/01446198700000023

HEINECK, L. F. Introdução à line of balance (LoB). 2004. Disponível em: http://www.cesec.ufpr.br/~mendesjr/lob/introd.htm.

Acesso em: 11 maio 2024.

BALLARD, G.; HOWELL, G. Shielding Production: Essential Step in Production Control. Journal of Construction Engineering and

Management, v. 11, n. 1, p. 11–17, 1997. DOI: https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(11)

BALLARD, H. G. Look ahead planning, the missing link to production control. In: Annual Conference of the International Group for

Lean Construction. Proceedings [...] Gold Coast: IGLC, 1997.

BALLARD, H. G. The Last Planner System of production control. 2000. 193 f. Tese (Doutorado em Engenharia Civil) - School of Civil

Engineering, Faculty of Engineering, University of Birmingham, Birmingham, 2000.

BALLARD, G.; TOMMELEIN, I. Current process benchmark for the Last Planner System. University of California, Berkeley, p. 125,

ABBASIAN-HOSSEINI, S. A.; NIKAKHTAR, A.; GHODDOUSI, P. Verificação dos benefícios da construção enxuta por meio de

modelagem de simulação: um estudo de caso do processo de assentamento de tijolos. KSCE Journal of Civil Engineering, v. 18,

n..5, p. 1248-1250, 2014. DOI: https://doi.org/10.1007/s12205-014-0305-9

ALVES, T.; TOMMELEIN, I. D. Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of

HVAC Ductwork. University of California, Berkeley, 2004.

CARVALHO, C. V. de; LOPES, M. P.; RAMOS, A. G. Lean Games Approaches – Simulation Games and Digital Serious Games.

International Journal of Advanced Corporate Learning (iJAC), v. 7, n. 1, p. 14, 2014. DOI: https://doi.org/10.3991/ijac.v7i1.3433

RYBKOWSKI, Z. K.; WONG, J. M.; BALLARD, G.; TOMMELEIN, I. D.; ASSOCIATE, A. Using controlled experiments to calibrate

computer models: the Airplane Game as a Lean simulation exercise. Proceedings [...] Manchester: IGLC, 2008.

GADRE, A.; CUDNEY, E.; CORNS, S. Model development of a virtual learning environment to enhance Lean education. Procedia

Computer Science, v. 6, p. 100, 2011. DOI: https://doi.org/10.1016/j.procs.2011.08.020

HEYL, J. von. Lean simulation in road construction: teaching of basic Lean principals. Proceedings [...] Perth: IGLC, 2015.

SHANNON, P. W.; KRUMWIEDE, K. R.; STREET, J. N. Using simulation to explore Lean manufacturing implementation strategies.

Journal of Management Education, v. 34, n. 2, p. 287, 290, 2010. DOI: https://doi.org/10.1177/1052562909358964

GÖRKE, M; BELLMANN, J.; BUSCH, J.; NYHUIS, P. Employee qualification by digital learning games. Procedia Manufacturing, v. 9, p.

-235, 2017. DOI: https://doi.org/10.1016/j.procs.2011.08.020

KURIGER, G. W. A webbased Lean simulation game for office operations: training the other side of a Lean enterprise. Simulation &

Gaming, v. 41, n. 4, p. 488-489, 500-503, 2010. DOI: https://doi.org/10.1177/1046878109334945

AKKARI, A. M. P. Interligação entre o planejamento de longo, médio e curto prazo com o uso do pacote computacional

MSPROJECT. 2003. 145 f. Dissertação (Mestrado) - Programa de Pós-Graduação em Engenharia Civil, Escola de Engenharia,

Universidade Federal do Rio Grande do Sul, Porto Alegre, 2003.

Published

2024-10-07

How to Cite

BATISTA FILHO, José Edmar Sampaio; BARROS NETO, José de Paula. Analyzing the effectiveness of production management using short-term control indicators. In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 20., 2024. Anais [...]. Porto Alegre: ANTAC, 2024. p. 1–13. DOI: 10.46421/entac.v20i1.5734. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/5734. Acesso em: 23 nov. 2024.

Most read articles by the same author(s)

1 2 > >> 

Similar Articles

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.