Improvements included in the design of the industrialized construction production system

a case study

Authors

DOI:

https://doi.org/10.46421/entac.v20i1.6015

Keywords:

Planning and control, Industrialized Construction, Production System Project, . Line of balance

Abstract

The industrialization of construction brings numerous advantages to the production process; However, it requires efficient management of production systems. The Production System Project (PSP) is the first product management activity that aims to reduce the effects of variability and uncertainties on production systems. This study aims to analyze, evaluate, and propose improvements to the PSP of an enterprise that has the characteristic of industrialized construction. This case study has a fishing methodology to analyze the test product system. It was identified that the work's PSP required studies on the workflows of the base production unit. In this way, the line of balance (LOB) technique was used, through which it was possible to propose an uninterrupted production flow of the work teams and a 70% reduction in work in progress. It can be concluded that a well-structured PSP allows the construction of planning scenarios and the subsidized choice of the best alternative for executing a project, considering its resource limitations, the existing bottlenecks in the production process and the deadline for completing the work.

Author Biographies

Maria Danielle Leão de Oliveira, Universidade Federal de São Carlos

Mestrado em Engenharia Civil pela Universidade Federal de São Carlos (São Carlos - SP).

Sheyla Mara Baptista Serra, Universidade Federal de São Carlos

Doutorado pela Universidade de São Paulo (USP). Docente Titular da Universidade Federal de São Carlos (UFSCar).

Clarissa Notariano Biotto, Universidade Federal do Ceará

Doutorado em Architecture and the Built Environment pela University Of Huddersfield, Inglaterra(2019)
Professor de Magistério Superior da Universidade Federal do Ceará , Brasil

Iany Andrade dos Santos, Universidade Federal de São Carlos

Mestranda em Engenharia Civil pela Universidade Federal de São Carlos (São Carlos - SP).

References

KOSKELA, L. Application of the new production philosophy to construction. Stanford: Stanford University, v. 72, 1992. 81 p.

Disponível em: https://stacks.stanford.edu/file/druid:kh328xt3298/TR072.pdf. Acesso em: 01 out. 2022.

LESSING, J.; STEHN, L. Industrialised house building - concept and processes. Licentiate Thesis - Division of Design Methodology,

Lund University, Sweden, 2006.

SACKS, R.; KOSKELA, L.; BHARGAV, D.; OWEN, R. Interaction of lean and building information modeling in construction. Journal of

Construction Engineering and Management, v. 136, n. 9, p. 968-980, 2010. DOI: 10.1061/(ASCE)CO.1943-7862.0000203.

MEREDITH, J. R.; SHAFER, S. M. Administração da produção para MBAs. Porto Alegre: Bookman, 2002. 391 p.

GAITHER, N.; FRAZIER, G. Administração da produção e operações. 8. ed. São Paulo: Pioneira Thomson Learning, 2001.

SCHRAMM, F. K. O projeto do sistema de produção na gestão de empreendimentos habitacionais de interesse social. 2004. 182 p.

Dissertação (Mestrado em Engenharia Civil) – Escola de Engenharia, Programa de Pós-Graduação em Engenharia Civil –

Universidade Federal do Rio Grande do Sul, Porto Alegre, 2004.

BIOTTO, C. N. Método para projeto e planejamento de sistemas de produção na construção civil com uso de modelagem BIM 4D.

180 p. Dissertação (Mestrado em Gestão e Economia da Construção) - Universidade Federal do Rio Grande do Sul, Porto

Alegre, 2012.

BIOTTO, C. N.; KAGIOGLOU, M; KOSKELA, L. e TZORTZOPOULOS, P. “Comparing production design activities and location-based

planning tools.” In: Annual Conference of the International Group for Lean Construction, 25, Heraklion, 2017. Proceedings...

Heraklion, 2017. DOI: 10.24928/2017/0176.

SCHRAMM, F. K. Projeto de sistemas de produção na construção civil utilizando simulação computacional como ferramenta de

apoio à tomada de decisão. 2009. 299 p. Tese (Doutorado em Engenharia) - Universidade Federal do Rio Grande do Sul, Porto

Alegre, Rio Grande do Sul, 2009.

GIL, A. C. Como elaborar projetos de pesquisa. São Paulo: Atlas, 1996.

Published

2024-10-07

How to Cite

OLIVEIRA, Maria Danielle Leão de; SERRA, Sheyla Mara Baptista; BIOTTO, Clarissa Notariano; SANTOS, Iany Andrade dos. Improvements included in the design of the industrialized construction production system : a case study . In: NATIONAL MEETING OF BUILT ENVIRONMENT TECHNOLOGY, 20., 2024. Anais [...]. Porto Alegre: ANTAC, 2024. p. 1–13. DOI: 10.46421/entac.v20i1.6015. Disponível em: https://eventos.antac.org.br/index.php/entac/article/view/6015. Acesso em: 23 nov. 2024.

Similar Articles

<< < 3 4 5 6 7 8 9 10 11 12 > >> 

You may also start an advanced similarity search for this article.