THE CAD DESIGN PROCESS TRANSITION TO BIM IMPLEMENTATION IN A CONSTRUCTION COMPANY
DOI:
https://doi.org/10.29327/sbqp2021.437984Keywords:
Project Management, Implementation, Design Process, BIMAbstract
BIM is considered a disruptive method for design coordination because it requires stakeholders to acquire new skills and develop new capabilities. Researches point out that many companies fail in the process’ transition due to a lack of strategy upon BIM implementation. Therefore, having acquaintance with the upcoming challenges and with the good practices to be followed might be key factors for the transition from CAD to BIM implementation to succeed. Considering that, the objective of this paper is to inquire about the challenges and the main requisites necessary to get the design process’ transition well finished. Through the guidelines found during the review of the literature and the research outcomes’ analysis, it was possible to assess the BIM implementation process at a contractor firm that builds residential and commercial buildings in the State of Paraná, Brazil. The results analysis shows that the company is having progress on the implementation of BIM workflow. However, there are important aspects that need to be reviewed to get the transition on track and to lead the company to reach the aimed benefits that BIM implementation might offer.
References
AGÊNCIA BRASILEIRA DE DESENVOLVIMENTO INDUSTRIAL. Guia 1 - Processo de Projeto BIM. [s.l:s.n.].
ASBEA. Fluxo de Projetos em BIM : Planejamento e Execução. Asbea, v. II, p. 24, 2015.
ASBEA. Guia ASBEA: Boas práticas em BIM. Fasciculo I. AsBEA., v. I, p. 20, 2013.
ASSOCIAÇÃO BRASILEIRA DE NORMAS TÉCNICAS. ABNT NBR 8160: sistemas prediais de esgotosanitário – projeto e execução. Rio de Janeiro: ABNT, 1999.
BARROS, R. A. M. L. DE; LIBRELOTTO, L. I.; MEDINA, F. Modelo BIM integrado gerindo o fluxo deinformações no processo de projeto. PARC Pesquisa em Arquitetura e Construção, v. 11, p.e020010, 2020.
CÂMARA... Volume 01 - Fundamentos BIM : Implementação do BIM para Construtoras eIncorporadorasCBIC- Câmara Brasileira da Indústria da Construção. [s.l: s.n.].
CARNEIRO, N. et al. EasyChair Preprint The Use of BIM 4D and BIM 5D Methodology for theConstruction Management : Systematic Review of the Literature. 2020.
DE WITTE, Diego Willian. A transição do processo de projeto CAD para a implementação do BIM:estudo de caso em uma incorporadora. 2021. Trabalho de Conclusão de Curso deEspecialização (Especialização em Engenharia Digital e Tecnologia BIM) – UniversidadeTecnológica Federal do Paraná, Curitiba, 2021.
EASTMAN, C. et al. BIM Handbook. 1st. ed. Hoboken, NJ, USA: John Wiley & Sons, Inc., 2008b.
MANENTI, E. M.; MARCHIORI, F. F.; CORRÊA, L. DE A. Plano de execução BIM: proposta de diretrizespara contratantes e fornecedores de projeto. Ambiente Construído, v. 20, n. 1, p. 65–85, 2020.
MANZIONE, L. Proposição de uma estrutura conceitual de gestão do processo de projetocolaborativo com o uso do BIM. São Paulo, 2013. 343 f. Tese (Doutorado em Engenharia Civil) —Escola Politécnica, Universidade de São Paulo, São Paulo, 2013.
MESSNER, J. et al. Building Information Modeling Execution Planning Guide. The Pennsylvania StateUniversity, v. 2.2, p. 158, 2019.
PARANÁ, (SECRETARIA DE INFRAESTRUTURA E LOGÍSTICA). Caderno BIM: coletânea de cadernosorientadores e caderno de especificações técnicas para contratação de projetos em BIM. [s.l:s.n.]. Disponível em: <http://www.paranaedificacoes.pr.gov.br/sites/paranaedificacoes/arquivos_restritos/files/documento/2020-07/caderno11_bim_2018_v41.pdf%0A>.
SOUZA, L. L. A. DE; AMORIM, S. R. L.; LYRIO, A. D. M. Impactos do Uso do BIM em Escritórios deArquitetura: Oportunidades no Mercado Imobiliário. Gestão & Tecnologia de Projetos, v. 4, n. 2, p.26–53, 2009.
SUCCAR, B. Building information modelling framework: A research and delivery foundation forindustry stakeholders. Automation in Construction, v. 18, n. 3, p. 357–375, 2009.